AP7333-18SAG-7 – Diodes Incorporated
April 11, 2026
Looking for the AP7333-18SAG-7 by Diodes Incorporated? This linear voltage regulator ic positive fixed 1 output 300ma sot-23-3 is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The AP7333-18SAG-7 is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.
AP7333-18SAG-7 Specifications
| Parameter |
Value |
| Output Configuration |
Positive |
| Output Type |
Fixed |
| Number of Regulators |
1 |
| Voltage – Input (Max) |
6V |
| Voltage – Output (Min/Fixed) |
1.8V |
| Current – Output |
300mA |
| Current – Quiescent (Iq) |
75 µA |
| Current – Supply (Max) |
85 µA |
| PSRR |
65dB (100Hz) |
| Protection Features |
Over Current, Over Temperature, Short Circuit |
| Operating Temperature |
-40°C ~ 85°C |
| Mounting Type |
Surface Mount |
| Package / Case |
TO-236-3, SC-59, SOT-23-3 |
| Supplier Device Package |
SOT-23-3 |
Availability & Supply Status
- Status: Long Lead (40wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 1,171 units
- Manufacturer Stock: 3,000 units
- Standard Lead Time: 40 weeks
Datasheet
Download the official AP7333-18SAG-7 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source AP7333-18SAG-7 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the AP7333-18SAG-7? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F412ZGT6 – STMicroelectronics
April 11, 2026
Looking for the STM32F412ZGT6 by STMicroelectronics? This arm® cortex®-m4 stm32f4 microcontroller ic 32-bit 100mhz 1mb (1m x 8) flash 144-lqfp (20×20) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F412ZGT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F4 series.
STM32F412ZGT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
100MHz |
| Connectivity |
CANbus, EBI/EMI, I2C, IrDA, LINbus, MMC/SD/SDIO, QSPI, SPI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT |
| Number of I/O |
114 |
| Program Memory Size |
1MB (1M x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
256K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.7V ~ 3.6V |
| Data Converters |
A/D 16x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
144-LQFP (20×20) |
| Package / Case |
144-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 260 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F412ZGT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F412ZGT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F412ZGT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F207ICT6 – STMicroelectronics
April 11, 2026
Looking for the STM32F207ICT6 by STMicroelectronics? This arm® cortex®-m3 stm32f2 microcontroller ic 32-bit 120mhz 256kb (256k x 8) flash 176-lqfp (24×24) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F207ICT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F2 series.
STM32F207ICT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M3 |
| Core Size |
32-Bit |
| Speed |
120MHz |
| Connectivity |
CANbus, Ethernet, I2C, IrDA, LINbus, Memory Card, SPI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT |
| Number of I/O |
140 |
| Program Memory Size |
256KB (256K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
132K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.8V ~ 3.6V |
| Data Converters |
A/D 24x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
176-LQFP (24×24) |
| Package / Case |
176-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 317 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F207ICT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F207ICT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F207ICT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F469IGT6 – STMicroelectronics
April 10, 2026
Looking for the STM32F469IGT6 by STMicroelectronics? This arm® cortex®-m4 stm32f4 microcontroller ic 32-bit 180mhz 1mb (1m x 8) flash 176-lqfp (24×24) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F469IGT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F4 series.
STM32F469IGT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
180MHz |
| Connectivity |
CANbus, EBI/EMI, Ethernet, I2C, IrDA, LINbus, SAI, SDIO, SPI, UART/USART, USB, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT |
| Number of I/O |
131 |
| Program Memory Size |
1MB (1M x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
384K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.7V ~ 3.6V |
| Data Converters |
A/D 16x12b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
176-LQFP (24×24) |
| Package / Case |
176-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 1,742 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F469IGT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F469IGT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F469IGT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
ESP32-H2FH4 – Espressif Systems
April 10, 2026
Looking for the ESP32-H2FH4 by Espressif Systems? This ic rf txrx + mcu 802.15.4, bluetooth bluetooth v5.3, zigbee® 2.4ghz 32-vfqfn exposed pad is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The ESP32-H2FH4 is classified under RF Transceiver ICs in the RF and Wireless category, part of the ESP32-H2 series.
