IC ORDERS.com

M24C02-WMN6P – STMicroelectronics

Looking for the M24C02-WMN6P by STMicroelectronics? This eeprom memory ic 2kbit i2c 400 khz 900 ns 8-soic is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The M24C02-WMN6P is classified under Memory in the Integrated Circuits (ICs) category.

M24C02-WMN6P Specifications

Parameter Value
DigiKey Programmable Verified
Memory Type Non-Volatile
Memory Format EEPROM
Technology EEPROM
Memory Size 2Kbit
Memory Organization 256 x 8
Memory Interface I2C
Clock Frequency 400 kHz
Write Cycle Time – Word, Page 5ms
Access Time 900 ns
Voltage – Supply 2.5V ~ 5.5V
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Package / Case 8-SOIC (0.154", 3.90mm Width)
Supplier Device Package 8-SOIC

Availability & Supply Status

  • Status: End of Life – Stock Available
  • Lifecycle: End of Life
  • Distribution Stock: 13,354 units
  • Standard Lead Time: 16 weeks

Datasheet

Download the official M24C02-WMN6P datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source M24C02-WMN6P from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the M24C02-WMN6P? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


STM32L433CBU6 – STMicroelectronics

Looking for the STM32L433CBU6 by STMicroelectronics? This arm® cortex®-m4 stm32l4 microcontroller ic 32-bit 80mhz 128kb (128k x 8) flash 48-ufqfpn (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The STM32L433CBU6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32L4 series.

STM32L433CBU6 Specifications

Parameter Value
DigiKey Programmable Not Verified
Core Processor ARM® Cortex®-M4
Core Size 32-Bit
Speed 80MHz
Connectivity CANbus, I2C, IrDA, LINbus, MMC/SD, QSPI, SAI, SPI, SWPMI, UART/USART, USB
Peripherals Brown-out Detect/Reset, DMA, LCD, PWM, WDT
Number of I/O 38
Program Memory Size 128KB (128K x 8)
Program Memory Type FLASH
RAM Size 64K x 8
Voltage – Supply (Vcc/Vdd) 1.71V ~ 3.6V
Data Converters A/D 10x12b; D/A 2x12b
Oscillator Type Internal
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Supplier Device Package 48-UFQFPN (7×7)
Package / Case 48-UFQFN Exposed Pad

Availability & Supply Status

  • Status: Long Lead (30wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 2,059 units
  • Standard Lead Time: 30 weeks

Datasheet

Download the official STM32L433CBU6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source STM32L433CBU6 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the STM32L433CBU6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


SC1510-A4 – Raspberry Pi

Looking for the SC1510-A4 by Raspberry Pi? This – microcontroller ic 80-qfn (10×10) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The SC1510-A4 is classified under Embedded in the Integrated Circuits (ICs) category.

SC1510-A4 Specifications

Parameter Value
Mounting Type Surface Mount
Supplier Device Package 80-QFN (10×10)
Package / Case 80-VFQFN Exposed Pad

Availability & Supply Status

  • Status: Long Lead (22wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 4,475 units
  • Standard Lead Time: 22 weeks

Datasheet

Download the official SC1510-A4 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source SC1510-A4 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the SC1510-A4? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


FDMC86116LZ – onsemi

Looking for the FDMC86116LZ by onsemi? This n-channel 100 v 3.3a (ta), 7.5a (tc) 2.3w (ta), 19w (tc) surface mount 8-mlp (3.3×3.3) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The FDMC86116LZ is classified under Transistors in the Discrete Semiconductor Products category, part of the PowerTrench® series.

FDMC86116LZ Specifications

Parameter Value
FET Type N-Channel
Technology MOSFET (Metal Oxide)
Drain to Source Voltage (Vdss) 100 V
Current – Continuous Drain (Id) @ 25°C 3.3A (Ta), 7.5A (Tc)
Drive Voltage (Max Rds On, Min Rds On) 4.5V, 10V
Rds On (Max) @ Id, Vgs 103mOhm @ 3.3A, 10V
Vgs(th) (Max) @ Id 2.2V @ 250µA
Gate Charge (Qg) (Max) @ Vgs 6 nC @ 10 V
Vgs (Max) ±20V
Input Capacitance (Ciss) (Max) @ Vds 310 pF @ 50 V
Power Dissipation (Max) 2.3W (Ta), 19W (Tc)
Operating Temperature -55°C ~ 150°C (TJ)
Mounting Type Surface Mount
Supplier Device Package 8-MLP (3.3×3.3)
Package / Case 8-PowerWDFN

