STM32F101C8T6 – STMicroelectronics
April 12, 2026
Looking for the STM32F101C8T6 by STMicroelectronics? This arm® cortex®-m3 stm32f1 microcontroller ic 32-bit 36mhz 64kb (64k x 8) flash 48-lqfp (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F101C8T6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F1 series.
STM32F101C8T6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M3 |
| Core Size |
32-Bit |
| Speed |
36MHz |
| Connectivity |
I2C, IrDA, LINbus, SPI, UART/USART |
| Peripherals |
DMA, PDR, POR, PVD, PWM, Temp Sensor, WDT |
| Number of I/O |
37 |
| Program Memory Size |
64KB (64K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
10K x 8 |
| Voltage – Supply (Vcc/Vdd) |
2V ~ 3.6V |
| Data Converters |
A/D 10x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
48-LQFP (7×7) |
| Package / Case |
48-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 1,374 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F101C8T6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F101C8T6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F101C8T6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
ADUM6201ARWZ – Analog Devices Inc.
April 12, 2026
Looking for the ADUM6201ARWZ by Analog Devices Inc.? This general purpose digital isolator 5000vrms 2 channel 1mbps 25kv/µs cmti 16-soic (0.295", 7.50mm width) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The ADUM6201ARWZ is classified under Digital Isolators in the Isolators category, part of the IsoPower®, iCoupler® series.
ADUM6201ARWZ Specifications
| Parameter |
Value |
| Technology |
Magnetic Coupling |
| Type |
General Purpose |
| Isolated Power |
Yes |
| Number of Channels |
2 |
| Inputs – Side 1/Side 2 |
1/1 |
| Channel Type |
Unidirectional |
| Voltage – Isolation |
5000Vrms |
| Common Mode Transient Immunity (Min) |
25kV/µs |
| Data Rate |
1Mbps |
| Propagation Delay tpLH / tpHL (Max) |
100ns, 100ns |
| Pulse Width Distortion (Max) |
40ns |
| Rise / Fall Time (Typ) |
2.5ns, 2.5ns |
| Voltage – Supply |
3V ~ 5.5V |
| Operating Temperature |
-40°C ~ 105°C |
| Mounting Type |
Surface Mount |
| Package / Case |
16-SOIC (0.295", 7.50mm Width) |
| Supplier Device Package |
16-SOIC |
Availability & Supply Status
- Status: Long Lead (33wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 174 units
- Standard Lead Time: 33 weeks
Datasheet
Download the official ADUM6201ARWZ datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source ADUM6201ARWZ from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the ADUM6201ARWZ? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F410RBT6 – STMicroelectronics
April 12, 2026
Looking for the STM32F410RBT6 by STMicroelectronics? This arm® cortex®-m4 stm32f4 microcontroller ic 32-bit 100mhz 128kb (128k x 8) flash 64-lqfp (10×10) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F410RBT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F4 series.
STM32F410RBT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
100MHz |
| Connectivity |
I2C, IrDA, LINbus, SPI, UART/USART |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, POR, PWM, WDT |
| Number of I/O |
50 |
| Program Memory Size |
128KB (128K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
32K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.7V ~ 3.6V |
| Data Converters |
A/D 16x12b; D/A 1x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
64-LQFP (10×10) |
| Package / Case |
64-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 1,342 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F410RBT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F410RBT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F410RBT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32L431KCU6 – STMicroelectronics
April 12, 2026
Looking for the STM32L431KCU6 by STMicroelectronics? This arm® cortex®-m4 stm32l4 microcontroller ic 32-bit 80mhz 256kb (256k x 8) flash 32-ufqfpn (5×5) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32L431KCU6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32L4 series.
STM32L431KCU6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
80MHz |
| Connectivity |
CANbus, I2C, IrDA, LINbus, QSPI, SAI, SPI, SWPMI, UART/USART |
| Peripherals |
Brown-out Detect/Reset, DMA, PWM, WDT |
| Number of I/O |
26 |
| Program Memory Size |
256KB (256K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
64K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.71V ~ 3.6V |
| Data Converters |
A/D 10x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
32-UFQFPN (5×5) |
| Package / Case |
32-UFQFN Exposed Pad |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 4,013 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32L431KCU6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32L431KCU6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32L431KCU6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32L072CZT6 – STMicroelectronics
April 12, 2026
Looking for the STM32L072CZT6 by STMicroelectronics? This arm® cortex®-m0+ stm32l0 microcontroller ic 32-bit 32mhz 192kb (192k x 8) flash 48-lqfp (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32L072CZT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32L0 series.
