STM32WB55VEY6TR – STMicroelectronics
April 29, 2026
Looking for the STM32WB55VEY6TR by STMicroelectronics? This ic rf txrx + mcu 802.15.4, bluetooth bluetooth v5.3, thread, zigbee® 2.405ghz ~ 2.48ghz 100-ufbga, wlcsp is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32WB55VEY6TR is classified under RF Transceiver ICs in the RF and Wireless category, part of the STM32WB55xx series.
STM32WB55VEY6TR Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Type |
TxRx + MCU |
| RF Family/Standard |
802.15.4, Bluetooth |
| Protocol |
Bluetooth v5.3, Thread, Zigbee® |
| Modulation |
GFSK |
| Frequency |
2.405GHz ~ 2.48GHz |
| Data Rate (Max) |
2Mbps |
| Power – Output |
6dBm |
| Sensitivity |
-100dBm |
| Memory Size |
512kB Flash, 256kB SRAM |
| Serial Interfaces |
ADC, I2C, SPI, UART, USART, USB |
| GPIO |
72 |
| Voltage – Supply |
1.71V ~ 3.6V |
| Current – Receiving |
4.5mA ~ 7.9mA |
| Current – Transmitting |
5.2mA ~ 12.7mA |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Package / Case |
100-UFBGA, WLCSP |
| Supplier Device Package |
100-WLCSP (4.4×4.38) |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 14,792 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32WB55VEY6TR datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32WB55VEY6TR from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32WB55VEY6TR? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32L433CCU6 – STMicroelectronics
April 29, 2026
Looking for the STM32L433CCU6 by STMicroelectronics? This arm® cortex®-m4 stm32l4 microcontroller ic 32-bit 80mhz 256kb (256k x 8) flash 48-ufqfpn (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32L433CCU6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32L4 series.
STM32L433CCU6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
80MHz |
| Connectivity |
CANbus, I2C, IrDA, LINbus, MMC/SD, QSPI, SAI, SPI, SWPMI, UART/USART, USB |
| Peripherals |
Brown-out Detect/Reset, DMA, LCD, PWM, WDT |
| Number of I/O |
38 |
| Program Memory Size |
256KB (256K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
64K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.71V ~ 3.6V |
| Data Converters |
A/D 10x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
48-UFQFPN (7×7) |
| Package / Case |
48-UFQFN Exposed Pad |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 1,255 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32L433CCU6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32L433CCU6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32L433CCU6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F412CEU6 – STMicroelectronics
April 29, 2026
Looking for the STM32F412CEU6 by STMicroelectronics? This arm® cortex®-m4 stm32f4 microcontroller ic 32-bit 100mhz 512kb (512k x 8) flash 48-ufqfpn (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F412CEU6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F4 series.
STM32F412CEU6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
100MHz |
| Connectivity |
CANbus, EBI/EMI, I2C, IrDA, LINbus, MMC/SD/SDIO, QSPI, SPI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, POR, PWM, WDT |
| Number of I/O |
36 |
| Program Memory Size |
512KB (512K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
256K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.7V ~ 3.6V |
| Data Converters |
A/D 10x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
48-UFQFPN (7×7) |
| Package / Case |
48-UFQFN Exposed Pad |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 686 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F412CEU6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F412CEU6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F412CEU6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32G071KBU6 – STMicroelectronics
April 29, 2026
Looking for the STM32G071KBU6 by STMicroelectronics? This arm® cortex®-m0+ stm32g0 microcontroller ic 32-bit 64mhz 128kb (128k x 8) flash 32-ufqfpn (5×5) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32G071KBU6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32G0 series.
STM32G071KBU6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M0+ |
| Core Size |
32-Bit |
| Speed |
64MHz |
| Connectivity |
HDMI-CEC, I2C, IrDA, LINbus, SPI, UART/USART, USB Type-C™ (Power Delivery) |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, POR, PWM, Temp Sensor, WDT |
| Number of I/O |
30 |
| Program Memory Size |
128KB (128K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
36K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.71V ~ 3.6V |
| Data Converters |
A/D 13x12b; D/A 2x12b |
| Oscillator Type |
External, Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
32-UFQFPN (5×5) |
| Package / Case |
32-UFQFN Exposed Pad |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 499 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32G071KBU6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32G071KBU6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32G071KBU6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F042C6T6 – STMicroelectronics
April 29, 2026
Looking for the STM32F042C6T6 by STMicroelectronics? This arm® cortex®-m0 stm32f0 microcontroller ic 32-bit 48mhz 32kb (32k x 8) flash 48-lqfp (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F042C6T6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F0 series.
