IRF9530NPBF – Infineon Technologies
May 12, 2026
Looking for the IRF9530NPBF by Infineon Technologies? This p-channel 100 v 14a (tc) 79w (tc) through hole to-220ab is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The IRF9530NPBF is classified under Transistors in the Discrete Semiconductor Products category, part of the HEXFET® series.
IRF9530NPBF Specifications
| Parameter |
Value |
| FET Type |
P-Channel |
| Technology |
MOSFET (Metal Oxide) |
| Drain to Source Voltage (Vdss) |
100 V |
| Current – Continuous Drain (Id) @ 25°C |
14A (Tc) |
| Drive Voltage (Max Rds On, Min Rds On) |
10V |
| Rds On (Max) @ Id, Vgs |
200mOhm @ 8.4A, 10V |
| Vgs(th) (Max) @ Id |
4V @ 250µA |
| Gate Charge (Qg) (Max) @ Vgs |
58 nC @ 10 V |
| Vgs (Max) |
±20V |
| Input Capacitance (Ciss) (Max) @ Vds |
760 pF @ 25 V |
| Power Dissipation (Max) |
79W (Tc) |
| Operating Temperature |
-55°C ~ 175°C (TJ) |
| Mounting Type |
Through Hole |
| Supplier Device Package |
TO-220AB |
| Package / Case |
TO-220-3 |
Availability & Supply Status
- Status: Long Lead (23wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 20,927 units
- Standard Lead Time: 23 weeks
Datasheet
Download the official IRF9530NPBF datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source IRF9530NPBF from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the IRF9530NPBF? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32H753VIT6 – STMicroelectronics
May 12, 2026
Looking for the STM32H753VIT6 by STMicroelectronics? This arm® cortex®-m7 stm32h7 microcontroller ic 32-bit 480mhz 2mb (2m x 8) flash 100-lqfp (14×14) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32H753VIT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32H7 series.
STM32H753VIT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Verified |
| Core Processor |
ARM® Cortex®-M7 |
| Core Size |
32-Bit |
| Speed |
480MHz |
| Connectivity |
CANbus, EBI/EMI, Ethernet, I2C, IrDA, LINbus, MDIO, MMC/SD/SDIO, QSPI, SAI, SPDIF, SPI, SWPMI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT |
| Number of I/O |
82 |
| Program Memory Size |
2MB (2M x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
1M x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.71V ~ 3.6V |
| Data Converters |
A/D 16x16b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
100-LQFP (14×14) |
| Package / Case |
100-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 3,717 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32H753VIT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32H753VIT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32H753VIT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F302R6T6 – STMicroelectronics
May 12, 2026
Looking for the STM32F302R6T6 by STMicroelectronics? This arm® cortex®-m4 stm32f3 microcontroller ic 32-bit 72mhz 32kb (32k x 8) flash 64-lqfp (10×10) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F302R6T6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F3 series.
STM32F302R6T6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
72MHz |
| Connectivity |
CANbus, I2C, IrDA, LINbus, SPI, UART/USART, USB |
| Peripherals |
DMA, I2S, POR, PWM, WDT |
| Number of I/O |
51 |
| Program Memory Size |
32KB (32K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
16K x 8 |
| Voltage – Supply (Vcc/Vdd) |
2V ~ 3.6V |
| Data Converters |
A/D 15x12b; D/A 1x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
64-LQFP (10×10) |
| Package / Case |
64-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 538 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F302R6T6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F302R6T6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F302R6T6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F746IGT6 – STMicroelectronics
May 11, 2026
Looking for the STM32F746IGT6 by STMicroelectronics? This arm® cortex®-m7 stm32f7 microcontroller ic 32-bit 216mhz 1mb (1m x 8) flash 176-lqfp (24×24) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F746IGT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F7 series.
