IC ORDERS.com

STM32L476VET6 – STMicroelectronics

Looking for the STM32L476VET6 by STMicroelectronics? This arm® cortex®-m4 stm32l4 microcontroller ic 32-bit 80mhz 512kb (512k x 8) flash 100-lqfp (14×14) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The STM32L476VET6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32L4 series.

STM32L476VET6 Specifications

Parameter Value
DigiKey Programmable Not Verified
Core Processor ARM® Cortex®-M4
Core Size 32-Bit
Speed 80MHz
Connectivity CANbus, EBI/EMI, I2C, IrDA, LINbus, MMC/SD, QSPI, SAI, SPI, SWPMI, UART/USART, USB OTG
Peripherals Brown-out Detect/Reset, DMA, LCD, PWM, WDT
Number of I/O 82
Program Memory Size 512KB (512K x 8)
Program Memory Type FLASH
RAM Size 128K x 8
Voltage – Supply (Vcc/Vdd) 1.71V ~ 3.6V
Data Converters A/D 16x12b; D/A 2x12b
Oscillator Type Internal
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Supplier Device Package 100-LQFP (14×14)
Package / Case 100-LQFP

Availability & Supply Status

  • Status: Long Lead (30wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 5,415 units
  • Standard Lead Time: 30 weeks

Datasheet

Download the official STM32L476VET6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source STM32L476VET6 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the STM32L476VET6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


CYW43455XKUBGT – Infineon Technologies

Looking for the CYW43455XKUBGT by Infineon Technologies? This ic rf txrx + mcu bluetooth, wifi 802.11a/b/g/n, bluetooth v4.1 2.4ghz, 5ghz 140-ufbga, wlbga is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The CYW43455XKUBGT is classified under RF Transceiver ICs in the RF and Wireless category.

CYW43455XKUBGT Specifications

Parameter Value
DigiKey Programmable Not Verified
Type TxRx + MCU
RF Family/Standard Bluetooth, WiFi
Protocol 802.11a/b/g/n, Bluetooth v4.1
Modulation 8DPSK, DQPSK, GFSK
Frequency 2.4GHz, 5GHz
Data Rate (Max) 433.3Mbps
Power – Output 12dBm
Sensitivity -95.5dBm
Serial Interfaces I2S, SPI, UART
GPIO 15
Voltage – Supply 1.2V ~ 3.3V
Current – Receiving 55mA
Current – Transmitting 400mA
Operating Temperature -30°C ~ 85°C
Mounting Type Surface Mount
Package / Case 140-UFBGA, WLBGA
Supplier Device Package 140-WLBGA (4.47×5.27)

Availability & Supply Status

  • Status: End of Life – Stock Available
  • Lifecycle: End of Life
  • Distribution Stock: 4,975 units
  • Standard Lead Time: 22 weeks

Datasheet

Download the official CYW43455XKUBGT datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source CYW43455XKUBGT from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the CYW43455XKUBGT? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


STM32F207ZGT6 – STMicroelectronics

Looking for the STM32F207ZGT6 by STMicroelectronics? This arm® cortex®-m3 stm32f2 microcontroller ic 32-bit 120mhz 1mb (1m x 8) flash 144-lqfp (20×20) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The STM32F207ZGT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F2 series.

STM32F207ZGT6 Specifications

Parameter Value
DigiKey Programmable Verified
Core Processor ARM® Cortex®-M3
Core Size 32-Bit
Speed 120MHz
Connectivity CANbus, Ethernet, I2C, IrDA, LINbus, Memory Card, SPI, UART/USART, USB OTG
Peripherals Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT
Number of I/O 114
Program Memory Size 1MB (1M x 8)
Program Memory Type FLASH
RAM Size 132K x 8
Voltage – Supply (Vcc/Vdd) 1.8V ~ 3.6V
Data Converters A/D 24x12b; D/A 2x12b
Oscillator Type Internal
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Supplier Device Package 144-LQFP (20×20)
Package / Case 144-LQFP

Availability & Supply Status

  • Status: Long Lead (30wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 114 units
  • Standard Lead Time: 30 weeks

Datasheet

Download the official STM32F207ZGT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source STM32F207ZGT6 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the STM32F207ZGT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


STM32G474RCT6 – STMicroelectronics

Looking for the STM32G474RCT6 by STMicroelectronics? This arm® cortex®-m4f stm32g4 microcontroller ic 32-bit 170mhz 256kb (256k x 8) flash 64-lqfp (10×10) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The STM32G474RCT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32G4 series.