Availability & Supply Status

  • Status: Long Lead (22wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 13,445 units
  • Standard Lead Time: 22 weeks

Datasheet

Download the official FDMC86116LZ datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source FDMC86116LZ from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the FDMC86116LZ? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


SCT3022ALGC11 – Rohm Semiconductor

Looking for the SCT3022ALGC11 by Rohm Semiconductor? This n-channel 650 v 93a (tc) 339w (tc) through hole to-247n is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The SCT3022ALGC11 is classified under Transistors in the Discrete Semiconductor Products category.

SCT3022ALGC11 Specifications

Parameter Value
FET Type N-Channel
Technology SiCFET (Silicon Carbide)
Drain to Source Voltage (Vdss) 650 V
Current – Continuous Drain (Id) @ 25°C 93A (Tc)
Drive Voltage (Max Rds On, Min Rds On) 18V
Rds On (Max) @ Id, Vgs 28.6mOhm @ 36A, 18V
Vgs(th) (Max) @ Id 5.6V @ 18.2mA
Gate Charge (Qg) (Max) @ Vgs 133 nC @ 18 V
Vgs (Max) +22V, -4V
Input Capacitance (Ciss) (Max) @ Vds 2208 pF @ 500 V
Power Dissipation (Max) 339W (Tc)
Operating Temperature 175°C (TJ)
Mounting Type Through Hole
Supplier Device Package TO-247N
Package / Case TO-247-3

Availability & Supply Status

  • Status: Long Lead (27wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 1,100 units
  • Standard Lead Time: 27 weeks

Datasheet

Download the official SCT3022ALGC11 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source SCT3022ALGC11 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the SCT3022ALGC11? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


ADP3338AKCZ-3.3RL7 – Analog Devices Inc.

Looking for the ADP3338AKCZ-3.3RL7 by Analog Devices Inc.? This linear voltage regulator ic positive fixed 1 output 1a sot-223-3 is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The ADP3338AKCZ-3.3RL7 is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category, part of the anyCAP® series.

ADP3338AKCZ-3.3RL7 Specifications

Parameter Value
Output Configuration Positive
Output Type Fixed
Number of Regulators 1
Voltage – Input (Max) 8V
Voltage – Output (Min/Fixed) 3.3V
Voltage Dropout (Max) 0.4V @ 1A
Current – Output 1A
Current – Quiescent (Iq) 190 µA
Current – Supply (Max) 30 mA
Protection Features Over Current, Over Temperature
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Package / Case TO-261-4, TO-261AA
Supplier Device Package SOT-223-3

Availability & Supply Status

  • Status: End of Life – Stock Available
  • Lifecycle: End of Life
  • Distribution Stock: 4,347 units
  • Standard Lead Time: 39 weeks

Datasheet

Download the official ADP3338AKCZ-3.3RL7 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source ADP3338AKCZ-3.3RL7 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the ADP3338AKCZ-3.3RL7? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


STM32F429IIT6 – STMicroelectronics

Looking for the STM32F429IIT6 by STMicroelectronics? This arm® cortex®-m4 stm32f4 microcontroller ic 32-bit 180mhz 2mb (2m x 8) flash 176-lqfp (24×24) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The STM32F429IIT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F4 series.

STM32F429IIT6 Specifications

Parameter Value
DigiKey Programmable Not Verified
Core Processor ARM® Cortex®-M4
Core Size 32-Bit
Speed 180MHz
Connectivity CANbus, EBI/EMI, Ethernet, I2C, IrDA, LINbus, SPI, UART/USART, USB OTG
Peripherals Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT
Number of I/O 140
Program Memory Size 2MB (2M x 8)
Program Memory Type FLASH
RAM Size 256K x 8
Voltage – Supply (Vcc/Vdd) 1.8V ~ 3.6V
Data Converters A/D 24x12b; D/A 2x12b
Oscillator Type Internal
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Supplier Device Package 176-LQFP (24×24)
Package / Case 176-LQFP

Availability & Supply Status

  • Status: Long Lead (30wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 1,109 units
  • Standard Lead Time: 30 weeks

Datasheet

Download the official STM32F429IIT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source STM32F429IIT6 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the STM32F429IIT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


MP2155GQ-P – Monolithic Power Systems Inc.