STM32F746IGT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M7 |
| Core Size |
32-Bit |
| Speed |
216MHz |
| Connectivity |
CANbus, EBI/EMI, Ethernet, I2C, IrDA, LINbus, SAI, SD, SPDIF-Rx, SPI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT |
| Number of I/O |
140 |
| Program Memory Size |
1MB (1M x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
320K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.7V ~ 3.6V |
| Data Converters |
A/D 24x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
176-LQFP (24×24) |
| Package / Case |
176-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 125 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F746IGT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F746IGT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F746IGT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32G484CEU6 – STMicroelectronics
May 11, 2026
Looking for the STM32G484CEU6 by STMicroelectronics? This arm® cortex®-m4 stm32g4 microcontroller ic 32-bit 170mhz 512kb (512k x 8) flash 48-ufqfpn (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32G484CEU6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32G4 series.
STM32G484CEU6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
170MHz |
| Connectivity |
CANbus, I2C, IrDA, LINbus, QSPI, SAI, SPI, UART/USART, USB |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, POR, PWM, WDT |
| Number of I/O |
42 |
| Program Memory Size |
512KB (512K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
128K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.71V ~ 3.6V |
| Data Converters |
A/D 21x12b; D/A 4x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
48-UFQFPN (7×7) |
| Package / Case |
48-UFQFN Exposed Pad |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 1,428 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32G484CEU6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32G484CEU6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32G484CEU6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32WB35CEU6A – STMicroelectronics
May 11, 2026
Looking for the STM32WB35CEU6A by STMicroelectronics? This ic rf txrx + mcu 802.15.4, bluetooth bluetooth v5.3, zigbee® 2.4ghz 48-ufqfn exposed pad is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32WB35CEU6A is classified under RF Transceiver ICs in the RF and Wireless category, part of the STM32WB35xx series.
STM32WB35CEU6A Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Type |
TxRx + MCU |
| RF Family/Standard |
802.15.4, Bluetooth |
| Protocol |
Bluetooth v5.3, Zigbee® |
| Frequency |
2.4GHz |
| Data Rate (Max) |
2Mbps |
| Power – Output |
6dBm |
| Sensitivity |
-100dBm |
| Memory Size |
512kB Flash, 96kB SRAM |
| Serial Interfaces |
ADC, GPIO, I2C, I2S, IrDA, JTAG, PWM, SPI, UART, USART |
| GPIO |
30 |
| Voltage – Supply |
1.71V ~ 3.6V |
| Current – Receiving |
4.5mA ~ 7.9mA |
| Current – Transmitting |
5.2mA ~ 12.7mA |
| Operating Temperature |
-40°C ~ 105°C (TA) |
| Mounting Type |
Surface Mount |
| Package / Case |
48-UFQFN Exposed Pad |
| Supplier Device Package |
48-UFQFPN (7×7) |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 923 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32WB35CEU6A datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32WB35CEU6A from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32WB35CEU6A? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
IRF1404ZPBF – Infineon Technologies
May 11, 2026
Looking for the IRF1404ZPBF by Infineon Technologies? This n-channel 40 v 180a (tc) 200w (tc) through hole to-220ab is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The IRF1404ZPBF is classified under Transistors in the Discrete Semiconductor Products category, part of the HEXFET® series.
IRF1404ZPBF Specifications
| Parameter |
Value |
| FET Type |
N-Channel |
| Technology |
MOSFET (Metal Oxide) |
| Drain to Source Voltage (Vdss) |
40 V |
| Current – Continuous Drain (Id) @ 25°C |
180A (Tc) |
| Drive Voltage (Max Rds On, Min Rds On) |
10V |
| Rds On (Max) @ Id, Vgs |
3.7mOhm @ 75A, 10V |
| Vgs(th) (Max) @ Id |
4V @ 250µA |
| Gate Charge (Qg) (Max) @ Vgs |
150 nC @ 10 V |
| Vgs (Max) |
±20V |
| Input Capacitance (Ciss) (Max) @ Vds |
4340 pF @ 25 V |
| Power Dissipation (Max) |
200W (Tc) |
| Operating Temperature |
-55°C ~ 175°C (TJ) |
| Mounting Type |
Through Hole |
| Supplier Device Package |
TO-220AB |
| Package / Case |
TO-220-3 |
Availability & Supply Status
- Status: Long Lead (33wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 774 units
- Standard Lead Time: 33 weeks
Datasheet
Download the official IRF1404ZPBF datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source IRF1404ZPBF from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the IRF1404ZPBF? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
IPB60R099C6ATMA1 – Infineon Technologies
May 11, 2026
Looking for the IPB60R099C6ATMA1 by Infineon Technologies? This n-channel 600 v 37.9a (tc) 278w (tc) surface mount pg-to263-3 is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The IPB60R099C6ATMA1 is classified under Transistors in the Discrete Semiconductor Products category, part of the CoolMOS™ C6 series.
