IC ORDERS.com

NCV4275ADT50RKG – onsemi

Looking for the NCV4275ADT50RKG by onsemi? This linear voltage regulator ic positive fixed 1 output 450ma dpak-5 is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The NCV4275ADT50RKG is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.

NCV4275ADT50RKG Specifications

Parameter Value
Output Configuration Positive
Output Type Fixed
Number of Regulators 1
Voltage – Input (Max) 42V
Voltage – Output (Min/Fixed) 5V
Voltage Dropout (Max) 0.5V @ 300mA
Current – Output 450mA
Current – Quiescent (Iq) 200 µA
Current – Supply (Max) 35 mA
PSRR 60dB (100Hz)
Control Features Reset
Protection Features Over Temperature, Reverse Polarity, Short Circuit
Operating Temperature -40°C ~ 150°C (TJ)
Grade Automotive
Qualification AEC-Q100
Mounting Type Surface Mount
Package / Case TO-252-5, DPAK (4 Leads + Tab), TO-252AD
Supplier Device Package DPAK-5

Availability & Supply Status

  • Status: End of Life – Stock Available
  • Lifecycle: End of Life
  • Distribution Stock: 10,427 units
  • Manufacturer Stock: 35,000 units
  • Standard Lead Time: 8 weeks

Datasheet

Download the official NCV4275ADT50RKG datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source NCV4275ADT50RKG from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the NCV4275ADT50RKG? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


STM32G031G8U6 – STMicroelectronics

Looking for the STM32G031G8U6 by STMicroelectronics? This arm® cortex®-m0+ stm32g0 microcontroller ic 32-bit 64mhz 64kb (64k x 8) flash 28-ufqfpn (4×4) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The STM32G031G8U6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32G0 series.

STM32G031G8U6 Specifications

Parameter Value
DigiKey Programmable Not Verified
Core Processor ARM® Cortex®-M0+
Core Size 32-Bit
Speed 64MHz
Connectivity I2C, IrDA, LINbus, SPI, SmartCard, UART/USART
Peripherals Brown-out Detect/Reset, DMA, I2S, POR, PWM, WDT
Number of I/O 26
Program Memory Size 64KB (64K x 8)
Program Memory Type FLASH
RAM Size 8K x 8
Voltage – Supply (Vcc/Vdd) 1.7V ~ 3.6V
Data Converters A/D 17x12b SAR
Oscillator Type External, Internal
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Supplier Device Package 28-UFQFPN (4×4)
Package / Case 28-UFQFN

Availability & Supply Status

  • Status: Long Lead (30wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 7,761 units
  • Standard Lead Time: 30 weeks

Datasheet

Download the official STM32G031G8U6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source STM32G031G8U6 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the STM32G031G8U6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


STM32F373VBT6 – STMicroelectronics

Looking for the STM32F373VBT6 by STMicroelectronics? This arm® cortex®-m4 stm32f3 microcontroller ic 32-bit 72mhz 128kb (128k x 8) flash 100-lqfp (14×14) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The STM32F373VBT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F3 series.

STM32F373VBT6 Specifications

Parameter Value
DigiKey Programmable Not Verified
Core Processor ARM® Cortex®-M4
Core Size 32-Bit
Speed 72MHz
Connectivity CANbus, I2C, IrDA, LINbus, SPI, UART/USART, USB
Peripherals DMA, I2S, POR, PWM, WDT
Number of I/O 84
Program Memory Size 128KB (128K x 8)
Program Memory Type FLASH
RAM Size 24K x 8
Voltage – Supply (Vcc/Vdd) 2V ~ 3.6V
Data Converters A/D 1x12b, 3x16b; D/A 3x12b
Oscillator Type Internal
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Supplier Device Package 100-LQFP (14×14)
Package / Case 100-LQFP

Availability & Supply Status

  • Status: Long Lead (30wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 626 units
  • Standard Lead Time: 30 weeks

Datasheet

Download the official STM32F373VBT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source STM32F373VBT6 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the STM32F373VBT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


IR2104PBF – Infineon Technologies

Looking for the IR2104PBF by Infineon Technologies? This half-bridge gate driver ic non-inverting 8-pdip is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The IR2104PBF is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.