STM32L072CZT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M0+ |
| Core Size |
32-Bit |
| Speed |
32MHz |
| Connectivity |
I2C, IrDA, SPI, UART/USART, USB |
| Peripherals |
Brown-out Detect/Reset, DMA, POR, PWM, WDT |
| Number of I/O |
37 |
| Program Memory Size |
192KB (192K x 8) |
| Program Memory Type |
FLASH |
| EEPROM Size |
6K x 8 |
| RAM Size |
20K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.65V ~ 3.6V |
| Data Converters |
A/D 10x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
48-LQFP (7×7) |
| Package / Case |
48-LQFP |
Availability & Supply Status
- Status: Long Lead (40wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 1,373 units
- Standard Lead Time: 40 weeks
Datasheet
Download the official STM32L072CZT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32L072CZT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32L072CZT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32H757XIH6 – STMicroelectronics
April 11, 2026
Looking for the STM32H757XIH6 by STMicroelectronics? This arm® cortex®-m4/m7 stm32h7 microcontroller ic 32-bit dual-core 240mhz, 480mhz 2mb (2m x 8) flash 240+25-tfbga (14×14) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32H757XIH6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32H7 series.
STM32H757XIH6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4/M7 |
| Core Size |
32-Bit Dual-Core |
| Speed |
240MHz, 480MHz |
| Connectivity |
CANbus, EBI/EMI, Ethernet, I2C, IrDA, LINbus, MDIO, MMC/SD/SDIO, QSPI, SAI, SPDIF, SPI, SWPMI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT |
| Number of I/O |
168 |
| Program Memory Size |
2MB (2M x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
1M x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.62V ~ 3.6V |
| Data Converters |
A/D 36x16b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
240+25-TFBGA (14×14) |
| Package / Case |
265-TFBGA |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 809 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32H757XIH6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32H757XIH6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32H757XIH6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
IPP60R190C6XKSA1 – Infineon Technologies
April 11, 2026
Looking for the IPP60R190C6XKSA1 by Infineon Technologies? This n-channel 600 v 20.2a (tc) 151w (tc) through hole pg-to220-3 is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The IPP60R190C6XKSA1 is classified under Transistors in the Discrete Semiconductor Products category, part of the CoolMOS™ series.
IPP60R190C6XKSA1 Specifications
| Parameter |
Value |
| FET Type |
N-Channel |
| Technology |
MOSFET (Metal Oxide) |
| Drain to Source Voltage (Vdss) |
600 V |
| Current – Continuous Drain (Id) @ 25°C |
20.2A (Tc) |
| Drive Voltage (Max Rds On, Min Rds On) |
10V |
| Rds On (Max) @ Id, Vgs |
190mOhm @ 9.5A, 10V |
| Vgs(th) (Max) @ Id |
3.5V @ 630µA |
| Gate Charge (Qg) (Max) @ Vgs |
63 nC @ 10 V |
| Vgs (Max) |
±20V |
| Input Capacitance (Ciss) (Max) @ Vds |
1400 pF @ 100 V |
| Power Dissipation (Max) |
151W (Tc) |
| Operating Temperature |
-55°C ~ 150°C (TJ) |
| Mounting Type |
Through Hole |
| Supplier Device Package |
PG-TO220-3 |
| Package / Case |
TO-220-3 |
Availability & Supply Status
- Status: End of Life – Stock Available
- Lifecycle: End of Life
- Distribution Stock: 2,447 units
- Standard Lead Time: 21 weeks
Datasheet
Download the official IPP60R190C6XKSA1 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source IPP60R190C6XKSA1 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the IPP60R190C6XKSA1? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
NTMFS5C430NLT1G – onsemi
April 11, 2026
Looking for the NTMFS5C430NLT1G by onsemi? This n-channel 40 v 200a (tc) 3.8w (ta), 110w (tc) surface mount 5-dfn (5×6) (8-sofl) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The NTMFS5C430NLT1G is classified under Transistors in the Discrete Semiconductor Products category.
