AT42QT1070-MMHR – Microchip Technology
September 9, 2026
Looking for the AT42QT1070-MMHR by Microchip Technology? This capacitive touch buttons 20-vqfn (3×3) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The AT42QT1070-MMHR is classified under Interface in the Integrated Circuits (ICs) category, part of the QTouch™ series.
AT42QT1070-MMHR Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Type |
Buttons |
| Proximity Detection |
No |
| Number of Inputs |
Up to 7 |
| LED Driver Channels |
Up to 5 |
| Interface |
I2C |
| Voltage – Supply |
1.8V ~ 5.5V |
| Operating Temperature |
-40°C ~ 85°C |
| Mounting Type |
Surface Mount |
| Package / Case |
20-VFQFN Exposed Pad |
| Supplier Device Package |
20-VQFN (3×3) |
Availability & Supply Status
- Status: Long Lead (24wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 8,088 units
- Standard Lead Time: 24 weeks
Datasheet
Download the official AT42QT1070-MMHR datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source AT42QT1070-MMHR from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the AT42QT1070-MMHR? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
TPS7A0233PDBVR – Texas Instruments
September 9, 2026
Looking for the TPS7A0233PDBVR by Texas Instruments? This linear voltage regulator ic positive fixed 1 output 200ma sot-23-5 is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The TPS7A0233PDBVR is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.
TPS7A0233PDBVR Specifications
| Parameter |
Value |
| Output Configuration |
Positive |
| Output Type |
Fixed |
| Number of Regulators |
1 |
| Voltage – Input (Max) |
6V |
| Voltage – Output (Min/Fixed) |
3.3V |
| Voltage Dropout (Max) |
0.31V @ 200mA |
| Current – Output |
200mA |
| Current – Quiescent (Iq) |
60 nA |
| PSRR |
55dB (1kHz) |
| Control Features |
Enable |
| Protection Features |
Over Current, Over Temperature, Under Voltage Lockout (UVLO) |
| Operating Temperature |
-40°C ~ 125°C (TJ) |
| Mounting Type |
Surface Mount |
| Package / Case |
SC-74A, SOT-753 |
| Supplier Device Package |
SOT-23-5 |
Availability & Supply Status
- Status: Long Lead (26wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 7,978 units
- Standard Lead Time: 26 weeks
Datasheet
Download the official TPS7A0233PDBVR datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source TPS7A0233PDBVR from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the TPS7A0233PDBVR? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F072CBT6 – STMicroelectronics
September 9, 2026
Looking for the STM32F072CBT6 by STMicroelectronics? This arm® cortex®-m0 stm32f0 microcontroller ic 32-bit 48mhz 128kb (128k x 8) flash 48-lqfp (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F072CBT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F0 series.
STM32F072CBT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M0 |
| Core Size |
32-Bit |
| Speed |
48MHz |
| Connectivity |
CANbus, HDMI-CEC, I2C, IrDA, LINbus, SPI, UART/USART, USB |
| Peripherals |
DMA, I2S, POR, PWM, WDT |
| Number of I/O |
37 |
| Program Memory Size |
128KB (128K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
16K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.65V ~ 3.6V |
| Data Converters |
A/D 10x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
48-LQFP (7×7) |
| Package / Case |
48-LQFP |
Availability & Supply Status
- Status: Long Lead (40wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 18,028 units
- Standard Lead Time: 40 weeks
Datasheet
Download the official STM32F072CBT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F072CBT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F072CBT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
MIMX8MM6DVTLZAA – NXP USA Inc.
September 9, 2026
Looking for the MIMX8MM6DVTLZAA by NXP USA Inc.? This arm® cortex®-a53 microprocessor ic i.mx8mm 4 core, 64-bit 1.8ghz 486-lfbga (14×14) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The MIMX8MM6DVTLZAA is classified under Embedded in the Integrated Circuits (ICs) category, part of the i.MX8MM series.
MIMX8MM6DVTLZAA Specifications
| Parameter |
Value |
| Core Processor |
ARM® Cortex®-A53 |
| Number of Cores/Bus Width |
4 Core, 64-Bit |
| Speed |
1.8GHz |
| Co-Processors/DSP |
ARM® Cortex®-M4 |
| RAM Controllers |
DDR3L, DDR4, LPDDR4 |
| Graphics Acceleration |
Yes |
| Display & Interface Controllers |
MIPI-DSI |
| Ethernet |
GbE |
| USB |
USB 2.0 + PHY (2) |
| Operating Temperature |
0°C ~ 95°C (TJ) |
| Security Features |
ARM TZ, CAAM, HAB, OCRAM, RDC, SJC, SNVS |
| Mounting Type |
Surface Mount |
| Package / Case |
486-LFBGA, FCBGA |
| Supplier Device Package |
486-LFBGA (14×14) |
| Additional Interfaces |
I2C, PCIe, SDHC, SPI, UART |
Availability & Supply Status
- Status: Long Lead (52wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 598 units
- Standard Lead Time: 52 weeks
Datasheet
Download the official MIMX8MM6DVTLZAA datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source MIMX8MM6DVTLZAA from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the MIMX8MM6DVTLZAA? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32G071KBT6 – STMicroelectronics
September 9, 2026
Looking for the STM32G071KBT6 by STMicroelectronics? This arm® cortex®-m0+ stm32g0 microcontroller ic 32-bit 64mhz 128kb (128k x 8) flash 32-lqfp (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32G071KBT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32G0 series.