IR2104PBF Specifications

Parameter Value
DigiKey Programmable Not Verified
Driven Configuration Half-Bridge
Channel Type Synchronous
Number of Drivers 2
Gate Type IGBT, MOSFET (N-Channel)
Voltage – Supply 10V ~ 20V
Logic Voltage – VIL, VIH 0.8V, 3V
Current – Peak Output (Source, Sink) 210mA, 360mA
Input Type Non-Inverting
High Side Voltage – Max (Bootstrap) 600 V
Rise / Fall Time (Typ) 100ns, 50ns
Operating Temperature -40°C ~ 150°C (TJ)
Mounting Type Through Hole
Package / Case 8-DIP (0.300", 7.62mm)
Supplier Device Package 8-PDIP

Availability & Supply Status

  • Status: End of Life – Stock Available
  • Lifecycle: End of Life
  • Distribution Stock: 3,353 units
  • Standard Lead Time: 29 weeks

Datasheet

Download the official IR2104PBF datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source IR2104PBF from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the IR2104PBF? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


PIC32MZ1024EFF064-I/PT – Microchip Technology

Looking for the PIC32MZ1024EFF064-I/PT by Microchip Technology? This mips32® m-class pic® 32mz microcontroller ic 32-bit 200mhz 1mb (1m x 8) flash 64-tqfp (10×10) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The PIC32MZ1024EFF064-I/PT is classified under Embedded in the Integrated Circuits (ICs) category, part of the PIC® 32MZ series.

PIC32MZ1024EFF064-I/PT Specifications

Parameter Value
DigiKey Programmable Not Verified
Core Processor MIPS32® M-Class
Core Size 32-Bit
Speed 200MHz
Connectivity CANbus, Ethernet, I2C, PMP, SPI, SQI, UART/USART, USB OTG
Peripherals Brown-out Detect/Reset, DMA, I2S, POR, PWM, WDT
Number of I/O 46
Program Memory Size 1MB (1M x 8)
Program Memory Type FLASH
RAM Size 256K x 8
Voltage – Supply (Vcc/Vdd) 2.1V ~ 3.6V
Data Converters A/D 24x12b
Oscillator Type Internal
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Supplier Device Package 64-TQFP (10×10)
Package / Case 64-TQFP

Availability & Supply Status

  • Status: Long Lead (24wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 152 units
  • Standard Lead Time: 24 weeks

Datasheet

Download the official PIC32MZ1024EFF064-I/PT datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source PIC32MZ1024EFF064-I/PT from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the PIC32MZ1024EFF064-I/PT? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


IRF9540NPBF – Infineon Technologies

Looking for the IRF9540NPBF by Infineon Technologies? This p-channel 100 v 23a (tc) 140w (tc) through hole to-220ab is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The IRF9540NPBF is classified under Transistors in the Discrete Semiconductor Products category, part of the HEXFET® series.

IRF9540NPBF Specifications

Parameter Value
FET Type P-Channel
Technology MOSFET (Metal Oxide)
Drain to Source Voltage (Vdss) 100 V
Current – Continuous Drain (Id) @ 25°C 23A (Tc)
Drive Voltage (Max Rds On, Min Rds On) 10V
Rds On (Max) @ Id, Vgs 117mOhm @ 11A, 10V
Vgs(th) (Max) @ Id 4V @ 250µA
Gate Charge (Qg) (Max) @ Vgs 97 nC @ 10 V
Vgs (Max) ±20V
Input Capacitance (Ciss) (Max) @ Vds 1300 pF @ 25 V
Power Dissipation (Max) 140W (Tc)
Operating Temperature -55°C ~ 150°C (TJ)
Mounting Type Through Hole
Supplier Device Package TO-220AB
Package / Case TO-220-3

Availability & Supply Status

  • Status: Long Lead (24wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 11,019 units
  • Standard Lead Time: 24 weeks

Datasheet

Download the official IRF9540NPBF datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source IRF9540NPBF from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the IRF9540NPBF? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


STM32WB15CCU7 – STMicroelectronics

Looking for the STM32WB15CCU7 by STMicroelectronics? This ic rf txrx + mcu bluetooth bluetooth v5.3 2.4ghz ~ 2.48ghz 48-ufqfn exposed pad is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The STM32WB15CCU7 is classified under RF Transceiver ICs in the RF and Wireless category.

