AS4C512M16D3LB-12BIN – Alliance Memory, Inc.
April 16, 2026
Looking for the AS4C512M16D3LB-12BIN by Alliance Memory, Inc.? This sdram – ddr3l memory ic 8gbit parallel 800 mhz 20 ns 96-fbga (13.5×9) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The AS4C512M16D3LB-12BIN is classified under Memory in the Integrated Circuits (ICs) category.
AS4C512M16D3LB-12BIN Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Memory Type |
Volatile |
| Memory Format |
DRAM |
| Technology |
SDRAM – DDR3L |
| Memory Size |
8Gbit |
| Memory Organization |
512M x 16 |
| Memory Interface |
Parallel |
| Clock Frequency |
800 MHz |
| Write Cycle Time – Word, Page |
15ns |
| Access Time |
20 ns |
| Voltage – Supply |
1.283V ~ 1.45V |
| Operating Temperature |
-40°C ~ 95°C (TC) |
| Mounting Type |
Surface Mount |
| Package / Case |
96-TFBGA |
| Supplier Device Package |
96-FBGA (13.5×9) |
Availability & Supply Status
- Status: End of Life – Stock Available
- Lifecycle: End of Life
- Distribution Stock: 601 units
- Standard Lead Time: 20 weeks
Datasheet
Download the official AS4C512M16D3LB-12BIN datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source AS4C512M16D3LB-12BIN from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the AS4C512M16D3LB-12BIN? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
M24C64-WMN6P – STMicroelectronics
April 16, 2026
Looking for the M24C64-WMN6P by STMicroelectronics? This eeprom memory ic 64kbit i2c 1 mhz 450 ns 8-soic is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The M24C64-WMN6P is classified under Memory in the Integrated Circuits (ICs) category.
M24C64-WMN6P Specifications
| Parameter |
Value |
| DigiKey Programmable |
Verified |
| Memory Type |
Non-Volatile |
| Memory Format |
EEPROM |
| Technology |
EEPROM |
| Memory Size |
64Kbit |
| Memory Organization |
8K x 8 |
| Memory Interface |
I2C |
| Clock Frequency |
1 MHz |
| Write Cycle Time – Word, Page |
5ms |
| Access Time |
450 ns |
| Voltage – Supply |
2.5V ~ 5.5V |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Package / Case |
8-SOIC (0.154", 3.90mm Width) |
| Supplier Device Package |
8-SOIC |
Availability & Supply Status
- Status: End of Life – Stock Available
- Lifecycle: End of Life
- Distribution Stock: 1,843 units
- Standard Lead Time: 16 weeks
Datasheet
Download the official M24C64-WMN6P datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source M24C64-WMN6P from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the M24C64-WMN6P? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
NAU7802SGI – Nuvoton Technology Corporation
April 16, 2026
Looking for the NAU7802SGI by Nuvoton Technology Corporation? This 24 bit analog to digital converter 2 input 1 sigma-delta 16-sop is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The NAU7802SGI is classified under Data Acquisition in the Integrated Circuits (ICs) category.
NAU7802SGI Specifications
| Parameter |
Value |
| Number of Bits |
24 |
| Sampling Rate (Per Second) |
80 |
| Number of Inputs |
2 |
| Input Type |
Differential, Single Ended |
| Data Interface |
I2C |
| Configuration |
MUX-PGA-ADC |
| Number of A/D Converters |
1 |
| Architecture |
Sigma-Delta |
| Reference Type |
External, Internal |
| Voltage – Supply, Analog |
2.7V ~ 5.5V |
| Voltage – Supply, Digital |
2.7V ~ 5.5V |
| Features |
PGA, Temperature Sensor |
| Operating Temperature |
-40°C ~ 85°C |
| Package / Case |
16-SOIC (0.154", 3.90mm Width) |
| Supplier Device Package |
16-SOP |
| Mounting Type |
Surface Mount |
Availability & Supply Status
- Status: Long Lead (26wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 40,797 units
- Standard Lead Time: 26 weeks
Datasheet
Download the official NAU7802SGI datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source NAU7802SGI from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the NAU7802SGI? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32H747AGI6 – STMicroelectronics
April 16, 2026
Looking for the STM32H747AGI6 by STMicroelectronics? This arm® cortex®-m4/m7 stm32h7 microcontroller ic 32-bit dual-core 240mhz, 480mhz 1mb (1m x 8) flash 169-ufbga (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32H747AGI6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32H7 series.
