SI3443CDV-T1-GE3 – Vishay Siliconix
April 7, 2026
Looking for the SI3443CDV-T1-GE3 by Vishay Siliconix? This p-channel 20 v 5.97a (tc) 2w (ta), 3.2w (tc) surface mount 6-tsop is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The SI3443CDV-T1-GE3 is classified under Transistors in the Discrete Semiconductor Products category, part of the TrenchFET® series.
SI3443CDV-T1-GE3 Specifications
| Parameter |
Value |
| FET Type |
P-Channel |
| Technology |
MOSFET (Metal Oxide) |
| Drain to Source Voltage (Vdss) |
20 V |
| Current – Continuous Drain (Id) @ 25°C |
5.97A (Tc) |
| Drive Voltage (Max Rds On, Min Rds On) |
2.5V, 4.5V |
| Rds On (Max) @ Id, Vgs |
60mOhm @ 4.7A, 4.5V |
| Vgs(th) (Max) @ Id |
1.5V @ 250µA |
| Gate Charge (Qg) (Max) @ Vgs |
12.4 nC @ 5 V |
| Vgs (Max) |
±12V |
| Input Capacitance (Ciss) (Max) @ Vds |
610 pF @ 10 V |
| Power Dissipation (Max) |
2W (Ta), 3.2W (Tc) |
| Operating Temperature |
-55°C ~ 150°C (TJ) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
6-TSOP |
| Package / Case |
SOT-23-6 Thin, TSOT-23-6 |
Availability & Supply Status
- Status: Long Lead (49wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 15,039 units
- Standard Lead Time: 49 weeks
Datasheet
Download the official SI3443CDV-T1-GE3 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source SI3443CDV-T1-GE3 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the SI3443CDV-T1-GE3? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
LD39100PU33R – STMicroelectronics
April 6, 2026
Looking for the LD39100PU33R by STMicroelectronics? This linear voltage regulator ic positive fixed 1 output 1a 6-dfn (3×3) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The LD39100PU33R is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.
LD39100PU33R Specifications
| Parameter |
Value |
| Output Configuration |
Positive |
| Output Type |
Fixed |
| Number of Regulators |
1 |
| Voltage – Input (Max) |
5.5V |
| Voltage – Output (Min/Fixed) |
3.3V |
| Voltage Dropout (Max) |
0.4V @ 1A |
| Current – Output |
1A |
| Current – Quiescent (Iq) |
50 µA |
| Current – Supply (Max) |
300 µA |
| PSRR |
65dB ~ 62dB (1kHz ~ 10kHz) |
| Control Features |
Enable, Power Good |
| Protection Features |
Over Current, Over Temperature, Short Circuit |
| Operating Temperature |
-40°C ~ 125°C (TJ) |
| Mounting Type |
Surface Mount |
| Package / Case |
6-VDFN Exposed Pad |
| Supplier Device Package |
6-DFN (3×3) |
Availability & Supply Status
- Status: Long Lead (24wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 3,492 units
- Standard Lead Time: 24 weeks
Datasheet
Download the official LD39100PU33R datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source LD39100PU33R from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the LD39100PU33R? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
BSC014N06NSATMA1 – Infineon Technologies
April 6, 2026
Looking for the BSC014N06NSATMA1 by Infineon Technologies? This n-channel 60 v 30a (ta), 100a (tc) 2.5w (ta), 156w (tc) surface mount pg-tdson-8-17 is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The BSC014N06NSATMA1 is classified under Transistors in the Discrete Semiconductor Products category, part of the OptiMOS™ series.
BSC014N06NSATMA1 Specifications
| Parameter |
Value |
| FET Type |
N-Channel |
| Technology |
MOSFET (Metal Oxide) |
| Drain to Source Voltage (Vdss) |
60 V |
| Current – Continuous Drain (Id) @ 25°C |
30A (Ta), 100A (Tc) |
| Drive Voltage (Max Rds On, Min Rds On) |
6V, 10V |
| Rds On (Max) @ Id, Vgs |
1.45mOhm @ 50A, 10V |
| Vgs(th) (Max) @ Id |
2.8V @ 120µA |
| Gate Charge (Qg) (Max) @ Vgs |
89 nC @ 10 V |
| Vgs (Max) |
±20V |
| Input Capacitance (Ciss) (Max) @ Vds |
6500 pF @ 30 V |
| Power Dissipation (Max) |
2.5W (Ta), 156W (Tc) |
| Operating Temperature |
-55°C ~ 175°C (TJ) |
| Mounting Type |
Surface Mount |
| Supplier Device Package |
PG-TDSON-8-17 |
| Package / Case |
8-PowerTDFN |
Availability & Supply Status
- Status: Long Lead (61wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 32,415 units
- Standard Lead Time: 61 weeks
Datasheet
Download the official BSC014N06NSATMA1 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source BSC014N06NSATMA1 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the BSC014N06NSATMA1? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
0154003.DRT – Littelfuse Inc.