NTMFS5C430NLT1G Specifications
| Parameter |
Value |
| FET Type |
N-Channel |
| Technology |
MOSFET (Metal Oxide) |
| Drain to Source Voltage (Vdss) |
40 V |
| Current – Continuous Drain (Id) @ 25°C |
200A (Tc) |
| Drive Voltage (Max Rds On, Min Rds On) |
4.5V, 10V |
| Rds On (Max) @ Id, Vgs |
1.5mOhm @ 50A, 10V |
| Vgs(th) (Max) @ Id |
2V @ 250µA |
| Gate Charge (Qg) (Max) @ Vgs |
70 nC @ 10 V |
| Vgs (Max) |
±20V |
| Input Capacitance (Ciss) (Max) @ Vds |
4300 pF @ 20 V |
| Power Dissipation (Max) |
3.8W (Ta), 110W (Tc) |
| Operating Temperature |
-55°C ~ 175°C (TJ) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
5-DFN (5×6) (8-SOFL) |
| Package / Case |
8-PowerTDFN, 5 Leads |
Availability & Supply Status
- Status: Long Lead (43wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 759 units
- Manufacturer Stock: 1,500 units
- Standard Lead Time: 43 weeks
Datasheet
Download the official NTMFS5C430NLT1G datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source NTMFS5C430NLT1G from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the NTMFS5C430NLT1G? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32WLE5J8I6 – STMicroelectronics
April 11, 2026
Looking for the STM32WLE5J8I6 by STMicroelectronics? This ic rf txrx + mcu 802.15.4 lora™ 150mhz ~ 960mhz 73-ufbga is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32WLE5J8I6 is classified under RF Transceiver ICs in the RF and Wireless category.
STM32WLE5J8I6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Type |
TxRx + MCU |
| RF Family/Standard |
802.15.4 |
| Protocol |
LoRa™ |
| Modulation |
BPSK, GFSK, GMSK, FSK, MSK |
| Frequency |
150MHz ~ 960MHz |
| Data Rate (Max) |
300kbps |
| Power – Output |
22dBm |
| Sensitivity |
-148dBm |
| Memory Size |
64kB Flash |
| Serial Interfaces |
ADC, GPIO, I2C, SPI, IrDA, UART, USART |
| GPIO |
43 |
| Voltage – Supply |
1.8V ~ 3.6V |
| Current – Receiving |
63mA ~ 68mA |
| Current – Transmitting |
160mA ~ 310mA |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Package / Case |
73-UFBGA |
| Supplier Device Package |
73-UFBGA (5×5) |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 8,916 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32WLE5J8I6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32WLE5J8I6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32WLE5J8I6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
FDMC86244 – onsemi
April 11, 2026
Looking for the FDMC86244 by onsemi? This n-channel 150 v 2.8a (ta), 9.4a (tc) 2.3w (ta), 26w (tc) surface mount 8-mlp (3.3×3.3) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The FDMC86244 is classified under Transistors in the Discrete Semiconductor Products category, part of the PowerTrench® series.
FDMC86244 Specifications
| Parameter |
Value |
| FET Type |
N-Channel |
| Technology |
MOSFET (Metal Oxide) |
| Drain to Source Voltage (Vdss) |
150 V |
| Current – Continuous Drain (Id) @ 25°C |
2.8A (Ta), 9.4A (Tc) |
| Drive Voltage (Max Rds On, Min Rds On) |
6V, 10V |
| Rds On (Max) @ Id, Vgs |
134mOhm @ 2.8A, 10V |
| Vgs(th) (Max) @ Id |
4V @ 250µA |
| Gate Charge (Qg) (Max) @ Vgs |
5.9 nC @ 10 V |
| Vgs (Max) |
±20V |
| Input Capacitance (Ciss) (Max) @ Vds |
345 pF @ 75 V |
| Power Dissipation (Max) |
2.3W (Ta), 26W (Tc) |
| Operating Temperature |
-55°C ~ 150°C (TJ) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
8-MLP (3.3×3.3) |
| Package / Case |
8-PowerWDFN |
Availability & Supply Status
- Status: Long Lead (22wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 9,332 units
- Standard Lead Time: 22 weeks
Datasheet
Download the official FDMC86244 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source FDMC86244 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the FDMC86244? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.