IC ORDERS.com

IMW65R048M1HXKSA1 – Infineon Technologies

Looking for the IMW65R048M1HXKSA1 by Infineon Technologies? This n-channel 650 v 39a (tc) 125w (tc) through hole pg-to247-3-41 is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The IMW65R048M1HXKSA1 is classified under Transistors in the Discrete Semiconductor Products category, part of the CoolSIC™ M1 series.

IMW65R048M1HXKSA1 Specifications

Parameter Value
FET Type N-Channel
Technology SiCFET (Silicon Carbide)
Drain to Source Voltage (Vdss) 650 V
Current – Continuous Drain (Id) @ 25°C 39A (Tc)
Drive Voltage (Max Rds On, Min Rds On) 18V
Rds On (Max) @ Id, Vgs 64mOhm @ 20.1A, 18V
Vgs(th) (Max) @ Id 5.7V @ 6mA
Gate Charge (Qg) (Max) @ Vgs 33 nC @ 18 V
Vgs (Max) +23V, -5V
Input Capacitance (Ciss) (Max) @ Vds 1118 pF @ 400 V
Power Dissipation (Max) 125W (Tc)
Operating Temperature -55°C ~ 150°C (TJ)
Mounting Type Through Hole
Supplier Device Package PG-TO247-3-41
Package / Case TO-247-3

Availability & Supply Status

  • Status: End of Life – Stock Available
  • Lifecycle: End of Life
  • Distribution Stock: 292 units
  • Standard Lead Time: 61 weeks

Datasheet

Download the official IMW65R048M1HXKSA1 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source IMW65R048M1HXKSA1 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the IMW65R048M1HXKSA1? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


STM32C071FBP6 – STMicroelectronics

Looking for the STM32C071FBP6 by STMicroelectronics? This arm® cortex®-m0+ stm32c0 microcontroller ic 32-bit 48mhz 128kb (128k x 8) flash 20-tssop is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The STM32C071FBP6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32C0 series.

STM32C071FBP6 Specifications

Parameter Value
Core Processor ARM® Cortex®-M0+
Core Size 32-Bit
Speed 48MHz
Connectivity I2C, IrDA, LINbus, SPI, UART/USART
Peripherals Brown-out Detect/Reset, DMA, POR, PWM, Temp Sensor, WDT
Number of I/O 19
Program Memory Size 128KB (128K x 8)
Program Memory Type FLASH
RAM Size 24K x 8
Voltage – Supply (Vcc/Vdd) 2V ~ 3.6V
Data Converters A/D 13x12b SAR
Oscillator Type Internal
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Supplier Device Package 20-TSSOP
Package / Case 20-TSSOP (0.173", 4.40mm Width)

Availability & Supply Status

  • Status: Long Lead (30wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 515 units
  • Standard Lead Time: 30 weeks

Datasheet

Download the official STM32C071FBP6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source STM32C071FBP6 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the STM32C071FBP6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


ADUM1301BRWZ – Analog Devices Inc.

Looking for the ADUM1301BRWZ by Analog Devices Inc.? This general purpose digital isolator 2500vrms 3 channel 10mbps 25kv/µs cmti 16-soic (0.295", 7.50mm width) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The ADUM1301BRWZ is classified under Digital Isolators in the Isolators category, part of the iCoupler® series.

ADUM1301BRWZ Specifications

Parameter Value
Technology Magnetic Coupling
Type General Purpose
Isolated Power No
Number of Channels 3
Inputs – Side 1/Side 2 2/1
Channel Type Unidirectional
Voltage – Isolation 2500Vrms
Common Mode Transient Immunity (Min) 25kV/µs
Data Rate 10Mbps
Propagation Delay tpLH / tpHL (Max) 50ns, 50ns
Pulse Width Distortion (Max) 3ns
Rise / Fall Time (Typ) 2.5ns, 2.5ns
Voltage – Supply 2.7V ~ 5.5V
Operating Temperature -40°C ~ 105°C
Mounting Type Surface Mount
Package / Case 16-SOIC (0.295", 7.50mm Width)
Supplier Device Package 16-SOIC

Availability & Supply Status

  • Status: Long Lead (22wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 232 units
  • Standard Lead Time: 22 weeks

Datasheet

Download the official ADUM1301BRWZ datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source ADUM1301BRWZ from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the ADUM1301BRWZ? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


STM32F100C8T6B – STMicroelectronics

Looking for the STM32F100C8T6B by STMicroelectronics? This arm® cortex®-m3 stm32f1 microcontroller ic 32-bit 24mhz 64kb (64k x 8) flash 48-lqfp (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The STM32F100C8T6B is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F1 series.