ESP32-H2FH4 Specifications
| Parameter |
Value |
| Type |
TxRx + MCU |
| RF Family/Standard |
802.15.4, Bluetooth |
| Protocol |
Bluetooth v5.3, Zigbee® |
| Modulation |
O-QPSK |
| Frequency |
2.4GHz |
| Data Rate (Max) |
5Mbps |
| Power – Output |
20dBm |
| Sensitivity |
-106.5dBm |
| Memory Size |
4MB Flash, 320kB SRAM, 128kB ROM |
| Serial Interfaces |
GPIO, I2C, I2S, IrDA, JTAG, PCM, PWM, SPI, UART, USB |
| GPIO |
19 |
| Voltage – Supply |
3V ~ 3.6V |
| Current – Receiving |
25mA ~ 27mA |
| Current – Transmitting |
26mA ~ 153mA |
| Operating Temperature |
-40°C ~ 105°C (TA) |
| Mounting Type |
Surface Mount |
| Package / Case |
32-VFQFN Exposed Pad |
| Supplier Device Package |
32-QFN (4×4) |
Availability & Supply Status
- Status: End of Life – Stock Available
- Lifecycle: End of Life
- Distribution Stock: 4,032 units
- Standard Lead Time: 4 weeks
Datasheet
Download the official ESP32-H2FH4 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source ESP32-H2FH4 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the ESP32-H2FH4? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
ICE40LP384-SG32 – Lattice Semiconductor Corporation
April 10, 2026
Looking for the ICE40LP384-SG32 by Lattice Semiconductor Corporation? This ice40™ lp field programmable gate array (fpga) ic 21 384 32-vfqfn exposed pad is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The ICE40LP384-SG32 is classified under Embedded in the Integrated Circuits (ICs) category, part of the iCE40™ LP series.
ICE40LP384-SG32 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Number of LABs/CLBs |
48 |
| Number of Logic Elements/Cells |
384 |
| Number of I/O |
21 |
| Voltage – Supply |
1.14V ~ 1.26V |
| Mounting Type |
Surface Mount |
| Operating Temperature |
-40°C ~ 100°C (TJ) |
| Package / Case |
32-VFQFN Exposed Pad |
| Supplier Device Package |
32-QFN (5×5) |
Availability & Supply Status
- Status: Long Lead (40wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 5,872 units
- Standard Lead Time: 40 weeks
Datasheet
Download the official ICE40LP384-SG32 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source ICE40LP384-SG32 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the ICE40LP384-SG32? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
MP1497DJ-LF-Z – Monolithic Power Systems Inc.
April 9, 2026
Looking for the MP1497DJ-LF-Z by Monolithic Power Systems Inc.? This buck switching regulator ic positive adjustable 0.8v 1 output 3a sot-23-8 thin, tsot-23-8 is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The MP1497DJ-LF-Z is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.
MP1497DJ-LF-Z Specifications
| Parameter |
Value |
| Function |
Step-Down |
| Output Configuration |
Positive |
| Topology |
Buck |
| Output Type |
Adjustable |
| Number of Outputs |
1 |
| Voltage – Input (Min) |
4.5V |
| Voltage – Input (Max) |
16V |
| Voltage – Output (Min/Fixed) |
0.8V |
| Voltage – Output (Max) |
13V |
| Current – Output |
3A |
| Frequency – Switching |
500kHz |
| Synchronous Rectifier |
Yes |
| Operating Temperature |
-40°C ~ 125°C (TJ) |
| Mounting Type |
Surface Mount |
| Package / Case |
SOT-23-8 Thin, TSOT-23-8 |
| Supplier Device Package |
TSOT-23-8 |
Availability & Supply Status
- Status: End of Life – Stock Available
- Lifecycle: End of Life
- Distribution Stock: 3,044 units
- Standard Lead Time: 32 weeks
Datasheet
Download the official MP1497DJ-LF-Z datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source MP1497DJ-LF-Z from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the MP1497DJ-LF-Z? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
IRFP150NPBF – Infineon Technologies
April 7, 2026
Looking for the IRFP150NPBF by Infineon Technologies? This n-channel 100 v 42a (tc) 160w (tc) through hole to-247ac is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The IRFP150NPBF is classified under Transistors in the Discrete Semiconductor Products category, part of the HEXFET® series.