STM32H747AGI6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4/M7 |
| Core Size |
32-Bit Dual-Core |
| Speed |
240MHz, 480MHz |
| Connectivity |
CANbus, EBI/EMI, Ethernet, I2C, IrDA, LINbus, MDIO, MMC/SD/SDIO, QSPI, SAI, SPDIF, SPI, SWPMI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT |
| Number of I/O |
112 |
| Program Memory Size |
1MB (1M x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
1M x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.62V ~ 3.6V |
| Data Converters |
A/D 28x16b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
169-UFBGA (7×7) |
| Package / Case |
169-UFBGA |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 2,493 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32H747AGI6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32H747AGI6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32H747AGI6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32H745XGH6 – STMicroelectronics
April 16, 2026
Looking for the STM32H745XGH6 by STMicroelectronics? This arm® cortex®-m4/m7 stm32h7 microcontroller ic 32-bit dual-core 240mhz, 480mhz 1mb (1m x 8) flash 240+25-tfbga (14×14) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32H745XGH6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32H7 series.
STM32H745XGH6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4/M7 |
| Core Size |
32-Bit Dual-Core |
| Speed |
240MHz, 480MHz |
| Connectivity |
CANbus, EBI/EMI, Ethernet, I2C, IrDA, LINbus, MDIO, MMC/SD/SDIO, QSPI, SAI, SPDIF, SPI, SWPMI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT |
| Number of I/O |
168 |
| Program Memory Size |
1MB (1M x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
1M x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.62V ~ 3.6V |
| Data Converters |
A/D 36x16b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
240+25-TFBGA (14×14) |
| Package / Case |
265-TFBGA |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 632 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32H745XGH6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32H745XGH6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32H745XGH6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
CP2102N-A02-GQFN28 – Silicon Labs
April 16, 2026
Looking for the CP2102N-A02-GQFN28 by Silicon Labs? This usb bridge, usb to uart usb 2.0 uart interface 28-qfn (5×5) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The CP2102N-A02-GQFN28 is classified under Interface in the Integrated Circuits (ICs) category, part of the USBXpress™ series.
CP2102N-A02-GQFN28 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Protocol |
USB |
| Function |
Bridge, USB to UART |
| Interface |
UART |
| Standards |
USB 2.0 |
| Voltage – Supply |
3V ~ 3.6V |
| Current – Supply |
9.5mA |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Package / Case |
28-WFQFN Exposed Pad |
| Supplier Device Package |
28-QFN (5×5) |
Availability & Supply Status
- Status: Long Lead (26wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 1,406 units
- Standard Lead Time: 26 weeks
Datasheet
Download the official CP2102N-A02-GQFN28 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source CP2102N-A02-GQFN28 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the CP2102N-A02-GQFN28? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F429IET6 – STMicroelectronics
April 16, 2026
Looking for the STM32F429IET6 by STMicroelectronics? This arm® cortex®-m4 stm32f4 microcontroller ic 32-bit 180mhz 512kb (512k x 8) flash 176-lqfp (24×24) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F429IET6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F4 series.
STM32F429IET6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
180MHz |
| Connectivity |
CANbus, EBI/EMI, Ethernet, I2C, IrDA, LINbus, SPI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT |
| Number of I/O |
140 |
| Program Memory Size |
512KB (512K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
256K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.8V ~ 3.6V |
| Data Converters |
A/D 24x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
176-LQFP (24×24) |
| Package / Case |
176-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 157 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F429IET6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F429IET6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F429IET6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
NTMFS4C09NT1G – onsemi
April 16, 2026
Looking for the NTMFS4C09NT1G by onsemi? This n-channel 30 v 9a (ta) 760mw (ta), 25.5w (tc) surface mount 5-dfn (5×6) (8-sofl) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The NTMFS4C09NT1G is classified under Transistors in the Discrete Semiconductor Products category.
