SCT3120ALGC11 – Rohm Semiconductor
May 24, 2026
Looking for the SCT3120ALGC11 by Rohm Semiconductor? This n-channel 650 v 21a (tc) 103w (tc) through hole to-247n is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The SCT3120ALGC11 is classified under Transistors in the Discrete Semiconductor Products category.
SCT3120ALGC11 Specifications
| Parameter |
Value |
| FET Type |
N-Channel |
| Technology |
SiCFET (Silicon Carbide) |
| Drain to Source Voltage (Vdss) |
650 V |
| Current – Continuous Drain (Id) @ 25°C |
21A (Tc) |
| Drive Voltage (Max Rds On, Min Rds On) |
18V |
| Rds On (Max) @ Id, Vgs |
156mOhm @ 6.7A, 18V |
| Vgs(th) (Max) @ Id |
5.6V @ 3.33mA |
| Gate Charge (Qg) (Max) @ Vgs |
38 nC @ 18 V |
| Vgs (Max) |
+22V, -4V |
| Input Capacitance (Ciss) (Max) @ Vds |
460 pF @ 500 V |
| Power Dissipation (Max) |
103W (Tc) |
| Operating Temperature |
175°C (TJ) |
| Mounting Type |
Through Hole |
| Supplier Device Package |
TO-247N |
| Package / Case |
TO-247-3 |
Availability & Supply Status
- Status: Long Lead (27wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 282 units
- Standard Lead Time: 27 weeks
Datasheet
Download the official SCT3120ALGC11 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source SCT3120ALGC11 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the SCT3120ALGC11? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F101VGT6 – STMicroelectronics
May 24, 2026
Looking for the STM32F101VGT6 by STMicroelectronics? This arm® cortex®-m3 stm32f1 microcontroller ic 32-bit 36mhz 1mb (1m x 8) flash 100-lqfp (14×14) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F101VGT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F1 series.
STM32F101VGT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M3 |
| Core Size |
32-Bit |
| Speed |
36MHz |
| Connectivity |
I2C, IrDA, LINbus, SPI, UART/USART |
| Peripherals |
DMA, PDR, POR, PVD, PWM, Temp Sensor, WDT |
| Number of I/O |
80 |
| Program Memory Size |
1MB (1M x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
80K x 8 |
| Voltage – Supply (Vcc/Vdd) |
2V ~ 3.6V |
| Data Converters |
A/D 16x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
100-LQFP (14×14) |
| Package / Case |
100-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 977 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F101VGT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F101VGT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F101VGT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F302VCT6 – STMicroelectronics
May 24, 2026
Looking for the STM32F302VCT6 by STMicroelectronics? This arm® cortex®-m4 stm32f3 microcontroller ic 32-bit 72mhz 256kb (256k x 8) flash 100-lqfp (14×14) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F302VCT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F3 series.
STM32F302VCT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
72MHz |
| Connectivity |
CANbus, I2C, IrDA, LINbus, SPI, UART/USART, USB |
| Peripherals |
DMA, I2S, POR, PWM, WDT |
| Number of I/O |
87 |
| Program Memory Size |
256KB (256K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
40K x 8 |
| Voltage – Supply (Vcc/Vdd) |
2V ~ 3.6V |
| Data Converters |
A/D 17x12b; D/A 1x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
100-LQFP (14×14) |
| Package / Case |
100-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 2,845 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F302VCT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F302VCT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F302VCT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32WB35CCU6A – STMicroelectronics
May 24, 2026
Looking for the STM32WB35CCU6A by STMicroelectronics? This ic rf txrx + mcu 802.15.4, bluetooth bluetooth v5.3, thread, zigbee® 2.405ghz ~ 2.48ghz 48-ufqfn exposed pad is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32WB35CCU6A is classified under RF Transceiver ICs in the RF and Wireless category, part of the STM32WB35xx series.
