TC7660COA – Microchip Technology
May 20, 2026
Looking for the TC7660COA by Microchip Technology? This charge pump switching regulator ic positive or negative fixed -vin, 2vin 1 output 20ma 8-soic (0.154", 3.90mm width) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The TC7660COA is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.
TC7660COA Specifications
| Parameter |
Value |
| Function |
Ratiometric |
| Output Configuration |
Positive or Negative |
| Topology |
Charge Pump |
| Output Type |
Fixed |
| Number of Outputs |
1 |
| Voltage – Input (Min) |
1.5V |
| Voltage – Input (Max) |
10V |
| Voltage – Output (Min/Fixed) |
-Vin, 2Vin |
| Current – Output |
20mA |
| Frequency – Switching |
10kHz |
| Synchronous Rectifier |
No |
| Operating Temperature |
0°C ~ 70°C (TA) |
| Mounting Type |
Surface Mount |
| Package / Case |
8-SOIC (0.154", 3.90mm Width) |
| Supplier Device Package |
8-SOIC |
Availability & Supply Status
- Status: Long Lead (29wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 1,696 units
- Standard Lead Time: 29 weeks
Datasheet
Download the official TC7660COA datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source TC7660COA from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the TC7660COA? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
SGTL5000XNLA3R2 – NXP USA Inc.
May 20, 2026
Looking for the SGTL5000XNLA3R2 by NXP USA Inc.? This stereo audio interface i2c, serial, spi™ 20-qfn-ep (3×3) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The SGTL5000XNLA3R2 is classified under Interface in the Integrated Circuits (ICs) category.
SGTL5000XNLA3R2 Specifications
| Parameter |
Value |
| Type |
Stereo Audio |
| Data Interface |
I2C, Serial, SPI™ |
| Number of ADCs / DACs |
1 / 1 |
| Sigma Delta |
No |
| S/N Ratio, ADCs / DACs (db) Typ |
90 / 100 |
| Voltage – Supply, Analog |
1.62V ~ 3.6V |
| Voltage – Supply, Digital |
1.1V ~ 2V, 1.62V ~ 3.6V |
| Operating Temperature |
-40°C ~ 85°C |
| Mounting Type |
Surface Mount |
| Package / Case |
20-UFQFN Exposed Pad |
| Supplier Device Package |
20-QFN-EP (3×3) |
Availability & Supply Status
- Status: Long Lead (26wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 9,420 units
- Standard Lead Time: 26 weeks
Datasheet
Download the official SGTL5000XNLA3R2 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source SGTL5000XNLA3R2 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the SGTL5000XNLA3R2? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32L452CCU6 – STMicroelectronics
May 20, 2026
Looking for the STM32L452CCU6 by STMicroelectronics? This arm® cortex®-m4 stm32l4 microcontroller ic 32-bit 80mhz 256kb (256k x 8) flash 48-ufqfpn (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32L452CCU6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32L4 series.
STM32L452CCU6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
80MHz |
| Connectivity |
CANbus, I2C, IrDA, LINbus, QSPI, SAI, SPI, UART/USART, USB |
| Peripherals |
Brown-out Detect/Reset, DMA, PWM, WDT |
| Number of I/O |
38 |
| Program Memory Size |
256KB (256K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
160K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.71V ~ 3.6V |
| Data Converters |
A/D 10x12b; D/A 1x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
48-UFQFPN (7×7) |
| Package / Case |
48-UFQFN Exposed Pad |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 1,067 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32L452CCU6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32L452CCU6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32L452CCU6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F205VFT6 – STMicroelectronics
May 20, 2026
Looking for the STM32F205VFT6 by STMicroelectronics? This arm® cortex®-m3 stm32f2 microcontroller ic 32-bit 120mhz 768kb (768k x 8) flash 100-lqfp (14×14) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F205VFT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F2 series.
STM32F205VFT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M3 |
| Core Size |
32-Bit |
| Speed |
120MHz |
| Connectivity |
CANbus, I2C, IrDA, LINbus, MMC, SPI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT |
| Number of I/O |
82 |
| Program Memory Size |
768KB (768K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
132K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.8V ~ 3.6V |
| Data Converters |
A/D 16x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
100-LQFP (14×14) |
| Package / Case |
100-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 385 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F205VFT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F205VFT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F205VFT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F100C4T6B – STMicroelectronics
May 20, 2026
Looking for the STM32F100C4T6B by STMicroelectronics? This arm® cortex®-m3 stm32f1 microcontroller ic 32-bit 24mhz 16kb (16k x 8) flash 48-lqfp (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F100C4T6B is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F1 series.