STM32F100C8T6B Specifications

Parameter Value
DigiKey Programmable Not Verified
Core Processor ARM® Cortex®-M3
Core Size 32-Bit
Speed 24MHz
Connectivity I2C, IrDA, LINbus, SPI, UART/USART
Peripherals DMA, PDR, POR, PVD, PWM, Temp Sensor, WDT
Number of I/O 37
Program Memory Size 64KB (64K x 8)
Program Memory Type FLASH
RAM Size 8K x 8
Voltage – Supply (Vcc/Vdd) 2V ~ 3.6V
Data Converters A/D 10x12b; D/A 2x12b
Oscillator Type Internal
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Supplier Device Package 48-LQFP (7×7)
Package / Case 48-LQFP

Availability & Supply Status

  • Status: Long Lead (30wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 590 units
  • Standard Lead Time: 30 weeks

Datasheet

Download the official STM32F100C8T6B datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source STM32F100C8T6B from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the STM32F100C8T6B? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


STM32G431K6T6 – STMicroelectronics

Looking for the STM32G431K6T6 by STMicroelectronics? This arm® cortex®-m4 stm32g4 microcontroller ic 32-bit 170mhz 32kb (32k x 8) flash 32-lqfp (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The STM32G431K6T6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32G4 series.

STM32G431K6T6 Specifications

Parameter Value
Core Processor ARM® Cortex®-M4
Core Size 32-Bit
Speed 170MHz
Connectivity CANbus, I2C, IrDA, LINbus, SPI, UART/USART
Peripherals Brown-out Detect/Reset, DMA, I2S, POR, PWM, WDT
Number of I/O 26
Program Memory Size 32KB (32K x 8)
Program Memory Type FLASH
RAM Size 32K x 8
Voltage – Supply (Vcc/Vdd) 1.71V ~ 3.6V
Data Converters A/D 11x12b SAR; D/A 4x12b
Oscillator Type Internal
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Supplier Device Package 32-LQFP (7×7)
Package / Case 32-LQFP

Availability & Supply Status

  • Status: Long Lead (30wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 1,484 units
  • Standard Lead Time: 30 weeks

Datasheet

Download the official STM32G431K6T6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source STM32G431K6T6 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the STM32G431K6T6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


NCV4274ADT50RKG – onsemi

Looking for the NCV4274ADT50RKG by onsemi? This linear voltage regulator ic positive fixed 1 output 400ma dpak is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The NCV4274ADT50RKG is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.

NCV4274ADT50RKG Specifications

Parameter Value
Output Configuration Positive
Output Type Fixed
Number of Regulators 1
Voltage – Input (Max) 40V
Voltage – Output (Min/Fixed) 5V
Voltage Dropout (Max) 0.5V @ 250mA
Current – Output 400mA
Current – Quiescent (Iq) 250 µA
Current – Supply (Max) 35 mA
PSRR 60dB (100Hz)
Protection Features Over Temperature, Reverse Polarity, Short Circuit
Operating Temperature -40°C ~ 150°C (TJ)
Grade Automotive
Qualification AEC-Q100
Mounting Type Surface Mount
Package / Case TO-252-3, DPAK (2 Leads + Tab), SC-63
Supplier Device Package DPAK

Availability & Supply Status

  • Status: End of Life – Stock Available
  • Lifecycle: End of Life
  • Distribution Stock: 11,273 units
  • Manufacturer Stock: 7,500 units
  • Standard Lead Time: 7 weeks

Datasheet

Download the official NCV4274ADT50RKG datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source NCV4274ADT50RKG from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the NCV4274ADT50RKG? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


STM32F302RCT6 – STMicroelectronics

Looking for the STM32F302RCT6 by STMicroelectronics? This arm® cortex®-m4 stm32f3 microcontroller ic 32-bit 72mhz 256kb (256k x 8) flash 64-lqfp (10×10) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The STM32F302RCT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F3 series.