April 6, 2026
Looking for the 0154003.DRT by Littelfuse Inc.? This 3 a 125 v 125 v fuse board mount (cartridge style excluded) requires holder, surface mount 2-smd, square end block with holder is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The 0154003.DRT is classified under Fuses in the Circuit Protection category, part of the OMNI-BLOK® 154T series.
0154003.DRT Specifications
| Parameter |
Value |
| Mounting Type |
Requires Holder, Surface Mount |
| Fuse Type |
Board Mount (Cartridge Style Excluded) |
| Current Rating (Amps) |
3 A |
| Voltage Rating – AC |
125 V |
| Voltage Rating – DC |
125 V |
| Response Time |
Slow Blow |
| Package / Case |
2-SMD, Square End Block with Holder |
| Breaking Capacity @ Rated Voltage |
50A |
| Melting I²t |
20.16 |
| Approval Agency |
PSE, UL |
| Operating Temperature |
-55°C ~ 125°C |
| Color |
Tan |
| Size / Dimension |
0.383" L x 0.198" W x 0.150" H (9.73mm x 5.03mm x 3.81mm) |
Availability & Supply Status
- Status: Long Lead (23wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 7,605 units
- Standard Lead Time: 23 weeks
Datasheet
Download the official 0154003.DRT datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source 0154003.DRT from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the 0154003.DRT? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
ICM-20948 – TDK InvenSense
April 6, 2026
Looking for the ICM-20948 by TDK InvenSense? This accelerometer, gyroscope, magnetometer, 9 axis sensor i2c, spi output is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The ICM-20948 is classified under Motion Sensors in the Sensors, Transducers category.
ICM-20948 Specifications
| Parameter |
Value |
| Sensor Type |
Accelerometer, Gyroscope, Magnetometer, 9 Axis |
| Output Type |
I2C, SPI |
| Operating Temperature |
-40°C ~ 85°C |
| Package / Case |
24-TFQFN Module Exposed Pad |
| Supplier Device Package |
24-QFN (3×3) |
| Mounting Type |
Surface Mount |
Availability & Supply Status
- Status: End of Life – Stock Available
- Lifecycle: End of Life
- Distribution Stock: 8,563 units
- Standard Lead Time: 45 weeks
Datasheet
Download the official ICM-20948 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source ICM-20948 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the ICM-20948? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
5807 – Adafruit Industries LLC
April 6, 2026
Looking for the 5807 by Adafruit Industries LLC? This husb238 – usb type-c power delivery (pd) power management evaluation board is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The 5807 is classified under Evaluation Boards in the Development Boards, Kits, Programmers category.
5807 Specifications
| Parameter |
Value |
| Type |
Power Management |
| Function |
USB Type-C Power Delivery (PD) |
| Embedded |
No |
| Utilized IC / Part |
HUSB238 |
| Secondary Attributes |
I2C Interface(s) |
| Contents |
Board(s) |
Availability & Supply Status
- Status: Long Lead (24wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 822 units
- Standard Lead Time: 24 weeks
Why Source 5807 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the 5807? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
ESP32-S2-MINI-1U-N4 – Espressif Systems
April 6, 2026
Looking for the ESP32-S2-MINI-1U-N4 by Espressif Systems? This wifi 802.11b/g/n transceiver module 2.412ghz ~ 2.484ghz antenna not included, w.fl surface mount is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The ESP32-S2-MINI-1U-N4 is classified under RF Transceiver Modules and Modems in the RF and Wireless category, part of the ESP32 series.
ESP32-S2-MINI-1U-N4 Specifications
| Parameter |
Value |
| DigiKey Programmable |
Not Verified |
| RF Family/Standard |
WiFi |
| Protocol |
802.11b/g/n |
| Frequency |
2.412GHz ~ 2.484GHz |
| Data Rate |
150Mbps |
| Power – Output |
19.5dBm |
| Sensitivity |
-97dBm |
| Serial Interfaces |
ADC, GPIO, I2C, I2S, SPI, PWM, UART, USB |
| Antenna Type |
Antenna Not Included, W.FL |
| Utilized IC / Part |
ESP32-S2 |
| Memory Size |
128kB ROM, 320kB SRAM |
| Voltage – Supply |
3V ~ 3.6V |
| Current – Receiving |
63mA ~ 68mA |
| Current – Transmitting |
160mA ~ 310mA |
| Mounting Type |
Surface Mount |
| Operating Temperature |
-40°C ~ 85°C |
| Package / Case |
65-SMD Module |
Availability & Supply Status
- Status: End of Life – Stock Available
- Lifecycle: End of Life
- Distribution Stock: 1,216 units
- Standard Lead Time: 8 weeks
Datasheet
Download the official ESP32-S2-MINI-1U-N4 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source ESP32-S2-MINI-1U-N4 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the ESP32-S2-MINI-1U-N4? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
IRLZ34NPBF – Infineon Technologies
April 5, 2026
Looking for the IRLZ34NPBF by Infineon Technologies? This n-channel 55 v 30a (tc) 68w (tc) through hole to-220ab is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The IRLZ34NPBF is classified under Transistors in the Discrete Semiconductor Products category, part of the HEXFET® series.