STM32F100C4T6B Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M3 |
| Core Size |
32-Bit |
| Speed |
24MHz |
| Connectivity |
I2C, IrDA, LINbus, SPI, UART/USART |
| Peripherals |
DMA, PDR, POR, PVD, PWM, Temp Sensor, WDT |
| Number of I/O |
37 |
| Program Memory Size |
16KB (16K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
4K x 8 |
| Voltage – Supply (Vcc/Vdd) |
2V ~ 3.6V |
| Data Converters |
A/D 10x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
48-LQFP (7×7) |
| Package / Case |
48-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 13,614 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F100C4T6B datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F100C4T6B from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F100C4T6B? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32WL55CCU6 – STMicroelectronics
May 19, 2026
Looking for the STM32WL55CCU6 by STMicroelectronics? This ic rf txrx + mcu 802.15.4 lorawan 1.0, sigfox 150mhz ~ 960mhz 48-ufqfn exposed pad is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32WL55CCU6 is classified under RF Transceiver ICs in the RF and Wireless category, part of the STM32WL series.
STM32WL55CCU6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Type |
TxRx + MCU |
| RF Family/Standard |
802.15.4 |
| Protocol |
LoRaWAN 1.0, Sigfox |
| Modulation |
BPSK, GFSK, GMSK, FSK, MSK |
| Frequency |
150MHz ~ 960MHz |
| Data Rate (Max) |
300kbps |
| Power – Output |
22dBm |
| Sensitivity |
-148dBm |
| Memory Size |
256kB Flash |
| Serial Interfaces |
ADC, GPIO, I2C, SPI, IrDA, UART, USART |
| GPIO |
29 |
| Voltage – Supply |
1.8V ~ 3.6V |
| Current – Receiving |
4.82mA |
| Current – Transmitting |
21mA ~ 120mA |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Package / Case |
48-UFQFN Exposed Pad |
| Supplier Device Package |
48-UFQFPN (7×7) |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 1,115 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32WL55CCU6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32WL55CCU6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32WL55CCU6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
QPF4216BTR13 – Qorvo
May 19, 2026
Looking for the QPF4216BTR13 by Qorvo? This rf front end is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The QPF4216BTR13 is classified under RF Front End (LNA + PA) in the RF and Wireless category.
Availability & Supply Status
- Status: Long Lead (35wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 2,447 units
- Standard Lead Time: 35 weeks
Datasheet
Download the official QPF4216BTR13 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source QPF4216BTR13 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the QPF4216BTR13? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F411CCU6TR – STMicroelectronics
May 19, 2026
Looking for the STM32F411CCU6TR by STMicroelectronics? This arm® cortex®-m4 stm32f4 microcontroller ic 32-bit 100mhz 256kb (256k x 8) flash 48-ufqfpn (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F411CCU6TR is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F4 series.
STM32F411CCU6TR Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
100MHz |
| Connectivity |
I2C, IrDA, LINbus, MMC/SD/SDIO, SPI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, POR, PWM, WDT |
| Number of I/O |
36 |
| Program Memory Size |
256KB (256K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
128K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.7V ~ 3.6V |
| Data Converters |
A/D 10x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
48-UFQFPN (7×7) |
| Package / Case |
48-UFQFN Exposed Pad |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 16,051 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F411CCU6TR datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F411CCU6TR from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F411CCU6TR? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32H745XIH6 – STMicroelectronics
May 19, 2026
Looking for the STM32H745XIH6 by STMicroelectronics? This arm® cortex®-m4/m7 stm32h7 microcontroller ic 32-bit dual-core 240mhz, 480mhz 2mb (2m x 8) flash 240+25-tfbga (14×14) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32H745XIH6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32H7 series.
STM32H745XIH6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4/M7 |
| Core Size |
32-Bit Dual-Core |
| Speed |
240MHz, 480MHz |
| Connectivity |
CANbus, EBI/EMI, Ethernet, I2C, IrDA, LINbus, MDIO, MMC/SD/SDIO, QSPI, SAI, SPDIF, SPI, SWPMI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT |
| Number of I/O |
168 |
| Program Memory Size |
2MB (2M x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
1M x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.62V ~ 3.6V |
| Data Converters |
A/D 36x16b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
240+25-TFBGA (14×14) |
| Package / Case |
265-TFBGA |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 1,447 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32H745XIH6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32H745XIH6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32H745XIH6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32L4R9ZGJ6 – STMicroelectronics
May 19, 2026
Looking for the STM32L4R9ZGJ6 by STMicroelectronics? This arm® cortex®-m4 stm32l4 microcontroller ic 32-bit 120mhz 1mb (1m x 8) flash 144-ufbga (10×10) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32L4R9ZGJ6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32L4 series.
STM32L4R9ZGJ6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
120MHz |
| Connectivity |
CANbus, EBI/EMI, I2C, IrDA, LINbus, MMC/SD, SAI, SPI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, LCD, POR, PWM, WDT |
| Number of I/O |
112 |
| Program Memory Size |
1MB (1M x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
640K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.71V ~ 3.6V |
| Data Converters |
A/D 16x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
144-UFBGA (10×10) |
| Package / Case |
144-UFBGA |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 1,861 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32L4R9ZGJ6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32L4R9ZGJ6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32L4R9ZGJ6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.