IRFP260NPBF – Infineon Technologies
April 26, 2026
Looking for the IRFP260NPBF by Infineon Technologies? This n-channel 200 v 50a (tc) 300w (tc) through hole to-247ac is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The IRFP260NPBF is classified under Transistors in the Discrete Semiconductor Products category, part of the HEXFET® series.
IRFP260NPBF Specifications
| Parameter |
Value |
| FET Type |
N-Channel |
| Technology |
MOSFET (Metal Oxide) |
| Drain to Source Voltage (Vdss) |
200 V |
| Current – Continuous Drain (Id) @ 25°C |
50A (Tc) |
| Drive Voltage (Max Rds On, Min Rds On) |
10V |
| Rds On (Max) @ Id, Vgs |
40mOhm @ 28A, 10V |
| Vgs(th) (Max) @ Id |
4V @ 250µA |
| Gate Charge (Qg) (Max) @ Vgs |
234 nC @ 10 V |
| Vgs (Max) |
±20V |
| Input Capacitance (Ciss) (Max) @ Vds |
4057 pF @ 25 V |
| Power Dissipation (Max) |
300W (Tc) |
| Operating Temperature |
-55°C ~ 175°C (TJ) |
| Mounting Type |
Through Hole |
| Supplier Device Package |
TO-247AC |
| Package / Case |
TO-247-3 |
Availability & Supply Status
- Status: Long Lead (25wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 10,160 units
- Standard Lead Time: 25 weeks
Datasheet
Download the official IRFP260NPBF datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source IRFP260NPBF from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the IRFP260NPBF? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
ESD5Z5.0T1G – onsemi
April 26, 2026
Looking for the ESD5Z5.0T1G by onsemi? This 18.6v clamp 9.4a (8/20µs) ipp tvs diode surface mount sod-523 is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The ESD5Z5.0T1G is classified under Transient Voltage Suppressors (TVS) in the Circuit Protection category.
ESD5Z5.0T1G Specifications
| Parameter |
Value |
| Type |
Zener |
| Unidirectional Channels |
1 |
| Voltage – Reverse Standoff (Typ) |
5V (Max) |
| Voltage – Breakdown (Min) |
6.2V |
| Voltage – Clamping (Max) @ Ipp |
18.6V |
| Current – Peak Pulse (10/1000µs) |
9.4A (8/20µs) |
| Power – Peak Pulse |
174W |
| Power Line Protection |
No |
| Applications |
General Purpose |
| Capacitance @ Frequency |
80pF @ 1MHz |
| Operating Temperature |
-55°C ~ 150°C (TJ) |
| Mounting Type |
Surface Mount |
| Package / Case |
SC-79, SOD-523 |
| Supplier Device Package |
SOD-523 |
Availability & Supply Status
- Status: Long Lead (54wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 62,721 units
- Standard Lead Time: 54 weeks
Datasheet
Download the official ESD5Z5.0T1G datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source ESD5Z5.0T1G from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the ESD5Z5.0T1G? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F767IGT6 – STMicroelectronics
April 26, 2026
Looking for the STM32F767IGT6 by STMicroelectronics? This arm® cortex®-m7 stm32f7 microcontroller ic 32-bit 216mhz 1mb (1m x 8) flash 176-lqfp (24×24) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F767IGT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F7 series.
STM32F767IGT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M7 |
| Core Size |
32-Bit |
| Speed |
216MHz |
| Connectivity |
CANbus, EBI/EMI, Ethernet, I2C, IrDA, LINbus, MMC/SD/SDIO, QSPI, SAI, SPDIF, SPI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT |
| Number of I/O |
140 |
| Program Memory Size |
1MB (1M x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
512K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.7V ~ 3.6V |
| Data Converters |
A/D 24x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
176-LQFP (24×24) |
| Package / Case |
176-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 707 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F767IGT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F767IGT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F767IGT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
SCT3060ALGC11 – Rohm Semiconductor
April 25, 2026
Looking for the SCT3060ALGC11 by Rohm Semiconductor? This n-channel 650 v 39a (tc) 165w (tc) through hole to-247n is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The SCT3060ALGC11 is classified under Transistors in the Discrete Semiconductor Products category.
