IR2184PBF – Infineon Technologies
April 4, 2026
Looking for the IR2184PBF by Infineon Technologies? This half-bridge gate driver ic non-inverting 8-pdip is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The IR2184PBF is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.
IR2184PBF Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Driven Configuration |
Half-Bridge |
| Channel Type |
Synchronous |
| Number of Drivers |
2 |
| Gate Type |
IGBT, MOSFET (N-Channel) |
| Voltage – Supply |
10V ~ 20V |
| Logic Voltage – VIL, VIH |
0.8V, 2.7V |
| Current – Peak Output (Source, Sink) |
1.9A, 2.3A |
| Input Type |
Non-Inverting |
| High Side Voltage – Max (Bootstrap) |
600 V |
| Rise / Fall Time (Typ) |
40ns, 20ns |
| Operating Temperature |
-40°C ~ 150°C (TJ) |
| Mounting Type |
Through Hole |
| Package / Case |
8-DIP (0.300", 7.62mm) |
| Supplier Device Package |
8-PDIP |
Availability & Supply Status
- Status: End of Life – Stock Available
- Lifecycle: End of Life
- Distribution Stock: 1,663 units
- Standard Lead Time: 29 weeks
Datasheet
Download the official IR2184PBF datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source IR2184PBF from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the IR2184PBF? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
LFE5UM-45F-7BG381I – Lattice Semiconductor Corporation
April 4, 2026
Looking for the LFE5UM-45F-7BG381I by Lattice Semiconductor Corporation? This ecp5 field programmable gate array (fpga) ic 203 1990656 44000 381-fbga is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The LFE5UM-45F-7BG381I is classified under Embedded in the Integrated Circuits (ICs) category, part of the ECP5 series.
LFE5UM-45F-7BG381I Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Number of LABs/CLBs |
11000 |
| Number of Logic Elements/Cells |
44000 |
| Total RAM Bits |
1990656 |
| Number of I/O |
203 |
| Voltage – Supply |
1.045V ~ 1.155V |
| Mounting Type |
Surface Mount |
| Operating Temperature |
-40°C ~ 100°C (TJ) |
| Package / Case |
381-FBGA |
| Supplier Device Package |
381-CABGA (17×17) |
Availability & Supply Status
- Status: Long Lead (40wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 164 units
- Standard Lead Time: 40 weeks
Datasheet
Download the official LFE5UM-45F-7BG381I datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source LFE5UM-45F-7BG381I from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the LFE5UM-45F-7BG381I? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
MT41K512M16VRP-107 AIT:P – Micron Technology Inc.
April 4, 2026
Looking for the MT41K512M16VRP-107 AIT:P by Micron Technology Inc.? This sdram – ddr3l memory ic 8gbit parallel 933 mhz 20 ns 96-fbga (8×14) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The MT41K512M16VRP-107 AIT:P is classified under Memory in the Integrated Circuits (ICs) category, part of the TwinDie™ series.
MT41K512M16VRP-107 AIT:P Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Memory Type |
Volatile |
| Memory Format |
DRAM |
| Technology |
SDRAM – DDR3L |
| Memory Size |
8Gbit |
| Memory Organization |
512M x 16 |
| Memory Interface |
Parallel |
| Clock Frequency |
933 MHz |
| Write Cycle Time – Word, Page |
15ns |
| Access Time |
20 ns |
| Voltage – Supply |
1.283V ~ 1.45V |
| Operating Temperature |
-40°C ~ 95°C (TC) |
| Mounting Type |
Surface Mount |
| Package / Case |
96-TFBGA |
| Supplier Device Package |
96-FBGA (8×14) |
Availability & Supply Status
- Status: Long Lead (26wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 107 units
- Standard Lead Time: 26 weeks
Datasheet
Download the official MT41K512M16VRP-107 AIT:P datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source MT41K512M16VRP-107 AIT:P from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the MT41K512M16VRP-107 AIT:P? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
NTMFS5C442NLT1G – onsemi
April 3, 2026
Looking for the NTMFS5C442NLT1G by onsemi? This n-channel 40 v 27a (ta), 130a (tc) 3.1w (ta), 69w (tc) surface mount 5-dfn (5×6) (8-sofl) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The NTMFS5C442NLT1G is classified under Transistors in the Discrete Semiconductor Products category.
