NTMFS5C460NLT1G – onsemi
May 23, 2026
Looking for the NTMFS5C460NLT1G by onsemi? This n-channel 40 v 78a (tc) 3.6w (ta), 50w (tc) surface mount 5-dfn (5×6) (8-sofl) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The NTMFS5C460NLT1G is classified under Transistors in the Discrete Semiconductor Products category.
NTMFS5C460NLT1G Specifications
| Parameter |
Value |
| FET Type |
N-Channel |
| Technology |
MOSFET (Metal Oxide) |
| Drain to Source Voltage (Vdss) |
40 V |
| Current – Continuous Drain (Id) @ 25°C |
78A (Tc) |
| Drive Voltage (Max Rds On, Min Rds On) |
4.5V, 10V |
| Rds On (Max) @ Id, Vgs |
4.5mOhm @ 35A, 10V |
| Vgs(th) (Max) @ Id |
2V @ 250µA |
| Gate Charge (Qg) (Max) @ Vgs |
23 nC @ 10 V |
| Vgs (Max) |
±20V |
| Input Capacitance (Ciss) (Max) @ Vds |
1300 pF @ 20 V |
| Power Dissipation (Max) |
3.6W (Ta), 50W (Tc) |
| Operating Temperature |
-55°C ~ 175°C (TJ) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
5-DFN (5×6) (8-SOFL) |
| Package / Case |
8-PowerTDFN, 5 Leads |
Availability & Supply Status
- Status: Long Lead (52wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 4,892 units
- Standard Lead Time: 52 weeks
Datasheet
Download the official NTMFS5C460NLT1G datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source NTMFS5C460NLT1G from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the NTMFS5C460NLT1G? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
MP1471AGJ-Z – Monolithic Power Systems Inc.
May 23, 2026
Looking for the MP1471AGJ-Z by Monolithic Power Systems Inc.? This buck switching regulator ic positive adjustable 0.8v 1 output 3a sot-23-6 thin, tsot-23-6 is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The MP1471AGJ-Z is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.
MP1471AGJ-Z Specifications
| Parameter |
Value |
| Function |
Step-Down |
| Output Configuration |
Positive |
| Topology |
Buck |
| Output Type |
Adjustable |
| Number of Outputs |
1 |
| Voltage – Input (Min) |
4.5V |
| Voltage – Input (Max) |
16V |
| Voltage – Output (Min/Fixed) |
0.8V |
| Voltage – Output (Max) |
14.72V |
| Current – Output |
3A |
| Frequency – Switching |
500kHz |
| Synchronous Rectifier |
Yes |
| Operating Temperature |
-40°C ~ 125°C (TJ) |
| Mounting Type |
Surface Mount |
| Package / Case |
SOT-23-6 Thin, TSOT-23-6 |
| Supplier Device Package |
TSOT-23-6 |
Availability & Supply Status
- Status: End of Life – Stock Available
- Lifecycle: End of Life
- Distribution Stock: 2,744 units
- Standard Lead Time: 32 weeks
Datasheet
Download the official MP1471AGJ-Z datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source MP1471AGJ-Z from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the MP1471AGJ-Z? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
ESDA6V1BC6 – STMicroelectronics
May 23, 2026
Looking for the ESDA6V1BC6 by STMicroelectronics? This clamp ipp tvs diode surface mount sot-23-6 is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The ESDA6V1BC6 is classified under Transient Voltage Suppressors (TVS) in the Circuit Protection category, part of the ESDA, TRANSIL™ series.
ESDA6V1BC6 Specifications
| Parameter |
Value |
| Type |
Zener |
| Bidirectional Channels |
4 |
| Voltage – Reverse Standoff (Typ) |
5V |
| Voltage – Breakdown (Min) |
6.1V |
| Power – Peak Pulse |
80W |
| Power Line Protection |
No |
| Applications |
General Purpose |
| Operating Temperature |
-40°C ~ 125°C (TA) |
| Mounting Type |
Surface Mount |
| Package / Case |
SOT-23-6 |
| Supplier Device Package |
SOT-23-6 |
Availability & Supply Status
- Status: Long Lead (25wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 10,012 units
- Standard Lead Time: 25 weeks
Datasheet
Download the official ESDA6V1BC6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source ESDA6V1BC6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the ESDA6V1BC6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32H747BGT6 – STMicroelectronics
May 23, 2026
Looking for the STM32H747BGT6 by STMicroelectronics? This arm® cortex®-m4/m7 stm32h7 microcontroller ic 32-bit dual-core 240mhz, 480mhz 1mb (1m x 8) flash 208-lqfp (28×28) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32H747BGT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32H7 series.
STM32H747BGT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4/M7 |
| Core Size |
32-Bit Dual-Core |
| Speed |
240MHz, 480MHz |
| Connectivity |
CANbus, EBI/EMI, Ethernet, I2C, IrDA, LINbus, MDIO, MMC/SD/SDIO, QSPI, SAI, SPDIF, SPI, SWPMI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, LCD, POR, PWM, WDT |
| Number of I/O |
148 |
| Program Memory Size |
1MB (1M x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
1M x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.62V ~ 3.6V |
| Data Converters |
A/D 32x16b; D/A 2x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
208-LQFP (28×28) |
| Package / Case |
208-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 113 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32H747BGT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32H747BGT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32H747BGT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F401VCT6 – STMicroelectronics
May 23, 2026
Looking for the STM32F401VCT6 by STMicroelectronics? This arm® cortex®-m4 stm32f4 microcontroller ic 32-bit 84mhz 256kb (256k x 8) flash 100-lqfp (14×14) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F401VCT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F4 series.