NTMFS4C09NT1G Specifications
| Parameter |
Value |
| FET Type |
N-Channel |
| Technology |
MOSFET (Metal Oxide) |
| Drain to Source Voltage (Vdss) |
30 V |
| Current – Continuous Drain (Id) @ 25°C |
9A (Ta) |
| Drive Voltage (Max Rds On, Min Rds On) |
4.5V, 10V |
| Rds On (Max) @ Id, Vgs |
5.8mOhm @ 30A, 10V |
| Vgs(th) (Max) @ Id |
2.1V @ 250µA |
| Gate Charge (Qg) (Max) @ Vgs |
10.9 nC @ 4.5 V |
| Vgs (Max) |
±20V |
| Input Capacitance (Ciss) (Max) @ Vds |
1252 pF @ 15 V |
| Power Dissipation (Max) |
760mW (Ta), 25.5W (Tc) |
| Operating Temperature |
-55°C ~ 150°C (TJ) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
5-DFN (5×6) (8-SOFL) |
| Package / Case |
8-PowerTDFN, 5 Leads |
Availability & Supply Status
- Status: Long Lead (48wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 5,131 units
- Manufacturer Stock: 10,500 units
- Standard Lead Time: 48 weeks
Datasheet
Download the official NTMFS4C09NT1G datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source NTMFS4C09NT1G from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the NTMFS4C09NT1G? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F301C6T6 – STMicroelectronics
April 16, 2026
Looking for the STM32F301C6T6 by STMicroelectronics? This arm® cortex®-m4 stm32f3 microcontroller ic 32-bit 72mhz 32kb (32k x 8) flash 48-lqfp (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F301C6T6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F3 series.
STM32F301C6T6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
72MHz |
| Connectivity |
I2C, IrDA, LINbus, SPI, UART/USART |
| Peripherals |
DMA, I2S, POR, PWM, WDT |
| Number of I/O |
37 |
| Program Memory Size |
32KB (32K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
16K x 8 |
| Voltage – Supply (Vcc/Vdd) |
2V ~ 3.6V |
| Data Converters |
A/D 8x12b; D/A 1x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
48-LQFP (7×7) |
| Package / Case |
48-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 612 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F301C6T6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F301C6T6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F301C6T6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
IRFZ24NPBF – Infineon Technologies
April 16, 2026
Looking for the IRFZ24NPBF by Infineon Technologies? This n-channel 55 v 17a (tc) 45w (tc) through hole to-220ab is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The IRFZ24NPBF is classified under Transistors in the Discrete Semiconductor Products category, part of the HEXFET® series.
IRFZ24NPBF Specifications
| Parameter |
Value |
| FET Type |
N-Channel |
| Technology |
MOSFET (Metal Oxide) |
| Drain to Source Voltage (Vdss) |
55 V |
| Current – Continuous Drain (Id) @ 25°C |
17A (Tc) |
| Drive Voltage (Max Rds On, Min Rds On) |
10V |
| Rds On (Max) @ Id, Vgs |
70mOhm @ 10A, 10V |
| Vgs(th) (Max) @ Id |
4V @ 250µA |
| Gate Charge (Qg) (Max) @ Vgs |
20 nC @ 10 V |
| Vgs (Max) |
±20V |
| Input Capacitance (Ciss) (Max) @ Vds |
370 pF @ 25 V |
| Power Dissipation (Max) |
45W (Tc) |
| Operating Temperature |
-55°C ~ 175°C (TJ) |
| Mounting Type |
Through Hole |
| Supplier Device Package |
TO-220AB |
| Package / Case |
TO-220-3 |
Availability & Supply Status
- Status: End of Life – Stock Available
- Lifecycle: End of Life
- Distribution Stock: 15,688 units
- Standard Lead Time: 22 weeks
Datasheet
Download the official IRFZ24NPBF datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source IRFZ24NPBF from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the IRFZ24NPBF? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.