NTMFS5C442NLT1G Specifications
| Parameter |
Value |
| FET Type |
N-Channel |
| Technology |
MOSFET (Metal Oxide) |
| Drain to Source Voltage (Vdss) |
40 V |
| Current – Continuous Drain (Id) @ 25°C |
27A (Ta), 130A (Tc) |
| Drive Voltage (Max Rds On, Min Rds On) |
4.5V, 10V |
| Rds On (Max) @ Id, Vgs |
2.8mOhm @ 50A, 10V |
| Vgs(th) (Max) @ Id |
2V @ 250µA |
| Gate Charge (Qg) (Max) @ Vgs |
50 nC @ 10 V |
| Vgs (Max) |
±20V |
| Input Capacitance (Ciss) (Max) @ Vds |
3100 pF @ 25 V |
| Power Dissipation (Max) |
3.1W (Ta), 69W (Tc) |
| Operating Temperature |
-55°C ~ 175°C (TJ) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
5-DFN (5×6) (8-SOFL) |
| Package / Case |
8-PowerTDFN, 5 Leads |
Availability & Supply Status
- Status: Long Lead (43wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 1,186 units
- Standard Lead Time: 43 weeks
Datasheet
Download the official NTMFS5C442NLT1G datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source NTMFS5C442NLT1G from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the NTMFS5C442NLT1G? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
ESP32-C3-MINI-1-N4 – Espressif Systems
April 3, 2026
Looking for the ESP32-C3-MINI-1-N4 by Espressif Systems? This bluetooth, wifi 802.11b/g/n, bluetooth v5.0 transceiver module 2.412ghz ~ 2.484ghz pcb trace surface mount is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The ESP32-C3-MINI-1-N4 is classified under RF Transceiver Modules and Modems in the RF and Wireless category, part of the ESP32-C3 series.
ESP32-C3-MINI-1-N4 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Verified |
| RF Family/Standard |
Bluetooth, WiFi |
| Protocol |
802.11b/g/n, Bluetooth v5.0 |
| Frequency |
2.412GHz ~ 2.484GHz |
| Data Rate |
150Mbps |
| Power – Output |
20.5dBm |
| Sensitivity |
-104dBm |
| Serial Interfaces |
ADC, GPIO, I2C, I2S, JTAG, PWM, SPI, UART, USB |
| Antenna Type |
PCB Trace |
| Utilized IC / Part |
ESP32-C3FN4 |
| Memory Size |
4MB Flash, 384kB ROM, 400kB SRAM |
| Voltage – Supply |
3V ~ 3.6V |
| Current – Receiving |
82mA ~ 84mA |
| Current – Transmitting |
290mA ~ 350mA |
| Mounting Type |
Surface Mount |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Package / Case |
53-SMD Module |
Availability & Supply Status
- Status: End of Life – Stock Available
- Lifecycle: End of Life
- Distribution Stock: 19,329 units
- Standard Lead Time: 8 weeks
Datasheet
Download the official ESP32-C3-MINI-1-N4 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source ESP32-C3-MINI-1-N4 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the ESP32-C3-MINI-1-N4? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
A3909GLNTR-T – Allegro MicroSystems
April 3, 2026
Looking for the A3909GLNTR-T by Allegro MicroSystems? This full bridge driver dc motors, general purpose, stepper motors dmos 10-ssop is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The A3909GLNTR-T is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.
A3909GLNTR-T Specifications
| Parameter |
Value |
| Output Configuration |
Full Bridge |
| Applications |
DC Motors, General Purpose, Stepper Motors |
| Interface |
Logic |
| Load Type |
Inductive |
| Technology |
DMOS |
| Rds On (Typ) |
1.6Ohm LS + HS |
| Current – Output / Channel |
1A |
| Voltage – Supply |
4V ~ 18V |
| Voltage – Load |
4V ~ 18V |
| Operating Temperature |
-40°C ~ 150°C (TJ) |
| Fault Protection |
Current Limiting, Over Temperature |
| Mounting Type |
Surface Mount |
| Package / Case |
10-SOP (0.154", 3.90mm Width) |
| Supplier Device Package |
10-SSOP |
Availability & Supply Status
- Status: Long Lead (24wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 17,975 units
- Standard Lead Time: 24 weeks
Datasheet
Download the official A3909GLNTR-T datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source A3909GLNTR-T from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the A3909GLNTR-T? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
TTL-232R-5V-PCB – FTDI, Future Technology Devices International Ltd
April 3, 2026
Looking for the TTL-232R-5V-PCB by FTDI, Future Technology Devices International Ltd? This uart usb to serial is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The TTL-232R-5V-PCB is classified under Adapters, Converters in the Computer Equipment category, part of the USBmadeEZ-UART series.
TTL-232R-5V-PCB Specifications
| Parameter |
Value |
| Type |
USB to Serial |
| Convert From (Adapter End) |
USB – A 2.0 Female |
| Convert To (Adapter End) |
PCB |
| Interface |
UART |
| Utilized IC / Part |
FT232RQ |
Availability & Supply Status
- Status: Long Lead (38wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 196 units
- Standard Lead Time: 38 weeks
Datasheet
Download the official TTL-232R-5V-PCB datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source TTL-232R-5V-PCB from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the TTL-232R-5V-PCB? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
AO3402 – Alpha & Omega Semiconductor Inc.