STM32F042C6T6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M0 |
| Core Size |
32-Bit |
| Speed |
48MHz |
| Connectivity |
CANbus, HDMI-CEC, I2C, IrDA, LINbus, SPI, UART/USART, USB |
| Peripherals |
DMA, I2S, POR, PWM, WDT |
| Number of I/O |
38 |
| Program Memory Size |
32KB (32K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
6K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.65V ~ 3.6V |
| Data Converters |
A/D 13x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
48-LQFP (7×7) |
| Package / Case |
48-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 1,284 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F042C6T6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F042C6T6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F042C6T6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32G031J6M6 – STMicroelectronics
April 29, 2026
Looking for the STM32G031J6M6 by STMicroelectronics? This arm® cortex®-m0+ stm32g0 microcontroller ic 32-bit 64mhz 32kb (32k x 8) flash 8-soic is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32G031J6M6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32G0 series.
STM32G031J6M6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M0+ |
| Core Size |
32-Bit |
| Speed |
64MHz |
| Connectivity |
I2C, IrDA, LINbus, SPI, SmartCard, UART/USART |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, POR, PWM, WDT |
| Number of I/O |
6 |
| Program Memory Size |
32KB (32K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
8K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.7V ~ 3.6V |
| Data Converters |
A/D 8x12b SAR |
| Oscillator Type |
External, Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
8-SOIC |
| Package / Case |
8-SOIC (0.154", 3.90mm Width) |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 1,437 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32G031J6M6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32G031J6M6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32G031J6M6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F100VCT6B – STMicroelectronics
April 29, 2026
Looking for the STM32F100VCT6B by STMicroelectronics? This arm® cortex®-m3 stm32f1 microcontroller ic 32-bit 24mhz 256kb (256k x 8) flash 100-lqfp (14×14) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F100VCT6B is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F1 series.
STM32F100VCT6B Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M3 |
| Core Size |
32-Bit |
| Speed |
24MHz |
| Connectivity |
I2C, IrDA, LINbus, SPI, UART/USART |
| Peripherals |
DMA, PDR, POR, PVD, PWM, Temp Sensor, WDT |
| Number of I/O |
80 |
| Program Memory Size |
256KB (256K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
24K x 8 |
| Voltage – Supply (Vcc/Vdd) |
2V ~ 3.6V |
| Data Converters |
A/D 16x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
100-LQFP (14×14) |
| Package / Case |
100-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 538 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F100VCT6B datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F100VCT6B from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F100VCT6B? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F302R8T6 – STMicroelectronics
April 29, 2026
Looking for the STM32F302R8T6 by STMicroelectronics? This arm® cortex®-m4 stm32f3 microcontroller ic 32-bit 72mhz 64kb (64k x 8) flash 64-lqfp (10×10) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F302R8T6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F3 series.
STM32F302R8T6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
72MHz |
| Connectivity |
CANbus, I2C, IrDA, LINbus, SPI, UART/USART, USB |
| Peripherals |
DMA, I2S, POR, PWM, WDT |
| Number of I/O |
51 |
| Program Memory Size |
64KB (64K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
16K x 8 |
| Voltage – Supply (Vcc/Vdd) |
2V ~ 3.6V |
| Data Converters |
A/D 15x12b; D/A 1x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
64-LQFP (10×10) |
| Package / Case |
64-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 267 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F302R8T6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F302R8T6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F302R8T6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F042F6P6 – STMicroelectronics
April 29, 2026
Looking for the STM32F042F6P6 by STMicroelectronics? This arm® cortex®-m0 stm32f0 microcontroller ic 32-bit 48mhz 32kb (32k x 8) flash 20-tssop is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F042F6P6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F0 series.
STM32F042F6P6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M0 |
| Core Size |
32-Bit |
| Speed |
48MHz |
| Connectivity |
CANbus, HDMI-CEC, I2C, IrDA, LINbus, SPI, UART/USART, USB |
| Peripherals |
DMA, I2S, POR, PWM, WDT |
| Number of I/O |
16 |
| Program Memory Size |
32KB (32K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
6K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.65V ~ 3.6V |
| Data Converters |
A/D 12x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
20-TSSOP |
| Package / Case |
20-TSSOP (0.173", 4.40mm Width) |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 385 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F042F6P6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F042F6P6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F042F6P6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
S25FL128LAGMFI010 – Infineon Technologies
April 29, 2026
Looking for the S25FL128LAGMFI010 by Infineon Technologies? This flash – nor memory ic 128mbit spi – quad i/o, qpi 133 mhz 8-soic is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The S25FL128LAGMFI010 is classified under Memory in the Integrated Circuits (ICs) category, part of the FL-L series.
S25FL128LAGMFI010 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Memory Type |
Non-Volatile |
| Memory Format |
FLASH |
| Technology |
FLASH – NOR |
| Memory Size |
128Mbit |
| Memory Organization |
16M x 8 |
| Memory Interface |
SPI – Quad I/O, QPI |
| Clock Frequency |
133 MHz |
| Voltage – Supply |
2.7V ~ 3.6V |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Package / Case |
8-SOIC (0.209", 5.30mm Width) |
| Supplier Device Package |
8-SOIC |
Availability & Supply Status
- Status: Long Lead (25wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 8,398 units
- Standard Lead Time: 25 weeks
Datasheet
Download the official S25FL128LAGMFI010 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source S25FL128LAGMFI010 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the S25FL128LAGMFI010? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.