STM32F407VGT6 – STMicroelectronics
April 18, 2026
Looking for the STM32F407VGT6 by STMicroelectronics? This arm® cortex®-m4 stm32f4 microcontroller ic 32-bit 168mhz 1mb (1m x 8) flash 100-lqfp (14×14) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F407VGT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F4 series.
STM32F407VGT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
168MHz |
| Connectivity |
CANbus, DCMI, EBI/EMI, Ethernet, I2C, IrDA, LINbus, SPI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT |
| Number of I/O |
82 |
| Program Memory Size |
1MB (1M x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
192K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.8V ~ 3.6V |
| Data Converters |
A/D 16x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
100-LQFP (14×14) |
| Package / Case |
100-LQFP |
Availability & Supply Status
- Status: Long Lead (52wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 7,759 units
- Standard Lead Time: 52 weeks
Datasheet
Download the official STM32F407VGT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F407VGT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F407VGT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
MP2105DJ-LF-Z – Monolithic Power Systems Inc.
April 18, 2026
Looking for the MP2105DJ-LF-Z by Monolithic Power Systems Inc.? This buck switching regulator ic positive adjustable 0.6v 1 output 800ma sot-23-5 thin, tsot-23-5 is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The MP2105DJ-LF-Z is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.
MP2105DJ-LF-Z Specifications
| Parameter |
Value |
| Function |
Step-Down |
| Output Configuration |
Positive |
| Topology |
Buck |
| Output Type |
Adjustable |
| Number of Outputs |
1 |
| Voltage – Input (Min) |
2.5V |
| Voltage – Input (Max) |
6V |
| Voltage – Output (Min/Fixed) |
0.6V |
| Voltage – Output (Max) |
6V |
| Current – Output |
800mA |
| Frequency – Switching |
1.05MHz |
| Synchronous Rectifier |
Yes |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Package / Case |
SOT-23-5 Thin, TSOT-23-5 |
| Supplier Device Package |
TSOT-23-5 |
Availability & Supply Status
- Status: End of Life – Stock Available
- Lifecycle: End of Life
- Distribution Stock: 940 units
- Standard Lead Time: 24 weeks
Datasheet
Download the official MP2105DJ-LF-Z datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source MP2105DJ-LF-Z from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the MP2105DJ-LF-Z? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
MIC29302WU – Microchip Technology
April 18, 2026
Looking for the MIC29302WU by Microchip Technology? This linear voltage regulator ic positive adjustable 1 output 3a to-263-5 is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The MIC29302WU is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.
MIC29302WU Specifications
| Parameter |
Value |
| Output Configuration |
Positive |
| Output Type |
Adjustable |
| Number of Regulators |
1 |
| Voltage – Input (Max) |
26V |
| Voltage – Output (Min/Fixed) |
1.25V |
| Voltage – Output (Max) |
25V |
| Voltage Dropout (Max) |
0.6V @ 3A |
| Current – Output |
3A |
| Control Features |
Enable |
| Protection Features |
Over Current, Over Temperature, Reverse Polarity, Transient Voltage |
| Operating Temperature |
-40°C ~ 125°C |
| Mounting Type |
Surface Mount |
| Package / Case |
TO-263-6, D2PAK (5 Leads + Tab), TO-263BA |
| Supplier Device Package |
TO-263-5 |
Availability & Supply Status
- Status: Long Lead (22wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 2,001 units
- Standard Lead Time: 22 weeks
Datasheet
Download the official MIC29302WU datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source MIC29302WU from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the MIC29302WU? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
FT231XS-U – FTDI, Future Technology Devices International Ltd
April 18, 2026
Looking for the FT231XS-U by FTDI, Future Technology Devices International Ltd? This usb bridge, usb to uart usb 2.0 uart interface 20-ssop is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The FT231XS-U is classified under Interface in the Integrated Circuits (ICs) category, part of the USBmadeEZ-UART, FT-X, X-Chip series.
FT231XS-U Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Protocol |
USB |
| Function |
Bridge, USB to UART |
| Interface |
UART |
| Standards |
USB 2.0 |
| Voltage – Supply |
3.3V ~ 5V |
| Current – Supply |
8mA |
| Operating Temperature |
-40°C ~ 85°C |
| Package / Case |
20-SSOP (0.154", 3.90mm Width) |
| Supplier Device Package |
20-SSOP |
Availability & Supply Status
- Status: Long Lead (42wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 3,943 units
- Standard Lead Time: 42 weeks
Datasheet
Download the official FT231XS-U datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source FT231XS-U from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the FT231XS-U? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32G031K6T6 – STMicroelectronics
April 18, 2026
Looking for the STM32G031K6T6 by STMicroelectronics? This arm® cortex®-m0+ stm32g0 microcontroller ic 32-bit 64mhz 32kb (32k x 8) flash 32-lqfp (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32G031K6T6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32G0 series.