April 3, 2026
Looking for the AO3402 by Alpha & Omega Semiconductor Inc.? This n-channel 30 v 4a (ta) 1.4w (ta) surface mount sot-23-3 is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The AO3402 is classified under Transistors in the Discrete Semiconductor Products category.
AO3402 Specifications
| Parameter |
Value |
| FET Type |
N-Channel |
| Technology |
MOSFET (Metal Oxide) |
| Drain to Source Voltage (Vdss) |
30 V |
| Current – Continuous Drain (Id) @ 25°C |
4A (Ta) |
| Drive Voltage (Max Rds On, Min Rds On) |
2.5V, 10V |
| Rds On (Max) @ Id, Vgs |
55mOhm @ 4A, 10V |
| Vgs(th) (Max) @ Id |
1.4V @ 250µA |
| Gate Charge (Qg) (Max) @ Vgs |
4.34 nC @ 4.5 V |
| Vgs (Max) |
±12V |
| Input Capacitance (Ciss) (Max) @ Vds |
390 pF @ 15 V |
| Power Dissipation (Max) |
1.4W (Ta) |
| Operating Temperature |
-55°C ~ 150°C (TJ) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
SOT-23-3 |
| Package / Case |
3-SMD, SOT-23-3 Variant |
Availability & Supply Status
- Status: End of Life – Stock Available
- Lifecycle: End of Life
- Distribution Stock: 22,046 units
- Standard Lead Time: 20 weeks
Datasheet
Download the official AO3402 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source AO3402 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the AO3402? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
IRF540NPBF – Infineon Technologies
April 2, 2026
Looking for the IRF540NPBF by Infineon Technologies? This n-channel 100 v 33a (tc) 130w (tc) through hole to-220ab is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The IRF540NPBF is classified under Transistors in the Discrete Semiconductor Products category, part of the HEXFET® series.
IRF540NPBF Specifications
| Parameter |
Value |
| FET Type |
N-Channel |
| Technology |
MOSFET (Metal Oxide) |
| Drain to Source Voltage (Vdss) |
100 V |
| Current – Continuous Drain (Id) @ 25°C |
33A (Tc) |
| Drive Voltage (Max Rds On, Min Rds On) |
10V |
| Rds On (Max) @ Id, Vgs |
44mOhm @ 16A, 10V |
| Vgs(th) (Max) @ Id |
4V @ 250µA |
| Gate Charge (Qg) (Max) @ Vgs |
71 nC @ 10 V |
| Vgs (Max) |
±20V |
| Input Capacitance (Ciss) (Max) @ Vds |
1960 pF @ 25 V |
| Power Dissipation (Max) |
130W (Tc) |
| Operating Temperature |
-55°C ~ 175°C (TJ) |
| Mounting Type |
Through Hole |
| Supplier Device Package |
TO-220AB |
| Package / Case |
TO-220-3 |
Availability & Supply Status
- Status: Long Lead (35wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 23,608 units
- Standard Lead Time: 35 weeks
Datasheet
Download the official IRF540NPBF datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source IRF540NPBF from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the IRF540NPBF? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STM32F103C8T6 – STMicroelectronics
April 2, 2026
Looking for the STM32F103C8T6 by STMicroelectronics? This arm® cortex®-m3 stm32f1 microcontroller ic 32-bit 72mhz 64kb (64k x 8) flash is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STM32F103C8T6 is classified under Embedded in the Integrated Circuits (ICs) category, part of the STM32F1 series.
STM32F103C8T6 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| Core Processor |
ARM® Cortex®-M3 |
| Core Size |
32-Bit |
| Speed |
72MHz |
| Connectivity |
CANbus, I2C, IrDA, LINbus, SPI, UART/USART, USB |
| Peripherals |
DMA, Motor Control PWM, PDR, POR, PVD, PWM, Temp Sensor, WDT |
| Number of I/O |
37 |
| Program Memory Size |
64KB (64K x 8) |
| Program Memory Type |
FLASH |
| RAM Size |
20K x 8 |
| Voltage – Supply (Vcc/Vdd) |
2V ~ 3.6V |
| Data Converters |
A/D 10x12b |
| Oscillator Type |
Internal |
| Operating Temperature |
-40°C ~ 85°C (TA) |
| Mounting Type |
Surface Mount |
| Package / Case |
48-LQFP |
Availability & Supply Status
- Status: Long Lead (40wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 8,066 units
- Standard Lead Time: 40 weeks
Datasheet
Download the official STM32F103C8T6 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STM32F103C8T6 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STM32F103C8T6? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.