STM32F302RCT6 Specifications

Parameter Value
DigiKey Programmable Not Verified
Core Processor ARM® Cortex®-M4
Core Size 32-Bit
Speed 72MHz
Connectivity CANbus, I2C, IrDA, LINbus, SPI, UART/USART, USB
Peripherals DMA, I2S, POR, PWM, WDT
Number of I/O 52
Program Memory Size 256KB (256K x 8)
Program Memory Type FLASH
RAM Size 40K x 8
Voltage – Supply (Vcc/Vdd) 2V ~ 3.6V
Data Converters A/D 16x12b; D/A 1x12b
Oscillator Type Internal
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Supplier Device Package 64-LQFP (10×10)
Package / Case 64-LQFP

Availability & Supply Status

  • Status: Long Lead (30wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 484 units
  • Standard Lead Time: 30 weeks

Datasheet

Download the official STM32F302RCT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source STM32F302RCT6 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the STM32F302RCT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


MIC4421YM – Microchip Technology

Looking for the MIC4421YM by Microchip Technology? This low-side gate driver ic inverting 8-soic is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The MIC4421YM is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.

MIC4421YM Specifications

Parameter Value
DigiKey Programmable Not Verified
Driven Configuration Low-Side
Channel Type Single
Number of Drivers 1
Gate Type IGBT, MOSFET (N-Channel)
Voltage – Supply 4.5V ~ 18V
Logic Voltage – VIL, VIH 0.8V, 2.4V
Current – Peak Output (Source, Sink) 9A, 9A
Input Type Inverting
Rise / Fall Time (Typ) 20ns, 24ns
Operating Temperature -40°C ~ 150°C (TJ)
Mounting Type Surface Mount
Package / Case 8-SOIC (0.154", 3.90mm Width)
Supplier Device Package 8-SOIC

Availability & Supply Status

  • Status: Long Lead (99wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 1,387 units
  • Standard Lead Time: 99 weeks

Datasheet

Download the official MIC4421YM datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source MIC4421YM from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the MIC4421YM? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


STM32L552RET6 – STMicroelectronics

Looking for the STM32L552RET6 by STMicroelectronics? This arm® cortex®-m33 stm32l5 microcontroller ic 32-bit 110mhz 512kb (512k x 8) flash 64-lqfp (10×10) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The STM32L552RET6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32L5 series.

STM32L552RET6 Specifications

Parameter Value
DigiKey Programmable Not Verified
Core Processor ARM® Cortex®-M33
Core Size 32-Bit
Speed 110MHz
Connectivity CANbus, I2C, IrDA, LINbus, MMC/SD, QSPI, SAI, SPI, UART/USART, USB
Peripherals Brown-out Detect/Reset, DMA, PWM, WDT
Number of I/O 52
Program Memory Size 512KB (512K x 8)
Program Memory Type FLASH
RAM Size 256K x 8
Voltage – Supply (Vcc/Vdd) 1.71V ~ 3.6V
Data Converters A/D 16x12b; D/A 2x12b
Oscillator Type Internal
Operating Temperature -40°C ~ 85°C (TA)
Mounting Type Surface Mount
Supplier Device Package 64-LQFP (10×10)
Package / Case 64-LQFP

Availability & Supply Status

  • Status: Long Lead (30wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 818 units
  • Standard Lead Time: 30 weeks

Datasheet

Download the official STM32L552RET6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source STM32L552RET6 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the STM32L552RET6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.


QPF4288ATR13 – Qorvo

Looking for the QPF4288ATR13 by Qorvo? This rf front end 2.412ghz ~ 2.484ghz 802.11ax, wi-fi 24-qfn (5×3) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.

The QPF4288ATR13 is classified under RF Front End (LNA + PA) in the RF and Wireless category.

QPF4288ATR13 Specifications

Parameter Value
RF Type 802.11ax, Wi-Fi
Frequency 2.412GHz ~ 2.484GHz
Features SP2T
Package / Case 24-VFQFN Exposed Pad
Supplier Device Package 24-QFN (5×3)

Availability & Supply Status

  • Status: Long Lead (35wk) – We May Beat This
  • Lifecycle: Active
  • Distribution Stock: 4,914 units
  • Standard Lead Time: 35 weeks

Datasheet

Download the official QPF4288ATR13 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.

Why Source QPF4288ATR13 from ICCorders?

  • Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
  • Full Traceability: Complete documentation and chain of custody for every part.
  • Global Sourcing Network: Access to stock that standard distributors cannot reach.
  • Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.

Request a Quote

Need the QPF4288ATR13? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.