IRFP150NPBF Specifications
| Parameter |
Value |
| FET Type |
N-Channel |
| Technology |
MOSFET (Metal Oxide) |
| Drain to Source Voltage (Vdss) |
100 V |
| Current – Continuous Drain (Id) @ 25°C |
42A (Tc) |
| Drive Voltage (Max Rds On, Min Rds On) |
10V |
| Rds On (Max) @ Id, Vgs |
36mOhm @ 23A, 10V |
| Vgs(th) (Max) @ Id |
4V @ 250µA |
| Gate Charge (Qg) (Max) @ Vgs |
110 nC @ 10 V |
| Vgs (Max) |
±20V |
| Input Capacitance (Ciss) (Max) @ Vds |
1900 pF @ 25 V |
| Power Dissipation (Max) |
160W (Tc) |
| Operating Temperature |
-55°C ~ 175°C (TJ) |
| Mounting Type |
Through Hole |
| Supplier Device Package |
TO-247AC |
| Package / Case |
TO-247-3 |
Availability & Supply Status
- Status: Long Lead (39wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 9,288 units
- Standard Lead Time: 39 weeks
Datasheet
Download the official IRFP150NPBF datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source IRFP150NPBF from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the IRFP150NPBF? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
EL817 – Everlight Electronics Co Ltd
April 7, 2026
Looking for the EL817 by Everlight Electronics Co Ltd? This optoisolator transistor output 5000vrms 1 channel 4-dip is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The EL817 is classified under Optocouplers, Optoisolators in the Isolators category.
EL817 Specifications
| Parameter |
Value |
| Number of Channels |
1 |
| Voltage – Isolation |
5000Vrms |
| Current Transfer Ratio (Min) |
50% @ 5mA |
| Current Transfer Ratio (Max) |
600% @ 5mA |
| Rise / Fall Time (Typ) |
4µs, 3µs |
| Input Type |
DC |
| Output Type |
Transistor |
| Voltage – Output (Max) |
35V |
| Current – Output / Channel |
50mA |
| Voltage – Forward (Vf) (Typ) |
1.2V |
| Current – DC Forward (If) (Max) |
60 mA |
| Vce Saturation (Max) |
200mV |
| Operating Temperature |
-55°C ~ 110°C |
| Mounting Type |
Through Hole |
| Package / Case |
4-DIP (0.300", 7.62mm) |
| Supplier Device Package |
4-DIP |
Availability & Supply Status
- Status: Long Lead (23wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 498 units
- Standard Lead Time: 23 weeks
Datasheet
Download the official EL817 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source EL817 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the EL817? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
SIT8008BI-23-33E-16.000000 – SiTime
April 7, 2026
Looking for the SIT8008BI-23-33E-16.000000 by SiTime? This 16 mhz xo (standard) hcmos, lvcmos oscillator 3.3v enable/disable 4-smd, no lead is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The SIT8008BI-23-33E-16.000000 is classified under Oscillators in the Crystals, Oscillators, Resonators category, part of the SiT8008B series.
SIT8008BI-23-33E-16.000000 Specifications
| Parameter |
Value |
| Base Resonator |
MEMS |
| Type |
XO (Standard) |
| Frequency |
16 MHz |
| Function |
Enable/Disable |
| Output |
HCMOS, LVCMOS |
| Voltage – Supply |
3.3V |
| Frequency Stability |
±50ppm |
| Operating Temperature |
-40°C ~ 85°C |
| Current – Supply (Max) |
4.5mA |
| Mounting Type |
Surface Mount |
| Package / Case |
4-SMD, No Lead |
| Supplier Device Package |
4-PQFN (3.2×2.5) |
| Size / Dimension |
0.126" L x 0.098" W (3.20mm x 2.50mm) |
| Height – Seated (Max) |
0.031" (0.80mm) |
Availability & Supply Status
- Status: Long Lead (26wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 887 units
- Manufacturer Stock: 7,095 units
- Standard Lead Time: 26 weeks
Datasheet
Download the official SIT8008BI-23-33E-16.000000 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source SIT8008BI-23-33E-16.000000 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the SIT8008BI-23-33E-16.000000? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.