STM32G031K6T6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M0+ |
| Core Size |
32-Bit |
| Speed |
64MHz |
| Connectivity |
I2C, IrDA, LINbus, SPI, SmartCard, UART/USART |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, POR, PWM, WDT |
| Number of I/O |
30 |
| Program Memory Size |
32KB (32K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
8K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.7V ~ 3.6V |
| Data Converters |
A/D 18x12b SAR |
| Oscillator Type |
External, Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
32-LQFP (7×7) |
| Package / Case |
32-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 1,089 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32G031K6T6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32G031K6T6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32G031K6T6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
TC4428EOA – Microchip Technology
April 18, 2026
Looking for the TC4428EOA by Microchip Technology? This low-side gate driver ic inverting, non-inverting 8-soic is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The TC4428EOA is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.
TC4428EOA Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Driven Configuration |
Low-Side |
| Channel Type |
Independent |
| Number of Drivers |
2 |
| Gate Type |
MOSFET (N-Channel, P-Channel) |
| Voltage – Supply |
4.5V ~ 18V |
| Logic Voltage – VIL, VIH |
0.8V, 2.4V |
| Current – Peak Output (Source, Sink) |
1.5A, 1.5A |
| Input Type |
Inverting, Non-Inverting |
| Rise / Fall Time (Typ) |
19ns, 19ns |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Package / Case |
8-SOIC (0.154", 3.90mm Width) |
| Supplier Device Package |
8-SOIC |
Availability & Supply Status
- Status: Long Lead (28wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 6,330 units
- Standard Lead Time: 28 weeks
Datasheet
Download the official TC4428EOA datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source TC4428EOA from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the TC4428EOA? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F205RGT6 – STMicroelectronics
April 17, 2026
Looking for the STM32F205RGT6 by STMicroelectronics? This arm® cortex®-m3 stm32f2 microcontroller ic 32-bit 120mhz 1mb (1m x 8) flash 64-lqfp (10×10) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F205RGT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F2 series.
STM32F205RGT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Verified |
| Core Processor |
ARM® Cortex®-M3 |
| Core Size |
32-Bit |
| Speed |
120MHz |
| Connectivity |
CANbus, I2C, IrDA, LINbus, MMC, SPI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT |
| Number of I/O |
51 |
| Program Memory Size |
1MB (1M x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
132K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.8V ~ 3.6V |
| Data Converters |
A/D 16x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
64-LQFP (10×10) |
| Package / Case |
64-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 252 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F205RGT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F205RGT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F205RGT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F302C6T6 – STMicroelectronics
April 17, 2026
Looking for the STM32F302C6T6 by STMicroelectronics? This arm® cortex®-m4 stm32f3 microcontroller ic 32-bit 72mhz 32kb (32k x 8) flash 48-lqfp (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F302C6T6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F3 series.
STM32F302C6T6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
72MHz |
| Connectivity |
CANbus, I2C, IrDA, LINbus, SPI, UART/USART, USB |
| Peripherals |
DMA, I2S, POR, PWM, WDT |
| Number of I/O |
37 |
| Program Memory Size |
32KB (32K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
16K x 8 |
| Voltage – Supply (Vcc/Vdd) |
2V ~ 3.6V |
| Data Converters |
A/D 11x12b; D/A 1x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
48-LQFP (7×7) |
| Package / Case |
48-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 4,840 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F302C6T6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F302C6T6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F302C6T6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32G070RBT6 – STMicroelectronics
April 17, 2026
Looking for the STM32G070RBT6 by STMicroelectronics? This arm® cortex®-m0+ stm32g0 microcontroller ic 32-bit 64mhz 128kb (128k x 8) flash 64-lqfp (10×10) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32G070RBT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32G0 series.
STM32G070RBT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M0+ |
| Core Size |
32-Bit |
| Speed |
64MHz |
| Connectivity |
I2C, IrDA, LINbus, SPI, SmartCard, UART/USART |
| Peripherals |
DMA, I2S, POR, PWM, WDT |
| Number of I/O |
59 |
| Program Memory Size |
128KB (128K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
36K x 8 |
| Voltage – Supply (Vcc/Vdd) |
2V ~ 3.6V |
| Data Converters |
A/D 19x12b |
| Oscillator Type |
External, Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
64-LQFP (10×10) |
| Package / Case |
64-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 3,221 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32G070RBT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32G070RBT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32G070RBT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32H755ZIT6 – STMicroelectronics
April 16, 2026
Looking for the STM32H755ZIT6 by STMicroelectronics? This arm® cortex®-m4/m7 stm32h7 microcontroller ic 32-bit dual-core 240mhz, 480mhz 2mb (2m x 8) flash 144-lqfp (20×20) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32H755ZIT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32H7 series.
STM32H755ZIT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4/M7 |
| Core Size |
32-Bit Dual-Core |
| Speed |
240MHz, 480MHz |
| Connectivity |
CANbus, EBI/EMI, Ethernet, I2C, IrDA, LINbus, MDIO, MMC/SD/SDIO, QSPI, SAI, SPDIF, SPI, SWPMI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT |
| Number of I/O |
97 |
| Program Memory Size |
2MB (2M x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
1M x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.62V ~ 3.6V |
| Data Converters |
A/D 23x16b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
144-LQFP (20×20) |
| Package / Case |
144-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 290 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32H755ZIT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32H755ZIT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32H755ZIT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.