STM32WB15CCU7 Specifications

Parameter Value
Type TxRx + MCU
RF Family/Standard Bluetooth
Protocol Bluetooth v5.3
Modulation GFSK
Frequency 2.4GHz ~ 2.48GHz
Data Rate (Max) 2Mbps
Power – Output 5.5dBm
Sensitivity -95.5dBm
Memory Size 320kB Flash, 48kB SRAM
Serial Interfaces ADC, I2C, SPI, UART, USART
GPIO 30
Voltage – Supply 1.71V ~ 3.6V
Current – Receiving 4.5mA ~ 7.7mA
Current – Transmitting 5.2mA ~ 12.3mA
Operating Temperature -40°C ~ 85°C (TA)
Grade Automotive
Qualification AEC-Q100
Mounting Type Surface Mount
Package / Case 48-UFQFN Exposed Pad
Supplier Device Package 48-UFQFPN (7×7)

Availability & Supply Status

  • Status: Long Lead (30wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 1,510 units
  • Standard Lead Time: 30 weeks

Datasheet

Download the official STM32WB15CCU7 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source STM32WB15CCU7 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the STM32WB15CCU7? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


STM32F401RET6 – STMicroelectronics

Looking for the STM32F401RET6 by STMicroelectronics? This arm® cortex®-m4 stm32f4 microcontroller ic 32-bit 84mhz 512kb (512k x 8) flash 64-lqfp (10×10) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The STM32F401RET6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F4 series.

STM32F401RET6 Specifications

Parameter Value
DigiKey Programmable Not Verified
Core Processor ARM® Cortex®-M4
Core Size 32-Bit
Speed 84MHz
Connectivity I2C, IrDA, LINbus, SDIO, SPI, UART/USART, USB OTG
Peripherals Brown-out Detect/Reset, DMA, I2S, POR, PWM, WDT
Number of I/O 50
Program Memory Size 512KB (512K x 8)
Program Memory Type FLASH
RAM Size 96K x 8
Voltage – Supply (Vcc/Vdd) 1.7V ~ 3.6V
Data Converters A/D 16x12b
Oscillator Type Internal
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Supplier Device Package 64-LQFP (10×10)
Package / Case 64-LQFP

Availability & Supply Status

  • Status: Long Lead (30wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 2,176 units
  • Standard Lead Time: 30 weeks

Datasheet

Download the official STM32F401RET6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source STM32F401RET6 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the STM32F401RET6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


STM32F303ZET6 – STMicroelectronics

Looking for the STM32F303ZET6 by STMicroelectronics? This arm® cortex®-m4 stm32f3 microcontroller ic 32-bit 72mhz 512kb (512k x 8) flash 144-lqfp (20×20) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The STM32F303ZET6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F3 series.

STM32F303ZET6 Specifications

Parameter Value
DigiKey Programmable Not Verified
Core Processor ARM® Cortex®-M4
Core Size 32-Bit
Speed 72MHz
Connectivity CANbus, I2C, IrDA, LINbus, SPI, UART/USART, USB
Peripherals DMA, I2S, POR, PWM, WDT
Number of I/O 115
Program Memory Size 512KB (512K x 8)
Program Memory Type FLASH
RAM Size 80K x 8
Voltage – Supply (Vcc/Vdd) 2V ~ 3.6V
Data Converters A/D 40x12b; D/A 2x12b
Oscillator Type Internal
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Supplier Device Package 144-LQFP (20×20)
Package / Case 144-LQFP

Availability & Supply Status

  • Status: Long Lead (30wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 519 units
  • Standard Lead Time: 30 weeks

Datasheet

Download the official STM32F303ZET6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source STM32F303ZET6 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the STM32F303ZET6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


S25FL512SAGMFI010 – Infineon Technologies

Looking for the S25FL512SAGMFI010 by Infineon Technologies? This flash – nor memory ic 512mbit spi – quad i/o 133 mhz 16-soic is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The S25FL512SAGMFI010 is classified under Memory in the Integrated Circuits (ICs) category, part of the FL-S series.

S25FL512SAGMFI010 Specifications

Parameter Value
DigiKey Programmable Not Verified
Memory Type Non-Volatile
Memory Format FLASH
Technology FLASH – NOR
Memory Size 512Mbit
Memory Organization 64M x 8
Memory Interface SPI – Quad I/O
Clock Frequency 133 MHz
Voltage – Supply 2.7V ~ 3.6V
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Package / Case 16-SOIC (0.295", 7.50mm Width)
Supplier Device Package 16-SOIC

Availability & Supply Status

  • Status: Long Lead (25wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 1,978 units
  • Standard Lead Time: 25 weeks

Datasheet

Download the official S25FL512SAGMFI010 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source S25FL512SAGMFI010 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the S25FL512SAGMFI010? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.