STM32WB35CCU6A Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Type |
TxRx + MCU |
| RF Family/Standard |
802.15.4, Bluetooth |
| Protocol |
Bluetooth v5.3, Thread, Zigbee® |
| Modulation |
GFSK |
| Frequency |
2.405GHz ~ 2.48GHz |
| Data Rate (Max) |
2Mbps |
| Power – Output |
6dBm |
| Sensitivity |
-100dBm |
| Memory Size |
256kB Flash, 96kB SRAM |
| Serial Interfaces |
ADC, I2C, SPI, UART, USART, USB |
| GPIO |
30 |
| Voltage – Supply |
1.71V ~ 3.6V |
| Current – Receiving |
4.5mA ~ 7.9mA |
| Current – Transmitting |
5.2mA ~ 12.7mA |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Package / Case |
48-UFQFN Exposed Pad |
| Supplier Device Package |
48-UFQFPN (7×7) |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 588 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32WB35CCU6A datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32WB35CCU6A from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32WB35CCU6A? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
BSC028N06NSATMA1 – Infineon Technologies
May 23, 2026
Looking for the BSC028N06NSATMA1 by Infineon Technologies? This n-channel 60 v 23a (ta), 100a (tc) 2.5w (ta), 83w (tc) surface mount pg-tdson-8-7 is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The BSC028N06NSATMA1 is classified under Transistors in the Discrete Semiconductor Products category, part of the OptiMOS™ series.
BSC028N06NSATMA1 Specifications
| Parameter |
Value |
| FET Type |
N-Channel |
| Technology |
MOSFET (Metal Oxide) |
| Drain to Source Voltage (Vdss) |
60 V |
| Current – Continuous Drain (Id) @ 25°C |
23A (Ta), 100A (Tc) |
| Drive Voltage (Max Rds On, Min Rds On) |
6V, 10V |
| Rds On (Max) @ Id, Vgs |
2.8mOhm @ 50A, 10V |
| Vgs(th) (Max) @ Id |
2.8V @ 50µA |
| Gate Charge (Qg) (Max) @ Vgs |
37 nC @ 10 V |
| Vgs (Max) |
±20V |
| Input Capacitance (Ciss) (Max) @ Vds |
2700 pF @ 30 V |
| Power Dissipation (Max) |
2.5W (Ta), 83W (Tc) |
| Operating Temperature |
-55°C ~ 175°C (TJ) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
PG-TDSON-8-7 |
| Package / Case |
8-PowerTDFN |
Availability & Supply Status
- Status: Long Lead (61wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 33,052 units
- Standard Lead Time: 61 weeks
Datasheet
Download the official BSC028N06NSATMA1 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source BSC028N06NSATMA1 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the BSC028N06NSATMA1? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F302RET6 – STMicroelectronics
May 23, 2026
Looking for the STM32F302RET6 by STMicroelectronics? This arm® cortex®-m4 stm32f3 microcontroller ic 32-bit 72mhz 512kb (512k x 8) flash 64-lqfp (10×10) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F302RET6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F3 series.
STM32F302RET6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
72MHz |
| Connectivity |
CANbus, I2C, IrDA, LINbus, SPI, UART/USART, USB |
| Peripherals |
DMA, I2S, POR, PWM, WDT |
| Number of I/O |
51 |
| Program Memory Size |
512KB (512K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
64K x 8 |
| Voltage – Supply (Vcc/Vdd) |
2V ~ 3.6V |
| Data Converters |
A/D 16x12b; D/A 1x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
64-LQFP (10×10) |
| Package / Case |
64-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 955 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F302RET6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F302RET6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F302RET6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32L476QGI6 – STMicroelectronics
May 23, 2026
Looking for the STM32L476QGI6 by STMicroelectronics? This arm® cortex®-m4 stm32l4 microcontroller ic 32-bit 80mhz 1mb (1m x 8) flash 132-ufbga (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32L476QGI6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32L4 series.