STM32F401VCT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
84MHz |
| Connectivity |
I2C, IrDA, LINbus, SDIO, SPI, UART/USART, USB OTG |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, POR, PWM, WDT |
| Number of I/O |
81 |
| Program Memory Size |
256KB (256K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
64K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.7V ~ 3.6V |
| Data Converters |
A/D 16x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
100-LQFP (14×14) |
| Package / Case |
100-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 14,517 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F401VCT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F401VCT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F401VCT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F373CCT6 – STMicroelectronics
May 22, 2026
Looking for the STM32F373CCT6 by STMicroelectronics? This arm® cortex®-m4 stm32f3 microcontroller ic 32-bit 72mhz 256kb (256k x 8) flash 48-lqfp (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F373CCT6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F3 series.
STM32F373CCT6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
72MHz |
| Connectivity |
CANbus, I2C, IrDA, LINbus, SPI, UART/USART, USB |
| Peripherals |
DMA, I2S, POR, PWM, WDT |
| Number of I/O |
36 |
| Program Memory Size |
256KB (256K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
32K x 8 |
| Voltage – Supply (Vcc/Vdd) |
2V ~ 3.6V |
| Data Converters |
A/D 1x12b, 3x16b; D/A 3x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
48-LQFP (7×7) |
| Package / Case |
48-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 767 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F373CCT6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F373CCT6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F373CCT6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
NCP718BSN330T1G – onsemi
May 22, 2026
Looking for the NCP718BSN330T1G by onsemi? This linear voltage regulator ic positive fixed 1 output 300ma tsot-23-5 is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The NCP718BSN330T1G is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.
NCP718BSN330T1G Specifications
| Parameter |
Value |
| Output Configuration |
Positive |
| Output Type |
Fixed |
| Number of Regulators |
1 |
| Voltage – Input (Max) |
24V |
| Voltage – Output (Min/Fixed) |
3.3V |
| Voltage Dropout (Max) |
0.44V @ 300mA |
| Current – Output |
300mA |
| Current – Quiescent (Iq) |
8 µA |
| Current – Supply (Max) |
300 µA |
| PSRR |
60dB (1kHz) |
| Control Features |
Soft Start |
| Protection Features |
Over Current, Over Temperature |
| Operating Temperature |
-40°C ~ 125°C (TJ) |
| Mounting Type |
Surface Mount |
| Package / Case |
SOT-23-5 Thin, TSOT-23-5 |
| Supplier Device Package |
TSOT-23-5 |
Availability & Supply Status
- Status: Long Lead (35wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 10,903 units
- Standard Lead Time: 35 weeks
Datasheet
Download the official NCP718BSN330T1G datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source NCP718BSN330T1G from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the NCP718BSN330T1G? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F103R4T6A – STMicroelectronics
May 22, 2026
Looking for the STM32F103R4T6A by STMicroelectronics? This arm® cortex®-m3 stm32f1 microcontroller ic 32-bit 72mhz 16kb (16k x 8) flash is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F103R4T6A is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F1 series.
STM32F103R4T6A Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M3 |
| Core Size |
32-Bit |
| Speed |
72MHz |
| Connectivity |
CANbus, I2C, IrDA, LINbus, SPI, UART/USART, USB |
| Peripherals |
DMA, Motor Control PWM, PDR, POR, PVD, PWM, Temp Sensor, WDT |
| Number of I/O |
51 |
| Program Memory Size |
16KB (16K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
6K x 8 |
| Voltage – Supply (Vcc/Vdd) |
2V ~ 3.6V |
| Data Converters |
A/D 16x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Package / Case |
64-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 138 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F103R4T6A datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F103R4T6A from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F103R4T6A? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F410R8T6 – STMicroelectronics
May 22, 2026
Looking for the STM32F410R8T6 by STMicroelectronics? This arm® cortex®-m4 stm32f4 microcontroller ic 32-bit 100mhz 64kb (64k x 8) flash 64-lqfp (10×10) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F410R8T6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F4 series.
STM32F410R8T6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M4 |
| Core Size |
32-Bit |
| Speed |
100MHz |
| Connectivity |
I2C, IrDA, LINbus, SPI, UART/USART |
| Peripherals |
Brown-out Detect/Reset, DMA, I2S, POR, PWM, WDT |
| Number of I/O |
50 |
| Program Memory Size |
64KB (64K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
32K x 8 |
| Voltage – Supply (Vcc/Vdd) |
1.7V ~ 3.6V |
| Data Converters |
A/D 16x12b; D/A 1x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
64-LQFP (10×10) |
| Package / Case |
64-LQFP |
Availability & Supply Status
- Status: Long Lead (30wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 373 units
- Standard Lead Time: 30 weeks
Datasheet
Download the official STM32F410R8T6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F410R8T6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F410R8T6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
AK4458VN – Asahi Kasei Microdevices/AKM
May 22, 2026
Looking for the AK4458VN by Asahi Kasei Microdevices/AKM? This dac, audio 32 b 768k dsd, i2s 48-qfn (7×7) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The AK4458VN is classified under Data Acquisition in the Integrated Circuits (ICs) category.
AK4458VN Specifications
| Parameter |
Value |
| Type |
DAC, Audio |
| Number of Channels |
8 |
| Resolution (Bits) |
32 b |
| Sampling Rate (Per Second) |
768k |
| Data Interface |
DSD, I2S |
| Voltage Supply Source |
Analog and Digital |
| Voltage – Supply |
1.7V ~ 5.5V |
| Operating Temperature |
-40°C ~ 105°C |
| Mounting Type |
Surface Mount |
| Package / Case |
48-VFQFN Exposed Pad |
| Supplier Device Package |
48-QFN (7×7) |
Availability & Supply Status
- Status: Long Lead (22wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 2,539 units
- Standard Lead Time: 22 weeks
Datasheet
Download the official AK4458VN datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source AK4458VN from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the AK4458VN? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.