ESP32-H2-MINI-1-N2 – Espressif Systems
May 15, 2026
Looking for the ESP32-H2-MINI-1-N2 by Espressif Systems? This 802.15.4, bluetooth, wifi bluetooth v5.0, thread, zigbee® transceiver module 2.4ghz pcb trace surface mount is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The ESP32-H2-MINI-1-N2 is classified under RF Transceiver Modules and Modems in the RF and Wireless category, part of the ESP32-H2 series.
ESP32-H2-MINI-1-N2 Specifications
| Parameter |
Value |
| RF Family/Standard |
802.15.4, Bluetooth, WiFi |
| Protocol |
Bluetooth v5.0, Thread, Zigbee® |
| Frequency |
2.4GHz |
| Serial Interfaces |
I2C, I2S, PWM, SPI, UART, USB |
| Antenna Type |
PCB Trace |
| Utilized IC / Part |
ESP32 |
| Memory Size |
256kB SRAM |
| Mounting Type |
Surface Mount |
| Package / Case |
53-SMD Module |
Availability & Supply Status
- Status: End of Life – Stock Available
- Lifecycle: End of Life
- Distribution Stock: 227 units
- Standard Lead Time: 12 weeks
Datasheet
Download the official ESP32-H2-MINI-1-N2 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source ESP32-H2-MINI-1-N2 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the ESP32-H2-MINI-1-N2? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32L475RGT6 – STMicroelectronics
May 15, 2026
Looking for the STM32L475RGT6 by STMicroelectronics? This arm® cortex®-m4 stm32l4 microcontroller ic 32-bit 80mhz 1mb (1m x 8) flash 64-lqfp (10×10) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32L475RGT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32L4 series.
STM32L475RGT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
80MHz |
| Connectivity |
CANbus, I2C, IrDA, LINbus, MMC/SD, QSPI, SAI, SPI, SWPMI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, PWM, WDT |
| Number of I/O |
51 |
| Program Memory Size |
1MB (1M x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
128K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.71V ~ 3.6V |
| Data Converters |
A/D 16x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
64-LQFP (10×10) |
| Package / Case |
64-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 7,914 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32L475RGT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32L475RGT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32L475RGT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F101VFT6 – STMicroelectronics
May 15, 2026
Looking for the STM32F101VFT6 by STMicroelectronics? This arm® cortex®-m3 stm32f1 microcontroller ic 32-bit 36mhz 768kb (768k x 8) flash 100-lqfp (14×14) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F101VFT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F1 series.
STM32F101VFT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M3 |
| Core Size |
32-Bit |
| Speed |
36MHz |
| Connectivity |
I2C, IrDA, LINbus, SPI, UART/USART |
| Peripherals |
DMA, PDR, POR, PVD, PWM, Temp Sensor, WDT |
| Number of I/O |
80 |
| Program Memory Size |
768KB (768K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
80K x 8 |
| Voltage – Supply (Vcc/Vdd) |
2V ~ 3.6V |
| Data Converters |
A/D 16x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
100-LQFP (14×14) |
| Package / Case |
100-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 262 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F101VFT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F101VFT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F101VFT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F722VCT6 – STMicroelectronics
May 15, 2026
Looking for the STM32F722VCT6 by STMicroelectronics? This arm® cortex®-m7 stm32f7 microcontroller ic 32-bit 216mhz 256kb (256k x 8) flash 100-lqfp (14×14) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F722VCT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F7 series.
STM32F722VCT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Verified |
| Core Processor |
ARM® Cortex®-M7 |
| Core Size |
32-Bit |
| Speed |
216MHz |
| Connectivity |
CANbus, EBI/EMI, I2C, IrDA, LINbus, MMC/SD, QSPI, SAI, SPI, UART/USART, USB |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, POR, PWM, WDT |
| Number of I/O |
82 |
| Program Memory Size |
256KB (256K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
256K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.7V ~ 3.6V |
| Data Converters |
A/D 16x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
100-LQFP (14×14) |
| Package / Case |
100-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 125 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F722VCT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F722VCT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F722VCT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F411RET6 – STMicroelectronics
May 15, 2026
Looking for the STM32F411RET6 by STMicroelectronics? This arm® cortex®-m4 stm32f4 microcontroller ic 32-bit 100mhz 512kb (512k x 8) flash 64-lqfp (10×10) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F411RET6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F4 series.
STM32F411RET6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
100MHz |
| Connectivity |
I2C, IrDA, LINbus, MMC/SD/SDIO, SPI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, POR, PWM, WDT |
| Number of I/O |
50 |
| Program Memory Size |
512KB (512K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
128K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.7V ~ 3.6V |
| Data Converters |
A/D 16x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
64-LQFP (10×10) |
| Package / Case |
64-LQFP |
Availability & Supply Status
- Status: Long Lead (52wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 2,612 units
- Standard Lead Time: 52 weeks
Datasheet
Download the official STM32F411RET6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F411RET6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F411RET6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F722VET6 – STMicroelectronics
May 15, 2026
Looking for the STM32F722VET6 by STMicroelectronics? This arm® cortex®-m7 stm32f7 microcontroller ic 32-bit 216mhz 512kb (512k x 8) flash 100-lqfp (14×14) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F722VET6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F7 series.