STM32L476QGI6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
80MHz |
| Connectivity |
CANbus, EBI/EMI, I2C, IrDA, LINbus, MMC/SD, QSPI, SAI, SPI, SWPMI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, LCD, PWM, WDT |
| Number of I/O |
109 |
| Program Memory Size |
1MB (1M x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
128K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.71V ~ 3.6V |
| Data Converters |
A/D 19x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
132-UFBGA (7×7) |
| Package / Case |
132-UFBGA |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 885 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32L476QGI6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32L476QGI6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32L476QGI6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
AD7176-2BRUZ – Analog Devices Inc.
May 23, 2026
Looking for the AD7176-2BRUZ by Analog Devices Inc.? This 24 bit analog to digital converter 2, 4 input 1 sigma-delta 24-tssop is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The AD7176-2BRUZ is classified under Data Acquisition in the Integrated Circuits (ICs) category.
AD7176-2BRUZ Specifications
| Parameter |
Value |
| Number of Bits |
24 |
| Sampling Rate (Per Second) |
250k |
| Number of Inputs |
2, 4 |
| Input Type |
Differential, Pseudo-Differential |
| Data Interface |
SPI, DSP |
| Configuration |
MUX-ADC |
| Number of A/D Converters |
1 |
| Architecture |
Sigma-Delta |
| Reference Type |
External, Internal |
| Voltage – Supply, Analog |
2V ~ 5.5V |
| Voltage – Supply, Digital |
2V ~ 5.5V |
| Operating Temperature |
-40°C ~ 105°C |
| Package / Case |
24-TSSOP (0.173", 4.40mm Width) |
| Supplier Device Package |
24-TSSOP |
| Mounting Type |
Surface Mount |
Availability & Supply Status
- Status: Long Lead (27wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 327 units
- Standard Lead Time: 27 weeks
Datasheet
Download the official AD7176-2BRUZ datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source AD7176-2BRUZ from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the AD7176-2BRUZ? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
DS3231MZ+TRL – Analog Devices Inc./Maxim Integrated
May 23, 2026
Looking for the DS3231MZ+TRL by Analog Devices Inc./Maxim Integrated? This real time clock (rtc) ic clock/calendar i2c, 2-wire serial 8-soic (0.154", 3.90mm width) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The DS3231MZ+TRL is classified under Clock/Timing in the Integrated Circuits (ICs) category.
DS3231MZ+TRL Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Type |
Clock/Calendar |
| Features |
Alarm, Leap Year, Square Wave Output |
| Time Format |
HH:MM:SS (12/24 hr) |
| Date Format |
YY-MM-DD-dd |
| Interface |
I2C, 2-Wire Serial |
| Voltage – Supply |
2.3V ~ 5.5V |
| Voltage – Supply, Battery |
2.3V ~ 5.5V |
| Current – Timekeeping (Max) |
130µA ~ 200µA @ 3.63V ~ 5.5V |
| Operating Temperature |
-40°C ~ 85°C |
| Mounting Type |
Surface Mount |
| Package / Case |
8-SOIC (0.154", 3.90mm Width) |
| Supplier Device Package |
8-SOIC |
Availability & Supply Status
- Status: Long Lead (28wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 7,476 units
- Standard Lead Time: 28 weeks
Datasheet
Download the official DS3231MZ+TRL datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source DS3231MZ+TRL from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the DS3231MZ+TRL? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32L431KBU6 – STMicroelectronics
May 23, 2026
Looking for the STM32L431KBU6 by STMicroelectronics? This arm® cortex®-m4 stm32l4 microcontroller ic 32-bit 80mhz 128kb (128k x 8) flash 32-ufqfpn (5×5) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32L431KBU6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32L4 series.
STM32L431KBU6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
80MHz |
| Connectivity |
CANbus, I2C, IrDA, LINbus, QSPI, SAI, SPI, SWPMI, UART/USART |
| Peripherals |
Brown-out Detect/Reset, DMA, PWM, WDT |
| Number of I/O |
26 |
| Program Memory Size |
128KB (128K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
64K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.71V ~ 3.6V |
| Data Converters |
A/D 10x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
32-UFQFPN (5×5) |
| Package / Case |
32-UFQFN Exposed Pad |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 1,926 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32L431KBU6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32L431KBU6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32L431KBU6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.