SCT3060ALGC11 Specifications
| Parameter |
Value |
| FET Type |
N-Channel |
| Technology |
SiCFET (Silicon Carbide) |
| Drain to Source Voltage (Vdss) |
650 V |
| Current – Continuous Drain (Id) @ 25°C |
39A (Tc) |
| Drive Voltage (Max Rds On, Min Rds On) |
18V |
| Rds On (Max) @ Id, Vgs |
78mOhm @ 13A, 18V |
| Vgs(th) (Max) @ Id |
5.6V @ 6.67mA |
| Gate Charge (Qg) (Max) @ Vgs |
58 nC @ 18 V |
| Vgs (Max) |
+22V, -4V |
| Input Capacitance (Ciss) (Max) @ Vds |
852 pF @ 500 V |
| Power Dissipation (Max) |
165W (Tc) |
| Operating Temperature |
175°C (TJ) |
| Mounting Type |
Through Hole |
| Supplier Device Package |
TO-247N |
| Package / Case |
TO-247-3 |
Availability & Supply Status
- Status: Long Lead (27wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 982 units
- Standard Lead Time: 27 weeks
Datasheet
Download the official SCT3060ALGC11 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source SCT3060ALGC11 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the SCT3060ALGC11? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32G473MET6 – STMicroelectronics
April 25, 2026
Looking for the STM32G473MET6 by STMicroelectronics? This arm® cortex®-m4 stm32g4 microcontroller ic 32-bit 170mhz 512kb (512k x 8) flash 80-lqfp (12×12) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32G473MET6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32G4 series.
STM32G473MET6 Specifications
| Parameter |
Value |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
170MHz |
| Connectivity |
CANbus, I2C, IrDA, LINbus, QSPI, SAI, SPI, UART/USART, USB |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, POR, PWM, TRNG, WDT |
| Number of I/O |
66 |
| Program Memory Size |
512KB (512K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
128K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.71V ~ 3.6V |
| Data Converters |
A/D 41x12b SAR; D/A 7x12b |
| Oscillator Type |
External, Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
80-LQFP (12×12) |
| Package / Case |
80-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 661 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32G473MET6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32G473MET6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32G473MET6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
SN74AHCT132DBRG4 – Texas Instruments
April 25, 2026
Looking for the SN74AHCT132DBRG4 by Texas Instruments? This nand gate ic 4 channel schmitt trigger 14-ssop is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The SN74AHCT132DBRG4 is classified under Logic in the Integrated Circuits (ICs) category, part of the 74AHCT series.
SN74AHCT132DBRG4 Specifications
| Parameter |
Value |
| Logic Type |
NAND Gate |
| Number of Circuits |
4 |
| Number of Inputs |
2 |
| Features |
Schmitt Trigger |
| Voltage – Supply |
4.5V ~ 5.5V |
| Current – Quiescent (Max) |
2 µA |
| Current – Output High, Low |
8mA, 8mA |
| Input Logic Level – Low |
0.5V ~ 0.6V |
| Input Logic Level – High |
1.9V ~ 2.1V |
| Max Propagation Delay @ V, Max CL |
9ns @ 5V, 50pF |
| Operating Temperature |
-40°C ~ 85°C |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
14-SSOP |
| Package / Case |
14-SSOP (0.209", 5.30mm Width) |
Availability & Supply Status
- Status: Long Lead (28wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 1,990 units
- Standard Lead Time: 28 weeks
Datasheet
Download the official SN74AHCT132DBRG4 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source SN74AHCT132DBRG4 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the SN74AHCT132DBRG4? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F469VGT6 – STMicroelectronics
April 25, 2026
Looking for the STM32F469VGT6 by STMicroelectronics? This arm® cortex®-m4 stm32f4 microcontroller ic 32-bit 180mhz 1mb (1m x 8) flash 100-lqfp (14×14) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F469VGT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F4 series.