IPB60R099C6ATMA1 Specifications
| Parameter |
Value |
| FET Type |
N-Channel |
| Technology |
MOSFET (Metal Oxide) |
| Drain to Source Voltage (Vdss) |
600 V |
| Current – Continuous Drain (Id) @ 25°C |
37.9A (Tc) |
| Drive Voltage (Max Rds On, Min Rds On) |
10V |
| Rds On (Max) @ Id, Vgs |
99mOhm @ 18.1A, 10V |
| Vgs(th) (Max) @ Id |
3.5V @ 1.21mA |
| Gate Charge (Qg) (Max) @ Vgs |
119 nC @ 10 V |
| Vgs (Max) |
±20V |
| Input Capacitance (Ciss) (Max) @ Vds |
2660 pF @ 100 V |
| Power Dissipation (Max) |
278W (Tc) |
| Operating Temperature |
-55°C ~ 150°C (TJ) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
PG-TO263-3 |
| Package / Case |
TO-263-3, D2PAK (2 Leads + Tab), TO-263AB |
Availability & Supply Status
- Status: End of Life – Stock Available
- Lifecycle: End of Life
- Distribution Stock: 3,340 units
- Standard Lead Time: 17 weeks
Datasheet
Download the official IPB60R099C6ATMA1 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source IPB60R099C6ATMA1 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the IPB60R099C6ATMA1? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32L471QGI6 – STMicroelectronics
May 11, 2026
Looking for the STM32L471QGI6 by STMicroelectronics? This arm® cortex®-m4 stm32l4 microcontroller ic 32-bit 80mhz 1mb (1m x 8) flash 132-ufbga (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32L471QGI6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32L4 series.
STM32L471QGI6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
80MHz |
| Connectivity |
CANbus, EBI/EMI, I2C, IrDA, LINbus, MMC/SD, QSPI, SAI, SPI, SWPMI, UART/USART |
| Peripherals |
Brown-out Detect/Reset, DMA, PWM, WDT |
| Number of I/O |
109 |
| Program Memory Size |
1MB (1M x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
128K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.71V ~ 3.6V |
| Data Converters |
A/D 19x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
132-UFBGA (7×7) |
| Package / Case |
132-UFBGA |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 2,360 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32L471QGI6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32L471QGI6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32L471QGI6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
AP2112K-2.5TRG1 – Diodes Incorporated
May 11, 2026
Looking for the AP2112K-2.5TRG1 by Diodes Incorporated? This linear voltage regulator ic positive fixed 1 output 600ma sot-25 is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The AP2112K-2.5TRG1 is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.
AP2112K-2.5TRG1 Specifications
| Parameter |
Value |
| Output Configuration |
Positive |
| Output Type |
Fixed |
| Number of Regulators |
1 |
| Voltage – Input (Max) |
6V |
| Voltage – Output (Min/Fixed) |
2.5V |
| Voltage Dropout (Max) |
0.4V @ 600mA |
| Current – Output |
600mA |
| Current – Quiescent (Iq) |
80 µA |
| PSRR |
65dB (100Hz ~ 1kHz) |
| Control Features |
Enable |
| Protection Features |
Over Current, Over Temperature |
| Operating Temperature |
-40°C ~ 85°C |
| Mounting Type |
Surface Mount |
| Package / Case |
SC-74A, SOT-753 |
| Supplier Device Package |
SOT-25 |
Availability & Supply Status
- Status: Long Lead (24wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 238 units
- Standard Lead Time: 24 weeks
Datasheet
Download the official AP2112K-2.5TRG1 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source AP2112K-2.5TRG1 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the AP2112K-2.5TRG1? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.