IRLZ34NPBF Specifications
| Parameter |
Value |
| FET Type |
N-Channel |
| Technology |
MOSFET (Metal Oxide) |
| Drain to Source Voltage (Vdss) |
55 V |
| Current – Continuous Drain (Id) @ 25°C |
30A (Tc) |
| Drive Voltage (Max Rds On, Min Rds On) |
4V, 10V |
| Rds On (Max) @ Id, Vgs |
35mOhm @ 16A, 10V |
| Vgs(th) (Max) @ Id |
2V @ 250µA |
| Gate Charge (Qg) (Max) @ Vgs |
25 nC @ 5 V |
| Vgs (Max) |
±16V |
| Input Capacitance (Ciss) (Max) @ Vds |
880 pF @ 25 V |
| Power Dissipation (Max) |
68W (Tc) |
| Operating Temperature |
-55°C ~ 175°C (TJ) |
| Mounting Type |
Through Hole |
| Supplier Device Package |
TO-220AB |
| Package / Case |
TO-220-3 |
Availability & Supply Status
- Status: End of Life – Stock Available
- Lifecycle: End of Life
- Distribution Stock: 8,375 units
- Standard Lead Time: 35 weeks
Datasheet
Download the official IRLZ34NPBF datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source IRLZ34NPBF from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the IRLZ34NPBF? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
STSPIN820 – STMicroelectronics
April 5, 2026
Looking for the STSPIN820 by STMicroelectronics? This bipolar motor driver power mosfet logic 24-tqfpn (4×4) is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The STSPIN820 is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category, part of the STSPIN8 series.
STSPIN820 Specifications
| Parameter |
Value |
| Motor Type – Stepper |
Bipolar |
| Function |
Driver – Fully Integrated, Control and Power Stage |
| Output Configuration |
Half Bridge (4) |
| Interface |
Logic |
| Technology |
Power MOSFET |
| Step Resolution |
1 ~ 1/256 |
| Applications |
Industrial |
| Current – Output |
1.5A |
| Voltage – Supply |
7V ~ 45V |
| Operating Temperature |
-40°C ~ 150°C (TJ) |
| Mounting Type |
Surface Mount |
| Package / Case |
24-TFQFN Exposed Pad |
| Supplier Device Package |
24-TQFPN (4×4) |
Availability & Supply Status
- Status: Long Lead (25wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 10,472 units
- Standard Lead Time: 25 weeks
Datasheet
Download the official STSPIN820 datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source STSPIN820 from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the STSPIN820? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.
MP2143DJ-LF-Z – Monolithic Power Systems Inc.
April 4, 2026
Looking for the MP2143DJ-LF-Z by Monolithic Power Systems Inc.? This buck switching regulator ic positive adjustable 0.6v 1 output 3a sot-23-8 thin, tsot-23-8 is showing supply chain risk indicators that may affect availability. ICCorders can help secure stock before it becomes unavailable.
The MP2143DJ-LF-Z is classified under Power Management (PMIC) in the Integrated Circuits (ICs) category.
MP2143DJ-LF-Z Specifications
| Parameter |
Value |
| Function |
Step-Down |
| Output Configuration |
Positive |
| Topology |
Buck |
| Output Type |
Adjustable |
| Number of Outputs |
1 |
| Voltage – Input (Min) |
2.5V |
| Voltage – Input (Max) |
5.5V |
| Voltage – Output (Min/Fixed) |
0.6V |
| Voltage – Output (Max) |
5V |
| Current – Output |
3A |
| Frequency – Switching |
1.2MHz |
| Synchronous Rectifier |
Yes |
| Operating Temperature |
-40°C ~ 125°C (TJ) |
| Mounting Type |
Surface Mount |
| Package / Case |
SOT-23-8 Thin, TSOT-23-8 |
| Supplier Device Package |
TSOT-23-8 |
Availability & Supply Status
- Status: Long Lead (28wk) – We May Beat This
- Lifecycle: Active
- Distribution Stock: 206 units
- Standard Lead Time: 28 weeks
Datasheet
Download the official MP2143DJ-LF-Z datasheet (PDF) for full electrical characteristics, pinout diagrams, and application notes.
Why Source MP2143DJ-LF-Z from ICCorders?
- Verified & Tested: Every component undergoes rigorous testing. No counterfeits, guaranteed.
- Full Traceability: Complete documentation and chain of custody for every part.
- Global Sourcing Network: Access to stock that standard distributors cannot reach.
- Payment Terms Available: Credit terms for qualified buyers. You don’t pay until you’re satisfied.
Request a Quote
Need the MP2143DJ-LF-Z? Request a quote today or use our BOM Risk Analysis Tool to check your full bill of materials.