STM32G071KBT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M0+ |
| Core Size |
32-Bit |
| Speed |
64MHz |
| Connectivity |
HDMI-CEC, I2C, IrDA, LINbus, SPI, UART/USART, USB Type-C™ (Power Delivery) |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, POR, PWM, Temp Sensor, WDT |
| Number of I/O |
30 |
| Program Memory Size |
128KB (128K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
36K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.71V ~ 3.6V |
| Data Converters |
A/D 13x12b; D/A 2x12b |
| Oscillator Type |
External, Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
32-LQFP (7×7) |
| Package / Case |
32-LQFP |
Availability & Supply Status
- Status: Long Lead (52wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 1,589 units
- Standard Lead Time: 52 weeks
Datasheet
Download the official STM32G071KBT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32G071KBT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32G071KBT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STUSB4500QTR – STMicroelectronics
September 9, 2026
Looking for the STUSB4500QTR by STMicroelectronics? This usb controller usb 2.0 i2c interface 24-qfn (4×4) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STUSB4500QTR is classified under Interface in the Integrated Circuits (ICs) category.
STUSB4500QTR Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Protocol |
USB |
| Function |
Controller |
| Interface |
I2C |
| Standards |
USB 2.0 |
| Voltage – Supply |
4.1V ~ 22V |
| Operating Temperature |
-40°C ~ 105°C |
| Package / Case |
24-VFQFN Exposed Pad |
| Supplier Device Package |
24-QFN (4×4) |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 31,515 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STUSB4500QTR datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STUSB4500QTR from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STUSB4500QTR? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
PAM8302AASCR – Diodes Incorporated
September 9, 2026
Looking for the PAM8302AASCR by Diodes Incorporated? This amplifier ic 1-channel (mono) class d 8-msop is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The PAM8302AASCR is classified under Linear in the Integrated Circuits (ICs) category.
PAM8302AASCR Specifications
| Parameter |
Value |
| Type |
Class D |
| Output Type |
1-Channel (Mono) |
| Max Output Power x Channels @ Load |
2.5W x 1 @ 4Ohm |
| Voltage – Supply |
2V ~ 5.5V |
| Features |
Depop, Short-Circuit and Thermal Protection |
| Mounting Type |
Surface Mount |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Supplier Device Package |
8-MSOP |
| Package / Case |
8-TSSOP, 8-MSOP (0.118", 3.00mm Width) |
Availability & Supply Status
- Status: Long Lead (28wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 77,369 units
- Standard Lead Time: 28 weeks
Datasheet
Download the official PAM8302AASCR datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source PAM8302AASCR from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the PAM8302AASCR? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32L476RGT6 – STMicroelectronics
September 9, 2026
Looking for the STM32L476RGT6 by STMicroelectronics? This arm® cortex®-m4 stm32l4 microcontroller ic 32-bit 80mhz 1mb (1m x 8) flash 64-lqfp (10×10) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32L476RGT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32L4 series.
STM32L476RGT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
80MHz |
| Connectivity |
CANbus, I2C, IrDA, LINbus, MMC/SD, QSPI, SAI, SPI, SWPMI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, LCD, PWM, WDT |
| Number of I/O |
51 |
| Program Memory Size |
1MB (1M x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
128K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.71V ~ 3.6V |
| Data Converters |
A/D 16x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
64-LQFP (10×10) |
| Package / Case |
64-LQFP |
Availability & Supply Status
- Status: Long Lead (52wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 2,666 units
- Standard Lead Time: 52 weeks
Datasheet
Download the official STM32L476RGT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32L476RGT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32L476RGT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
A3941KLPTR-T – Allegro MicroSystems
May 24, 2026
Looking for the A3941KLPTR-T by Allegro MicroSystems? This motor driver power mosfet pwm 28-tssop-ep is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The A3941KLPTR-T is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.
A3941KLPTR-T Specifications
| Parameter |
Value |
| Motor Type – AC, DC |
Brushed DC |
| Function |
Controller – Commutation, Direction Management |
| Output Configuration |
Pre-Driver – Half Bridge (2) |
| Interface |
PWM |
| Technology |
Power MOSFET |
| Voltage – Supply |
5.5V ~ 50V |
| Operating Temperature |
-40°C ~ 150°C (TA) |
| Grade |
Automotive |
| Mounting Type |
Surface Mount |
| Package / Case |
28-TSSOP (0.173", 4.40mm Width) Exposed Pad |
| Supplier Device Package |
28-TSSOP-EP |
Availability & Supply Status
- Status: Long Lead (24wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 24,345 units
- Standard Lead Time: 24 weeks
Datasheet
Download the official A3941KLPTR-T datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source A3941KLPTR-T from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the A3941KLPTR-T? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F429IGT6 – STMicroelectronics
May 24, 2026
Looking for the STM32F429IGT6 by STMicroelectronics? This arm® cortex®-m4 stm32f4 microcontroller ic 32-bit 180mhz 1mb (1m x 8) flash 176-lqfp (24×24) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F429IGT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F4 series.
STM32F429IGT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
180MHz |
| Connectivity |
CANbus, EBI/EMI, Ethernet, I2C, IrDA, LINbus, SPI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT |
| Number of I/O |
140 |
| Program Memory Size |
1MB (1M x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
256K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.8V ~ 3.6V |
| Data Converters |
A/D 24x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
176-LQFP (24×24) |
| Package / Case |
176-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 501 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F429IGT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F429IGT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F429IGT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.