STM32G474RCT6 Specifications

Parameter Value
DigiKey Programmable Not Verified
Core Processor ARM® Cortex®-M4F
Core Size 32-Bit
Speed 170MHz
Connectivity CANbus, I2C, IrDA, LINbus, QSPI, SPI, UART/USART
Peripherals Brown-out Detect/Reset, DMA, I2S, POR, PWM, WDT
Number of I/O 52
Program Memory Size 256KB (256K x 8)
Program Memory Type FLASH
RAM Size 128K x 8
Voltage – Supply (Vcc/Vdd) 1.71V ~ 3.6V
Data Converters A/D 26x12b; D/A 7x12b
Oscillator Type Internal
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Supplier Device Package 64-LQFP (10×10)
Package / Case 64-LQFP

Availability & Supply Status

  • Status: Long Lead (30wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 1,255 units
  • Standard Lead Time: 30 weeks

Datasheet

Download the official STM32G474RCT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source STM32G474RCT6 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the STM32G474RCT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


STM32H742VGT6 – STMicroelectronics

Looking for the STM32H742VGT6 by STMicroelectronics? This arm® cortex®-m7 stm32h7 microcontroller ic 32-bit 480mhz 1mb (1m x 8) flash 100-lqfp (14×14) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The STM32H742VGT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32H7 series.

STM32H742VGT6 Specifications

Parameter Value
DigiKey Programmable Not Verified
Core Processor ARM® Cortex®-M7
Core Size 32-Bit
Speed 480MHz
Connectivity CANbus, EBI/EMI, Ethernet, I2C, IrDA, LINbus, MDIO, MMC/SD/SDIO, QSPI, SAI, SPDIF, SPI, SWPMI, UART/USART, USB OTG
Peripherals Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT
Number of I/O 82
Program Memory Size 1MB (1M x 8)
Program Memory Type FLASH
RAM Size 688K x 8
Voltage – Supply (Vcc/Vdd) 1.71V ~ 3.6V
Data Converters A/D 36x16b; D/A 2x12b
Oscillator Type Internal
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Supplier Device Package 100-LQFP (14×14)
Package / Case 100-LQFP

Availability & Supply Status

  • Status: Long Lead (30wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 693 units
  • Standard Lead Time: 30 weeks

Datasheet

Download the official STM32H742VGT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source STM32H742VGT6 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the STM32H742VGT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


STM32F405ZGT6 – STMicroelectronics

Looking for the STM32F405ZGT6 by STMicroelectronics? This arm® cortex®-m4 stm32f4 microcontroller ic 32-bit 168mhz 1mb (1m x 8) flash 144-lqfp (20×20) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The STM32F405ZGT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F4 series.

STM32F405ZGT6 Specifications

Parameter Value
DigiKey Programmable Verified
Core Processor ARM® Cortex®-M4
Core Size 32-Bit
Speed 168MHz
Connectivity CANbus, EBI/EMI, I2C, IrDA, LINbus, SPI, UART/USART, USB OTG
Peripherals Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT
Number of I/O 114
Program Memory Size 1MB (1M x 8)
Program Memory Type FLASH
RAM Size 192K x 8
Voltage – Supply (Vcc/Vdd) 1.8V ~ 3.6V
Data Converters A/D 24x12b; D/A 2x12b
Oscillator Type Internal
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Supplier Device Package 144-LQFP (20×20)
Package / Case 144-LQFP

Availability & Supply Status

  • Status: Long Lead (30wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 523 units
  • Standard Lead Time: 30 weeks

Datasheet

Download the official STM32F405ZGT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source STM32F405ZGT6 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the STM32F405ZGT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


STM32F091RCT6 – STMicroelectronics

Looking for the STM32F091RCT6 by STMicroelectronics? This arm® cortex®-m0 stm32f0 microcontroller ic 32-bit 48mhz 256kb (256k x 8) flash 64-lqfp (10×10) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The STM32F091RCT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F0 series.

STM32F091RCT6 Specifications

Parameter Value
DigiKey Programmable Not Verified
Core Processor ARM® Cortex®-M0
Core Size 32-Bit
Speed 48MHz
Connectivity CANbus, I2C, IrDA, LINbus, SPI, UART/USART
Peripherals DMA, I2S, POR, PWM, WDT
Number of I/O 52
Program Memory Size 256KB (256K x 8)
Program Memory Type FLASH
RAM Size 32K x 8
Voltage – Supply (Vcc/Vdd) 2V ~ 3.6V
Data Converters A/D 19x12b; D/A 2x12b
Oscillator Type Internal
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Supplier Device Package 64-LQFP (10×10)
Package / Case 64-LQFP

Availability & Supply Status

  • Status: Long Lead (30wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 2,107 units
  • Standard Lead Time: 30 weeks

Datasheet

Download the official STM32F091RCT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source STM32F091RCT6 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the STM32F091RCT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


MIMXRT1166DVM6A – NXP USA Inc.