STM32F469VGT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
180MHz |
| Connectivity |
CANbus, EBI/EMI, Ethernet, I2C, IrDA, LINbus, SAI, SDIO, SPI, UART/USART, USB, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT |
| Number of I/O |
71 |
| Program Memory Size |
1MB (1M x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
384K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.7V ~ 3.6V |
| Data Converters |
A/D 14x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
100-LQFP (14×14) |
| Package / Case |
100-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 196 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F469VGT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F469VGT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F469VGT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
PESD5V0L4UG,115 – Nexperia USA Inc.
April 25, 2026
Looking for the PESD5V0L4UG,115 by Nexperia USA Inc.? This 13v clamp 2.5a (8/20µs) ipp tvs diode surface mount 5-tssop is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The PESD5V0L4UG,115 is classified under Transient Voltage Suppressors (TVS) in the Circuit Protection category.
PESD5V0L4UG,115 Specifications
| Parameter |
Value |
| Type |
Zener |
| Unidirectional Channels |
4 |
| Voltage – Reverse Standoff (Typ) |
5V (Max) |
| Voltage – Breakdown (Min) |
6.46V |
| Voltage – Clamping (Max) @ Ipp |
13V |
| Current – Peak Pulse (10/1000µs) |
2.5A (8/20µs) |
| Power – Peak Pulse |
30W |
| Power Line Protection |
No |
| Applications |
General Purpose |
| Capacitance @ Frequency |
16pF @ 1MHz |
| Operating Temperature |
-65°C ~ 150°C (TA) |
| Grade |
Automotive |
| Qualification |
AEC-Q100 |
| Mounting Type |
Surface Mount |
| Package / Case |
5-TSSOP, SC-70-5, SOT-353 |
| Supplier Device Package |
5-TSSOP |
Availability & Supply Status
- Status: Long Lead (26wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 25,636 units
- Standard Lead Time: 26 weeks
Datasheet
Download the official PESD5V0L4UG,115 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source PESD5V0L4UG,115 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the PESD5V0L4UG,115? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
SI4432-B1-FM – Silicon Labs
April 25, 2026
Looking for the SI4432-B1-FM by Silicon Labs? This ic rf txrx only general ism < 1ghz 240mhz ~ 930mhz 20-vfqfn exposed pad is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The SI4432-B1-FM is classified under RF Transceiver ICs in the RF and Wireless category.
SI4432-B1-FM Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Type |
TxRx Only |
| RF Family/Standard |
General ISM < 1GHz |
| Modulation |
FSK, GFSK, OOK |
| Frequency |
240MHz ~ 930MHz |
| Data Rate (Max) |
256kbps |
| Power – Output |
20dBm (Max) |
| Sensitivity |
-121dBm |
| Serial Interfaces |
SPI |
| GPIO |
3 |
| Voltage – Supply |
1.8V ~ 3.6V |
| Current – Receiving |
18.5mA |
| Current – Transmitting |
85mA |
| Operating Temperature |
-40°C ~ 85°C |
| Mounting Type |
Surface Mount |
| Package / Case |
20-VFQFN Exposed Pad |
| Supplier Device Package |
20-QFN (4×4) |
Availability & Supply Status
- Status: End of Life – Stock Available
- Lifecycle: End of Life
- Distribution Stock: 1,664 units
- Standard Lead Time: 12 weeks
Datasheet
Download the official SI4432-B1-FM datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source SI4432-B1-FM from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the SI4432-B1-FM? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32G473VET6 – STMicroelectronics
April 25, 2026
Looking for the STM32G473VET6 by STMicroelectronics? This arm® cortex®-m4 stm32g4 microcontroller ic 32-bit 170mhz 512kb (512k x 8) flash 100-lqfp (14×14) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32G473VET6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32G4 series.
STM32G473VET6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
170MHz |
| Connectivity |
CANbus, I2C, IrDA, LINbus, QSPI, SAI, SPI, UART/USART, USB |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, POR, PWM, WDT |
| Number of I/O |
86 |
| Program Memory Size |
512KB (512K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
128K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.71V ~ 3.6V |
| Data Converters |
A/D 42x12b; D/A 4x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
100-LQFP (14×14) |
| Package / Case |
100-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 502 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32G473VET6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32G473VET6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32G473VET6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.