Looking for the MP2155GQ-P by Monolithic Power Systems Inc.? This buck-boost switching regulator ic positive adjustable (fixed) 1.5v (3.3v) 1 output 1a, 2.2a 10-vfdfn exposed pad is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The MP2155GQ-P is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.

MP2155GQ-P Specifications

Parameter Value
Function Step-Up/Step-Down
Output Configuration Positive
Topology Buck-Boost
Output Type Adjustable (Fixed)
Number of Outputs 1
Voltage – Input (Min) 2V
Voltage – Input (Max) 5.5V
Voltage – Output (Min/Fixed) 1.5V (3.3V)
Voltage – Output (Max) 5V
Current – Output 1A, 2.2A
Frequency – Switching 1MHz
Synchronous Rectifier Yes
Operating Temperature -40°C ~ 125°C (TJ)
Mounting Type Surface Mount
Package / Case 10-VFDFN Exposed Pad
Supplier Device Package 10-QFN (3×3)

Availability & Supply Status

  • Status: Long Lead (36wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 1,869 units
  • Standard Lead Time: 36 weeks

Datasheet

Download the official MP2155GQ-P datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source MP2155GQ-P from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the MP2155GQ-P? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


MP2104DJ-LF-Z – Monolithic Power Systems Inc.

Looking for the MP2104DJ-LF-Z by Monolithic Power Systems Inc.? This buck switching regulator ic positive adjustable 0.6v 1 output 600ma sot-23-5 thin, tsot-23-5 is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The MP2104DJ-LF-Z is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.

MP2104DJ-LF-Z Specifications

Parameter Value
Function Step-Down
Output Configuration Positive
Topology Buck
Output Type Adjustable
Number of Outputs 1
Voltage – Input (Min) 2.5V
Voltage – Input (Max) 6V
Voltage – Output (Min/Fixed) 0.6V
Voltage – Output (Max) 6V
Current – Output 600mA
Frequency – Switching 1.7MHz
Synchronous Rectifier Yes
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Package / Case SOT-23-5 Thin, TSOT-23-5
Supplier Device Package TSOT-23-5

Availability & Supply Status

  • Status: End of Life – Stock Available
  • Lifecycle: End of Life
  • Distribution Stock: 12,751 units
  • Standard Lead Time: 24 weeks

Datasheet

Download the official MP2104DJ-LF-Z datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source MP2104DJ-LF-Z from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the MP2104DJ-LF-Z? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


STM32WL55JCI6 – STMicroelectronics

Looking for the STM32WL55JCI6 by STMicroelectronics? This ic rf txrx + mcu 802.15.4 lorawan 1.0, sigfox 150mhz ~ 960mhz 73-ufbga is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The STM32WL55JCI6 is classified under RF Transceiver ICs in the RF and Wireless category, part of the STM32WL series.

STM32WL55JCI6 Specifications

Parameter Value
DigiKey Programmable Not Verified
Type TxRx + MCU
RF Family/Standard 802.15.4
Protocol LoRaWAN 1.0, Sigfox
Modulation BPSK, GFSK, GMSK, FSK, MSK
Frequency 150MHz ~ 960MHz
Data Rate (Max) 300kbps
Power – Output 22dBm
Sensitivity -148dBm
Memory Size 256kB Flash
Serial Interfaces ADC, GPIO, I2C, SPI, IrDA, UART, USART
GPIO 43
Voltage – Supply 1.8V ~ 3.6V
Current – Receiving 4.82mA
Current – Transmitting 21mA ~ 120mA
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Package / Case 73-UFBGA
Supplier Device Package 73-UFBGA (5×5)

Availability & Supply Status

  • Status: Long Lead (30wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 2,760 units
  • Standard Lead Time: 30 weeks

Datasheet

Download the official STM32WL55JCI6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source STM32WL55JCI6 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the STM32WL55JCI6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.