Looking for the MIMXRT1166DVM6A by NXP USA Inc.? This arm® cortex®-m4/m7 i.mx microcontroller ic 32-bit dual-core 240mhz, 600mhz external program memory 289-lfbga (14×14) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The MIMXRT1166DVM6A is classified under Embedded in the Integrated Circuits (ICs) category, part of the i.MX series.

MIMXRT1166DVM6A Specifications

Parameter Value
DigiKey Programmable Not Verified
Core Processor ARM® Cortex®-M4/M7
Core Size 32-Bit Dual-Core
Speed 240MHz, 600MHz
Connectivity CANbus, EBI/EMI, Ethernet, I2C, MMC/SD/SDIO, SAI, SPDIF, SPI, UART/USART, USB OTG
Peripherals Brown-out Detect/Reset, DMA, POR, PWM, WDT
Program Memory Type External Program Memory
RAM Size 1M x 8
Voltage – Supply (Vcc/Vdd) 2.4V ~ 3.6V
Data Converters A/D 2x12b; D/A 1x12b
Oscillator Type Internal
Operating Temperature 0°C ~ 95°C (TJ)
Mounting Type Surface Mount
Supplier Device Package 289-LFBGA (14×14)
Package / Case 289-LFBGA

Availability & Supply Status

  • Status: End of Life – Stock Available
  • Lifecycle: End of Life
  • Distribution Stock: 453 units
  • Standard Lead Time: 19 weeks

Datasheet

Download the official MIMXRT1166DVM6A datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source MIMXRT1166DVM6A from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the MIMXRT1166DVM6A? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


IRF1405PBF – Infineon Technologies

Looking for the IRF1405PBF by Infineon Technologies? This n-channel 55 v 169a (tc) 330w (tc) through hole to-220ab is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The IRF1405PBF is classified under Transistors in the Discrete Semiconductor Products category, part of the HEXFET® series.

IRF1405PBF Specifications

Parameter Value
FET Type N-Channel
Technology MOSFET (Metal Oxide)
Drain to Source Voltage (Vdss) 55 V
Current – Continuous Drain (Id) @ 25°C 169A (Tc)
Drive Voltage (Max Rds On, Min Rds On) 10V
Rds On (Max) @ Id, Vgs 5.3mOhm @ 101A, 10V
Vgs(th) (Max) @ Id 4V @ 250µA
Gate Charge (Qg) (Max) @ Vgs 260 nC @ 10 V
Vgs (Max) ±20V
Input Capacitance (Ciss) (Max) @ Vds 5480 pF @ 25 V
Power Dissipation (Max) 330W (Tc)
Operating Temperature -55°C ~ 175°C (TJ)
Mounting Type Through Hole
Supplier Device Package TO-220AB
Package / Case TO-220-3

Availability & Supply Status

  • Status: Long Lead (35wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 11,715 units
  • Standard Lead Time: 35 weeks

Datasheet

Download the official IRF1405PBF datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source IRF1405PBF from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the IRF1405PBF? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


SCT3040KLGC11 – Rohm Semiconductor

Looking for the SCT3040KLGC11 by Rohm Semiconductor? This n-channel 1200 v 55a (tc) 262w (tc) through hole to-247n is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The SCT3040KLGC11 is classified under Transistors in the Discrete Semiconductor Products category.

SCT3040KLGC11 Specifications

Parameter Value
FET Type N-Channel
Technology SiCFET (Silicon Carbide)
Drain to Source Voltage (Vdss) 1200 V
Current – Continuous Drain (Id) @ 25°C 55A (Tc)
Drive Voltage (Max Rds On, Min Rds On) 18V
Rds On (Max) @ Id, Vgs 52mOhm @ 20A, 18V
Vgs(th) (Max) @ Id 5.6V @ 10mA
Gate Charge (Qg) (Max) @ Vgs 107 nC @ 18 V
Vgs (Max) +22V, -4V
Input Capacitance (Ciss) (Max) @ Vds 1337 pF @ 800 V
Power Dissipation (Max) 262W (Tc)
Operating Temperature 175°C (TJ)
Mounting Type Through Hole
Supplier Device Package TO-247N
Package / Case TO-247-3

Availability & Supply Status

  • Status: Long Lead (27wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 387 units
  • Standard Lead Time: 27 weeks

Datasheet

Download the official SCT3040KLGC11 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source SCT3040KLGC11 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the SCT3040KLGC11? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.