STM32F722VET6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Verified |
| Core Processor |
ARM® Cortex®-M7 |
| Core Size |
32-Bit |
| Speed |
216MHz |
| Connectivity |
CANbus, EBI/EMI, I2C, IrDA, LINbus, MMC/SD, QSPI, SAI, SPI, UART/USART, USB |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, POR, PWM, WDT |
| Number of I/O |
82 |
| Program Memory Size |
512KB (512K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
256K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.7V ~ 3.6V |
| Data Converters |
A/D 16x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
100-LQFP (14×14) |
| Package / Case |
100-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 600 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F722VET6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F722VET6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F722VET6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
AD8226ARZ – Analog Devices Inc.
May 14, 2026
Looking for the AD8226ARZ by Analog Devices Inc.? This instrumentation amplifier 1 circuit rail-to-rail 8-soic is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The AD8226ARZ is classified under Linear in the Integrated Circuits (ICs) category.
AD8226ARZ Specifications
| Parameter |
Value |
| Amplifier Type |
Instrumentation |
| Number of Circuits |
1 |
| Output Type |
Rail-to-Rail |
| Slew Rate |
0.6V/µs |
| -3db Bandwidth |
1.5 MHz |
| Current – Input Bias |
20 nA |
| Voltage – Input Offset |
100 µV |
| Current – Supply |
350µA |
| Current – Output / Channel |
13 mA |
| Voltage – Supply Span (Min) |
2.2 V |
| Voltage – Supply Span (Max) |
36 V |
| Operating Temperature |
-40°C ~ 125°C |
| Mounting Type |
Surface Mount |
| Package / Case |
8-SOIC (0.154", 3.90mm Width) |
| Supplier Device Package |
8-SOIC |
Availability & Supply Status
- Status: Long Lead (39wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 1,469 units
- Standard Lead Time: 39 weeks
Datasheet
Download the official AD8226ARZ datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source AD8226ARZ from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the AD8226ARZ? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
MP2315SGJ-Z – Monolithic Power Systems Inc.
May 14, 2026
Looking for the MP2315SGJ-Z by Monolithic Power Systems Inc.? This buck switching regulator ic positive adjustable 0.8v 1 output 3a sot-23-8 thin, tsot-23-8 is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The MP2315SGJ-Z is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.
MP2315SGJ-Z Specifications
| Parameter |
Value |
| Function |
Step-Down |
| Output Configuration |
Positive |
| Topology |
Buck |
| Output Type |
Adjustable |
| Number of Outputs |
1 |
| Voltage – Input (Min) |
4.5V |
| Voltage – Input (Max) |
24V |
| Voltage – Output (Min/Fixed) |
0.8V |
| Voltage – Output (Max) |
22.8V |
| Current – Output |
3A |
| Frequency – Switching |
500kHz |
| Synchronous Rectifier |
Yes |
| Operating Temperature |
-40°C ~ 125°C (TJ) |
| Mounting Type |
Surface Mount |
| Package / Case |
SOT-23-8 Thin, TSOT-23-8 |
| Supplier Device Package |
TSOT-23-8 |
Availability & Supply Status
- Status: Long Lead (32wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 527 units
- Standard Lead Time: 32 weeks
Datasheet
Download the official MP2315SGJ-Z datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source MP2315SGJ-Z from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the MP2315SGJ-Z? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
IIS2ICLXTR – STMicroelectronics
May 14, 2026
Looking for the IIS2ICLXTR by STMicroelectronics? This accelerometer x, y axis ±0.5g, 1g, 2g, 3g is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The IIS2ICLXTR is classified under Motion Sensors in the Sensors, Transducers category.
IIS2ICLXTR Specifications
| Parameter |
Value |
| Axis |
X, Y |
| Acceleration Range |
±0.5g, 1g, 2g, 3g |
| Output Type |
I2C, SPI |
| Voltage – Supply |
1.71V ~ 3.6V |
| Operating Temperature |
-40°C ~ 105°C |
Availability & Supply Status
- Status: Long Lead (24wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 11,537 units
- Standard Lead Time: 24 weeks
Datasheet
Download the official IIS2ICLXTR datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source IIS2ICLXTR from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the IIS2ICLXTR? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F302RBT6 – STMicroelectronics
May 14, 2026
Looking for the STM32F302RBT6 by STMicroelectronics? This arm® cortex®-m4 stm32f3 microcontroller ic 32-bit 72mhz 128kb (128k x 8) flash 64-lqfp (10×10) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F302RBT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F3 series.
STM32F302RBT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
72MHz |
| Connectivity |
CANbus, I2C, IrDA, LINbus, SPI, UART/USART, USB |
| Peripherals |
DMA, I2S, POR, PWM, WDT |
| Number of I/O |
52 |
| Program Memory Size |
128KB (128K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
32K x 8 |
| Voltage – Supply (Vcc/Vdd) |
2V ~ 3.6V |
| Data Converters |
A/D 16x12b; D/A 1x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
64-LQFP (10×10) |
| Package / Case |
64-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 189 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F302RBT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F302RBT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F302RBT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.